Scott AFB Stage 1 VBS -2026 01-Q226
Summary
AI-generated · Apr 08, 2026Provide Stage 1 Vapor Balance System (VBS) testing for six existing underground storage tanks at Scott AFB, performed in accordance with the Illinois EPA Federally Enforceable State Operating Permit and 40 CFR 63 11120.a. USTs 1–4 are 12,000-gallon, double-walled, fiberglass tanks; USTs 5–6 are 10,000-gallon, double-walled steel tanks with fiberglass secondary containment.
Respondents should present capability to perform the work, a cost estimate, and documentation of certifications or expert qualifications and/or past performance related to VBS testing or UST testing. Direct questions to the specified point of contact, and submit responses by the stated deadline.
375 CES/CEIE is seeking sources to provide the below service. Please indicate capability, cost estimate, certification or expert knowledge qualifications and/or past performances. Direct questions to laura.schroeder.1@us.af.mil and respond by 15 April 2026 1530 CDT. Perform Stage 1 Vapor Balance System (VBS) testing for six (6) existing Underground Storage Tanks located within the boundaries of Scott Air Force Base, in accordance with IL EPA Federally Enforceable State Operating Permit and 40 CFR 63 11120.a. UST 1-4: 12,000 gallon, double-walled, fiberglass UST 5/6: 10,000 gallon, double-walled, steel tank and fiberglass secondary containment
From Sources Sought posted on Apr 07, 2026Notice history
1Details
Award Information
Not yet awarded
Contacts
Phone
Phone
Agency
Place of Performance
USA