Shear Pin FA820625Q0725
Summary
AI-generated · Aug 24, 2025Provide shear pins with required first article destructive testing. Produce 300 units, with 30 units allocated for destructive testing. For every lot of 100 production units, test 10 units destructively; any failed test results in rejection of that production lot. Submit a contractor-tested first article plan and a first article test report in accordance with CDRL 1423, using the attached QuoteBidSheet.xl for pricing. Access to drawings/specifications requires current JCP certification and will be granted after requesting access through SAM.gov.
Hill AFB has a requirement for shear pins with first article destructive testing. Please provide your quote utilizing the attached QuoteBidSheet.xl no later than 22 August 2025 by 1700 MST. Additional info, The production quantity is 300 and the destructive testing quantity is an additional 30 units. Destructive testing, 10 units should be tested in every lot of 100 production units. Failed tests will result in a rejection of the production lot. A contractor-testing first article test plan is required along with a first article test report, see CDRL 1423. Please review all attached docs for further, I am standing by should there be any questions/concerns. ***For access to drawings/specs send current JCP certification to arthur.gumushyan@us.af.mil immediately after requesting access through SAM.gov.**** Respectfully, Arthur T. Gumushyan, Captain, USAF Contracting Officer
From Solicitation posted on Jul 22, 2025Notice history
1Details
Award Information
Not yet awarded
Documents
9Contacts
Agency
Place of Performance
USA