Site Support Yuma AZ SP470625Q0049
Summary
AI-generated · Aug 27, 2025Testing and/or replacing the old wiring for the automatic start/stop relays that run from the PLC cabinet to the Rotary and Fixed Wing areas as part of the EAOTS Automated Hydrant Fueling Automation Maintenance (HFAM) program. The goal is to ensure reliable operation of the hydrant fueling automation by verifying wiring integrity and relay functionality.
Pay particular attention to Signal Vault 4, where previous repairs were made and the relay wiring may not have been reconnected properly. If testing shows the wiring is bad or misconnected, install new wiring and conduct functional testing to confirm proper start/stop relay operation and overall system performance.
As part of the Energy Automation Operational Technology Sustainment (EAOTS) Automated Hydrant Fueling Automation Maintenance (HFAM). The task is to test and/or replace the old wiring for the Auto start/stop relays from the PLC cabinet to the Rotary and Fixed wing areas. Signal vault 4 had repairs made to the wiring previously and the relay wiring may not have been reconnected properly. If the wiring is found to be bad, then connect new wiring and test for proper functionality.
From Solicitation posted on Aug 04, 2025Notice history
1Details
Award Information
Not yet awarded
Contacts
Phone
Agency
Place of Performance
USA