Shredder Power Installation FA750125Q0048
Summary
AI-generated · Aug 24, 2025Upgrade power capacity to support installing a shredder. Install two electrical circuits: a 480-volt, three-phase, 30-amp circuit and a 120-volt, single-phase, 30-amp circuit. The circuits will be fed from two separate electrical panels, EHB (480-volt panel) and ELB (120-volt panel), located in the same mechanical room.
Two records describe the same scope with no changes between notices. There is no new information or differing requirements in the second posting.
Upgrade power capacity to accommodate the installation of a shredder. Install two electrical circuits: a 480 volt, three-phase, 30-amp; and a 120 volt, single-phase, 30-amp. The circuits will be fed from two separate electrical panels: EHB (480-volt panel) and ELB (120-volt panel) located in the same mechanical room.
From Combined Synopsis/Solicitation posted on Jun 17, 2025Upgrade power capacity to accommodate the installation of a shredder. Install two electrical circuits: a 480 volt, three-phase, 30-amp; and a 120 volt, single-phase, 30-amp. The circuits will be fed from two separate electrical panels: EHB (480-volt panel) and ELB (120-volt panel) located in the same mechanical room.
From Combined Synopsis/Solicitation posted on Jul 01, 2025Notice history
2-
-
Combined Synopsis/Solicitation LATEST Posted Jul 01, 2025View changes (1)
- Response Deadline: Jul 01, 2025 → Jul 02, 2025
Details
Award Information
Not yet awarded
Contacts
Agency
Place of Performance
USA