Shell Falls Primary Power 1240LT26Q0038
Summary
AI-generated · Mar 24, 2026Contractor shall furnish all labor, materials, equipment, miscellaneous items, freight, delivery, and all required licenses and permits to complete improvements at Shell Falls Wayside to address the site's primary power supply, revise the on-site wastewater system, and reinstall the water system, in accordance with the Statement of Work, drawings, and applicable specifications. The project is expected to be in the $1,000,000 to $5,000,000 range.
An organized site visit is scheduled for prospective bidders at Shell Falls Wayside, Bighorn National Forest, along U.S. Highway 14 in Bighorn County, Wyoming, to review site conditions and the project scope before bidding.
Shell Falls Primary Power The project requires the contractor to be responsible for supplying all labor, materials, equipment, miscellaneous items, freight, delivery, and all necessary valid licenses and permits required to complete the improvements at the Bighorn National Forest, Shell Falls Wayside addressing the sites primary power supply. This project aims to address on-site generated power, wastewater system revisions and water system reinstallation IAW the Statement of Work, drawings and applicable specifications. NAICS:237990. NAICS Small Business Size Standard: $45M Magnitude of Construction is between $1,000,000 and $5,000,000 This is solicited 100% Small Business Organized Site Visit Name: Christopher Wolffing Address: Approximately 26 miles east of Greybull, and 69 miles west of Sheridan, along U.S. Highway 14 in Bighorn County, Wyoming. The site legal description is the East Section 7, T53N, R89W. Date and Time: April 1, 2026, 10:00 AM Mountain Telephone: 307-674-2647 Email: Christopher.wolffing@usda.gov Questions shall be submitted via email to erick.plamann@usda.gov and are due no later than April 8, 2026, at 12:00 PM Central Time. No other means will be accepted
From Combined Synopsis/Solicitation posted on Mar 23, 2026Shell Falls Primary Power The project requires the contractor to be responsible for supplying all labor, materials, equipment, miscellaneous items, freight, delivery, and all necessary valid licenses and permits required to complete the improvements at the Bighorn National Forest, Shell Falls Wayside addressing the sites primary power supply. This project aims to address on-site generated power, wastewater system revisions and water system reinstallation IAW the Statement of Work, drawings and applicable specifications. NAICS:237990. NAICS Small Business Size Standard: $45M Magnitude of Construction is between $1,000,000 and $5,000,000 This is solicited 100% Small Business Organized Site Visit Name: Christopher Wolffing Address: Approximately 26 miles east of Greybull, and 69 miles west of Sheridan, along U.S. Highway 14 in Bighorn County, Wyoming. The site legal description is the East Section 7, T53N, R89W. Date and Time: April 1, 2026, 10:00 AM Mountain Telephone: 307-674-2647 Email: Christopher.wolffing@usda.gov Questions shall be submitted via email to erick.plamann@usda.gov and are due no later than April 8, 2026, at 12:00 PM Central Time. No other means will be accepted
From Combined Synopsis/Solicitation posted on Apr 10, 2026Notice history
2-
-
Combined Synopsis/Solicitation LATEST Posted Apr 10, 2026No changes from previous notice
Details
Award Information
Not yet awarded