San Juan Williams Creek Road and Spur Reconstruction 1240LT25R0024

Solicitation 1240LT25R0024 Copied Notice ID b50adefaf58a4bd88523b0c8deb24726 Copied AGRICULTURE, DEPARTMENT OF — USDA-FS, CSA INTERMOUNTAIN 8
SAM.gov
Posted
Jul 25, 2025
Deadline
Jul 31, 2025
Set-aside
SBA
NAICS
237310
PSC
Z2LB

Summary

AI-generated · Aug 24, 2025

Reconstruct 2.2 miles of road within the Williams Creek Campground by reshaping the roadbed, reestablishing ditches, and pulling the road width back to standard by cutting the shoulders and adding suitable material to the existing surface. The new surface must have a crown of no less than 4%. Additional tasks include cleaning lead-out ditches, removing washboard, filling potholes, and covering large rocks. After the roadbed is prepared, haul and place CDOT class 6 1-minus road base material with a pi between 2-9, and compact using layer placement method 204.11(a)(1) to a 4 depth and a width of 12' to 18'. Site visit details are provided in the solicitation.

Amendment 0001 extends the bid due date and updates bid bond requirements (referenced in attachment 1240LT25R0024_A0001). The core scope remains the same, and bidders should review the amendment for the revised bid bond requirements and any deadline changes, in addition to the existing site-visit details.

Please refer to Solicitation for Site Visit Details The intent of this project is to provide aggregate and reconstruct 2.2 miles of road within the Williams Creek Campground. Work includes reshaping the roadbed by reestablishing ditches and pulling the road width back to a standard width by cutting the shoulders and adding acceptable material to the existing surface. The new surface will be constructed with a crown of no less than 4%. Additional work will include cleaning lead-out ditches, cutting the washboard, filling potholes and covering large rocks. Once the approved roadbed is prepared, commercially purchased aggregate consisting of CDOT class 6 1 -minus road base material with a pi between 2-9 shall be hauled, placed and compacted using layer placement method 204.11(a)(1) to a 4 depth and a 12' to 18' width. See Attached Solicitation, SOW and Specifications for full details.

From Solicitation posted on Jun 25, 2025

Amendment 0001 - Extend due date and update Bid Bond Requirements. See attachment - 1240LT25R0024_A0001 Please refer to Solicitation for Site Visit Details The intent of this project is to provide aggregate and reconstruct 2.2 miles of road within the Williams Creek Campground. Work includes reshaping the roadbed by reestablishing ditches and pulling the road width back to a standard width by cutting the shoulders and adding acceptable material to the existing surface. The new surface will be constructed with a crown of no less than 4%. Additional work will include cleaning lead-out ditches, cutting the washboard, filling potholes and covering large rocks. Once the approved roadbed is prepared, commercially purchased aggregate consisting of CDOT class 6 1 -minus road base material with a pi between 2-9 shall be hauled, placed and compacted using layer placement method 204.11(a)(1) to a 4 depth and a 12' to 18' width. See Attached Solicitation, SOW and Specifications for full details.

From Solicitation posted on Jul 25, 2025

Notice history

2
  1. Solicitation Posted Jun 25, 2025 View
  2. Solicitation LATEST Posted Jul 25, 2025
    • Description: Description was updated
    • Response Deadline: Jul 25, 2025Jul 31, 2025

Details

Solicitation number 1240LT25R0024
Notice ID b50adefaf58a4bd88523b0c8deb24726
Notice type Solicitation
Product / Service (PSC) Z2LB
NAICS 237310
Place of performance Pagosa Springs, Colorado
Archive date Aug 31, 2025

Award Information

Not yet awarded

Contacts

primary
Lucas Dahlman

Email

Agency

AGRICULTURE, DEPARTMENT OF
FOREST SERVICE
USDA-FS, CSA INTERMOUNTAIN 8

Place of Performance

Pagosa Springs, Colorado 81147
USA

Dates

Posted Jul 25, 2025 1 year ago
Last Updated Aug 06, 2026 1 day ago
Due Jul 31, 2025 1 year ago