Security Fence W912EK26QA003
Summary
AI-generated · Nov 15, 2025Supply and install a 515-foot chain-link security fence with a double swing gate and a fixed cantilever panel at the Peoria, IL site to enhance perimeter security. Completion must occur within eight weeks of contract award. The contractor must provide all materials, labor, and equipment and meet the project’s specifications for barbed wire, fence fabric, posts, concrete, and related components as detailed in the attachments and specifications.
The US Army Corps of Engineers requires a contractor to supply and install a new 515-foot chain-link security fence, including a double swing gate and a fixed cantilever panel, at their Peoria, IL location within 8 weeks of contract award. The contractor is responsible for all materials, labor, and equipment, adhering to specific standards for barbed wire, fence fabric, posts, concrete, and other components as detailed in the attachments and specifications.
From Solicitation posted on Nov 14, 2025The US Army Corps of Engineers requires a contractor to supply and install a new 515-foot chain-link security fence, including a double swing gate and a fixed cantilever panel, at their Peoria, IL location within 8 weeks of contract award. The contractor is responsible for all materials, labor, and equipment, adhering to specific standards for barbed wire, fence fabric, posts, concrete, and other components as detailed in the attachments and specifications. Amended11/17/2025: To add attachment #3 and to add extra copy of the Scope of Work as the one contained within the soliciation document lacks a diagram.
From Solicitation posted on Nov 17, 2025The US Army Corps of Engineers requires a contractor to supply and install a new 515-foot chain-link security fence, including a double swing gate and a fixed cantilever panel, at their Peoria, IL location within 8 weeks of contract award. The contractor is responsible for all materials, labor, and equipment, adhering to specific standards for barbed wire, fence fabric, posts, concrete, and other components as detailed in the attachments and specifications. Amended 11/25/2025: A Question and Answer (Q&A) document has been added to the solicitation to provide further clarification and assist bidders in preparing their quotes. Also added clauses 252.225-7000 and 252.225-7001. Amended11/17/2025: To add attachment #3 and to add extra copy of the Scope of Work as the one contained within the soliciation document lacks a diagram.
From Solicitation posted on Nov 25, 2025Notice history
3Details
Award Information
Not yet awarded
Documents
7Contacts
Agency
Place of Performance
USA