Snow/Ice Removal Service FA446026Q0004
Summary
AI-generated · Jan 29, 2026Clear snow and ice from all paved surfaces, including roadways, parking areas, and walkways, as designated by the government representative in priority order. Plow snow into designated storage areas, ensuring access to fire hydrants, buildings, and other critical infrastructure is not obstructed, and take care not to damage signs, signposts, speed bumps, parking blocks, or nearby vehicles.
After a designated area is cleared, report completion to the government representative for surveillance and to receive deicing material as needed. Provide and maintain a fleet of vehicles and equipment sufficient to meet the PWS requirements, with all vehicles clearly marked with the contractor’s name. Respond to a snow/ice removal request within eight hours after snowfall ceases, and perform all work in accordance with the PWS.
The contractor shall clear snow and ice from all paved surfaces, including but not limited to roadways, parking areas, and walkways as designated by the government representative in priority order. Snow shall be plowed into designated storage areas set by the government representative and shall not obstruct access to fire hydrants, buildings, or other critical infrastructure. The contractor should be careful not to damage any signs, signposts, speed bumps, parking blocks or vehicles around the work area. Once a designated area is cleared the contractor shall report it to the government representative for surveillance and to have the government put down deicing material as necessary. The contractor shall provide and maintain a fleet of vehicles and equipment sufficient to meet the requirements of this PWS. All vehicles shall be clearly marked with the contractors company name. Contractor has eight hours to respond to a snow/ice removal request by the government representative once the snow/ice has stopped falling. This is all done in accordance with the PWS. Attachments: 1. Combo - Snow Ice Removal Service 2. PWS - SNOW ICE REMOVAL SERVICES 3. Addendum - 52.212-1, Instructions to Offeror 4. Addendum - 52.212-2, Evaluation Factors 5. SCA Wage Determination
From Combined Synopsis/Solicitation posted on Jan 28, 2026Notice history
1Details
Award Information
Not yet awarded
Contacts
Phone
Phone
Agency
Place of Performance
USA