SD FLAP SDGFP PARKING(1) NORTH POINT PARKING LOT 6982AF26B000002
Summary
AI-generated · Apr 01, 2026Reconstruct and repave the North Point parking lot at the North Point Recreation Area near Pickstown, SD, which serves the boat ramp. Remove deteriorated asphalt and base to a depth of 9.5 inches, then place 3.5 inches of asphalt over 6 inches of aggregate base, with subexcavation to remove poor subgrade soils. Slopes will be adjusted to maintain existing grades and create an ADA-compliant handicap space, and a concrete dumpster pad plus signing and striping will be installed. The lot will be closed to traffic during construction.
Project work elements include 5,700 cubic yards of roadway excavation, 3,000 cubic yards of subexcavation, 3,800 tons of roadway aggregate (method 2), and 2,300 tons of asphalt concrete pavement. Plans and specifications are not available; the project will be procured through full and open competition, with an estimated total cost in the range of $2,000,000 to $5,000,000.
THIS IS NOT AN INVITIATION FOR BID, PLAN AND SPEFICIATIONS ARE NOT AVAILBLE PROJECT NUMBER: SD FLAP SDGFP PARKING(1) PROJECT NAME: NORTH POINT PARKING LOT PROJECT DESCRIPTION: The proposed scope of this project includes reconstruction of the pavement within a parking lot servicing the boat ramp in the North Point Recreation Area near Pickstown, South Dakota. The project will address deteriorated pavement and sub-base for the 98,000 square-foot parking lot on the east side of the North Bay just upstream of the Fort Randall dam on the Missouri River. The project will provide a new pavement surface for the parking area while maintaining the operational qualities of this popular summer boat launch area. SCOPE OF THE WORK: The project will consist of removal of excavating the existing parking lot s asphalt and base to a depth of 9.5-inches and placement of a 3.5-in asphalt pavement on 6-inches of aggregate base. Subexcavation work includes removing poor subgrade soils in the area. Parking lot slopes will match existing conditions with minor adjustments made to create an American Disabilities Act compliant handicap parking stall. A concrete pad for a dumpster and signing and striping are also included in the project. The parking lot will be closed during construction activities. PRINCIPAL WORK ITEMS: 20401-0000 Roadway Excavation: 5,700 CUYD 20402-0000 Subexcavation: 3,000 CUYD 30202-2000 Roadway Aggregate, Method 2: 3,800 TON 40301-0000 Asphalt Concrete Pavement, 2,300 TON ANTICIPATED SCHEDULE: Advertisement March 2026 Award May 2026 NTP June 2026 Contract Completion September 2026 ESTIMATED COST RANGE: Total estimated cost between $2,000,000 and $5,000,000. This will be solicited using full and open competition procedures.
From Presolicitation posted on Mar 31, 2026Notice history
1Details
Award Information
Not yet awarded
Contacts
Agency
Place of Performance
USA