Sewage Line Breaks- Paris Landing 70Z02925QNEWO0029
Summary
AI-generated · Aug 23, 2025Repair line breaks and clear root obstructions across segments totaling about 350 feet of 4- and 6-inch underground pipe/PVC. Provide all labor, materials, and equipment, with work performed strictly per the Statement of Work. Before submitting a quote, review the SOW; a mandatory site visit is strongly recommended to take measurements and understand field conditions. After award, a pre-conference will be held prior to starting work at Paris Landing, Buchanan, TN; all work must comply with the SOW.
Firm-fixed-price purchase order to be awarded to the lowest technically acceptable bidder. The contractor must designate the portions of contract work to be performed with their own forces, as outlined in the approved schedule of costs; material and equipment installed by contractor labor may be included in the work value, while executive/administrative tasks are excluded. The contractor must be SAM-registered and provide the representations required by clause 52.236-1; the Performance of Work by the Contractor clause applies. See Attachment B for additional detail.
The United States Coast Guard is accepting quotes for qualified individuals or firms to provide all labor, materials, and equipment necessary to Repair line breaks and clear root obstructions across segments of 350 feet of 4- and 6-inch underground pipe/PVC. Prior to submitting a quote, it is mandatory to examine the Statement of Work (SOW), and it is highly recommended to visit the facility to take field measurements, evaluations, etc., and become familiar with existing conditions under which the work will be performed. After the award of contract, a pre-conference will be held before starting the work at Paris Landing in Buchanan TN. All work is to be completed in accordance with the SOW. This will be a firm-fixed priced purchase order awarded to the lowest reasonable price technically acceptable bidder. This is a set aside 100% for small business. All contractors must be actively registered in SAM.gov and must provide representations prescribed in clause 52.236-1 in Section III of the attached contract format document to be considered. Far clause 52.236-1 Performance of Work by the Contractor applies to the solicitation and award. The Contractor shall submit, simultaneously with the schedule of costs required by the Payments under Fixed-Price Construction Contracts clause of the contract, a statement designating the portions of contract work to be performed with the Contractor's own forces. The approved schedule of costs will be used in determining the value of a work activity/event, or portions thereof, of the work for the purpose of this article. See Attachment B for more detail. In establishing the percent of work to be performed by the Contractor. Cost of material and equipment installed by such labor may be included. The work by the Contractor's executive, administrative and clerical forces shall be excluded in establishing compliance with the requirements of this clause. Site Visit POC: MKC South Knight (706) 410-5764 southworth.m.knight@uscg.mil DC2 Evan Lipscomb (804) 615-2216 evan.s.lipscomb@uscg.mil Submit quotes to: Kala.m.lowe@uscg.mil NAICS: 237110 PSC: Y1NE 36.204 Disclosure of the magnitude of construction projects. Under $35,000
From Combined Synopsis/Solicitation posted on Jun 12, 2025Notice history
1Details
Award Information
Not yet awarded
Contacts
Phone
Phone
Agency
Place of Performance
USA