SD FLAP SDGFP PARKING(1) North Point Parking Lot 6982AF26B000005
Summary
AI-generated · May 20, 2026Reconstruction of the pavement serving the boat ramp parking lot at the North Point Recreation Area near Pickstown, SD, addressing deteriorated pavement and sub-base for the 98,000-square-foot lot on the east side of North Bay upstream of the Fort Randall Dam. A new pavement surface will be installed while maintaining the operational qualities of this popular summer boat launch area.
Work includes removing the existing asphalt and base to a depth of 9.5 inches, placing 3.5 inches of asphalt over 6 inches of aggregate base, and subexcavating poor subgrade soils. Parking lot slopes will be adjusted to match existing conditions with minor changes to create an ADA-compliant handicap stall. A concrete dumpster pad, signing, and striping are included, and the parking lot will be closed during construction. Principal quantities: roadway excavation 5,700 cubic yards; subexcavation 3,000 cubic yards; roadway aggregate, Method 2 3,800 tons; asphalt concrete pavement 2,300 tons.
PROJECT DESCRIPTION: The proposed scope of this project includes reconstruction of the pavement within a parking lot servicing the boat ramp in the North Point Recreation Area near Pickstown, South Dakota. The project will address deteriorated pavement and sub-base for the 98,000 square-foot parking lot on the east side of the North Bay just upstream of the Fort Randall dam on the Missouri River. The project will provide a new pavement surface for the parking area while maintaining the operational qualities of this popular summer boat launch area. SCOPE OF THE WORK: The project will consist of removal of excavating the existing parking lot s asphalt and base to a depth of 9.5-inches and placement of a 3.5-in asphalt pavement on 6-inches of aggregate base. Subexcavation work includes removing poor subgrade soils in the area. Parking lot slopes will match existing conditions with minor adjustments made to create an American Disabilities Act compliant handicap parking stall. A concrete pad for a dumpster and signing and striping are also included in the project. The parking lot will be closed during construction activities. PRINCIPAL WORK ITEMS: 20401-0000 Roadway Excavation: 5,700 CUYD 20402-0000 Subexcavation: 3,000 CUYD 30202-2000 Roadway Aggregate, Method 2: 3,800 TON 40301-0000 Asphalt Concrete Pavement, 2,300 TON
From Solicitation posted on May 19, 2026PROJECT DESCRIPTION: The proposed scope of this project includes reconstruction of the pavement within a parking lot servicing the boat ramp in the North Point Recreation Area near Pickstown, South Dakota. The project will address deteriorated pavement and sub-base for the 98,000 square-foot parking lot on the east side of the North Bay just upstream of the Fort Randall dam on the Missouri River. The project will provide a new pavement surface for the parking area while maintaining the operational qualities of this popular summer boat launch area. SCOPE OF THE WORK: The project will consist of removal of excavating the existing parking lot s asphalt and base to a depth of 9.5-inches and placement of a 3.5-in asphalt pavement on 6-inches of aggregate base. Subexcavation work includes removing poor subgrade soils in the area. Parking lot slopes will match existing conditions with minor adjustments made to create an American Disabilities Act compliant handicap parking stall. A concrete pad for a dumpster and signing and striping are also included in the project. The parking lot will be closed during construction activities. PRINCIPAL WORK ITEMS: 20401-0000 Roadway Excavation: 5,700 CUYD 20402-0000 Subexcavation: 3,000 CUYD 30202-2000 Roadway Aggregate, Method 2: 3,800 TON 40301-0000 Asphalt Concrete Pavement, 2,300 TON
From Solicitation posted on Jul 08, 2026Notice history
2-
-
Solicitation LATEST Posted Jul 08, 2026No changes from previous notice
Details
Award Information
Not yet awarded
Contacts
Agency
Place of Performance
USA