Contacts, documents and full notice history are available with a subscription.
Solicitation SBA Expired 6 notices 9 documents

Sam Houston Trail Bridge Replacement 127EAV26R0009

Solicitation 127EAV26R0009 Copied Notice ID 2408996782a6472e82945cb318d38c0a Copied AGRICULTURE, DEPARTMENT OF — Southwestern Regional Office, Region 3
SAM.gov
Posted
May 09, 2026
Deadline
May 29, 2026
Set-aside
SBA
NAICS
237310
PSC
Y1LB

Summary

AI-generated · Feb 10, 2026

Design-build construction to harden the Lake Loop Section of the Multi-Use Trail in Sam Houston National Forest, including drainage improvements and related structures. The contractor will provide all labor, materials, equipment, supervision, and construction required to complete the project per the Statement of Work; architect-engineer services, if needed, are incidental and not procured under the Brooks Act. A single firm-fixed-price contract will be awarded.

Procurement uses a 100% small-business set-aside with competitive negotiations under FAR Part 15 for a design-build project under FAR Part 36. No specifications or drawings are available yet. The RFP will be posted to SAM.gov under the appropriate solicitation number; the opportunity involves design-build work and the successful bidder must perform all aspects of the project per the SOW.

THIS NOTICE DOES NOT CONSTITUE A REQUEST FOR PROPOSAL, REQUEST FOR QUOTE, OR AN INVITATION FOR BID. NO SPECIFICATIONS OR DRAWINGS ARE AVAILABLE AT THIS TIME. The United States Department of Agriculture (USDA), Forest Service, Region 3, Procurement and Property Services (PPS), intends to issue a Request for Proposals (RFP) for a firm?fixed?price Design?Build construction contract for trail hardening and associated drainage and structure improvements on the Lake Loop Section of the Multi?Use Trail (MUT), Sam Houston National Forest, Texas, Region 8. The anticipated requirement will be issued under RFP Number 127EAV26R0009. The RFP is expected to be posted to Contract Opportunities at https://www.sam.gov/, in February 2026 (third or fourth week). This acquisition is a Design?Build construction procurement conducted in accordance with FAR Part 36 using competitive negotiation procedures under FAR Part 15. The Government intends to award a single firm?fixed?price Design?Build contract. The successful Offeror shall provide all labor, materials, equipment, supplies, supervision, and construction necessary to complete the project in accordance with the Statement of Work. Architect?Engineer services, if required, are incidental to construction and are not being procured under the Brooks Act (40 U.S.C. Chapter 11). This procurement is set aside 100 percent for Small Business concerns. The applicable NAICS code is 237990 Other Heavy and Civil Engineering Construction.

From Presolicitation posted on Feb 09, 2026

1.1 This Project includes all labor, materials, equipment, supplies, travel, supervision, and incidentals necessary for the full design and construction of (18) Trail Bridges on the MUT (Multi-Use Trail) of the Sam Houston National Forest west of New Waverly, TX. Work includes: 1.1.1 Phase A: Site Investigation and Analysis 1.1.2 Phase B: Design and Construction Document Preparation 1.1.3 Phase C: Removal and disposal of existing crossing infrastructure, construction of new crossings, and construction and connecting of trail approaches from the existing trail to the new crossings. 1.2 The contractor may adopt a phased approach to completion of the crossings due to the number of sites as well as the varied locations and potential varied crossing types proposed. 1. Disclosure of the Magnitude of Construction (FAR 36.204) In accordance with FAR 36.204, Disclosure of the Magnitude of Construction Projects, the magnitude of this construction project is estimated to be between $500,000 and $1,000,000. This magnitude range is provided solely for the purpose of assisting prospective offerors in determining their capability to perform the work. The magnitude range does not represent the Governments independent estimate. 2. Site Visit Offerors are strongly encouraged to visit the project site to familiarize themselves with local conditions that may affect the performance of the work. Contractors shall be responsible for investigating and satisfying themselves as to the conditions affecting the work, including but not limited to access, terrain, weather conditions, and other conditions which may impact the cost or performance of the work. Failure to visit the site will not relieve the contractor from responsibility for properly estimating the difficulty and cost of successfully performing the work. 3. Period of Performance The contractor shall complete all work required under this contract within [INSERT NUMBER] calendar days after receipt of the Notice to Proceed (NTP), unless otherwise specified in the contract. The contractor shall provide a proposed schedule within 10 calendar days after receipt of the Notice to Proceed outlining the anticipated sequence and duration of work activities. 4. Bonding Requirements In accordance with FAR 52.228-15, Performance and Payment BondsConstruction, the successful offeror shall furnish performance and payment bonds in the amount of 100 percent of the contract price. The required bonds shall be submitted to the Contracting Officer within 10 calendar days after receipt of the notice of award. 5. Differing Site Conditions Offerors are reminded that FAR 52.236-2, Differing Site Conditions, is incorporated into this solicitation and resulting contract. Contractors shall promptly notify the Contracting Officer in writing upon encountering subsurface or latent physical conditions at the site that differ materially from those indicated in the contract or from those ordinarily encountered and generally recognized as inherent in work of the character provided for in the contract. QUESTIONS ARE DUE THURSDAY, APRIL 2, 2026.

From Solicitation posted on Mar 16, 2026

1.1 This Project includes all labor, materials, equipment, supplies, travel, supervision, and incidentals necessary for the full design and construction of (18) Trail Bridges on the MUT (Multi-Use Trail) of the Sam Houston National Forest west of New Waverly, TX. Work includes: 1.1.1 Phase A: Site Investigation and Analysis 1.1.2 Phase B: Design and Construction Document Preparation 1.1.3 Phase C: Removal and disposal of existing crossing infrastructure, construction of new crossings, and construction and connecting of trail approaches from the existing trail to the new crossings. 1.2 The contractor may adopt a phased approach to completion of the crossings due to the number of sites as well as the varied locations and potential varied crossing types proposed. 1. Disclosure of the Magnitude of Construction (FAR 36.204) In accordance with FAR 36.204, Disclosure of the Magnitude of Construction Projects, the magnitude of this construction project is estimated to be between $1,000,000 and $5,000,000. This magnitude range is provided solely for the purpose of assisting prospective offerors in determining their capability to perform the work. The magnitude range does not represent the Governments independent estimate. 2. Site Visit Offerors are strongly encouraged to visit the project site to familiarize themselves with local conditions that may affect the performance of the work. Contractors shall be responsible for investigating and satisfying themselves as to the conditions affecting the work, including but not limited to access, terrain, weather conditions, and other conditions which may impact the cost or performance of the work. Failure to visit the site will not relieve the contractor from responsibility for properly estimating the difficulty and cost of successfully performing the work. 3. Period of Performance The contractor shall complete all work required under this contract within 390 calendar days after receipt of the Notice to Proceed (NTP), unless otherwise specified in the contract. The contractor shall provide a proposed schedule within 10 calendar days after receipt of the Notice to Proceed outlining the anticipated sequence and duration of work activities. 4. Bonding Requirements In accordance with FAR 52.228-15, Performance and Payment Bonds Construction, the successful offeror shall furnish performance and payment bonds in the amount of 100 percent of the contract price. The required bonds shall be submitted to the Contracting Officer within 10 calendar days after receipt of the notice of award. 5. Differing Site Conditions Offerors are reminded that FAR 52.236-2, Differing Site Conditions, is incorporated into this solicitation and resulting contract. Contractors shall promptly notify the Contracting Officer in writing upon encountering subsurface or latent physical conditions at the site that differ materially from those indicated in the contract or from those ordinarily encountered and generally recognized as inherent in work of the character provided for in the contract. QUESTIONS ARE DUE THURSDAY, APRIL 2, 2026.

From Solicitation posted on Mar 17, 2026

1.1 This Project includes all labor, materials, equipment, supplies, travel, supervision, and incidentals necessary for the full design and construction of (18) Trail Bridges on the MUT (Multi-Use Trail) of the Sam Houston National Forest west of New Waverly, TX. Work includes: 1.1.1 Phase A: Site Investigation and Analysis 1.1.2 Phase B: Design and Construction Document Preparation 1.1.3 Phase C: Removal and disposal of existing crossing infrastructure, construction of new crossings, and construction and connecting of trail approaches from the existing trail to the new crossings. 1.2 The contractor may adopt a phased approach to completion of the crossings due to the number of sites as well as the varied locations and potential varied crossing types proposed. 1. Disclosure of the Magnitude of Construction (FAR 36.204) In accordance with FAR 36.204, Disclosure of the Magnitude of Construction Projects, the magnitude of this construction project is estimated to be between $1,000,000 and $5,000,000. This magnitude range is provided solely for the purpose of assisting prospective offerors in determining their capability to perform the work. The magnitude range does not represent the Governments independent estimate. 2. Site Visit Offerors are strongly encouraged to visit the project site to familiarize themselves with local conditions that may affect the performance of the work. Contractors shall be responsible for investigating and satisfying themselves as to the conditions affecting the work, including but not limited to access, terrain, weather conditions, and other conditions which may impact the cost or performance of the work. Failure to visit the site will not relieve the contractor from responsibility for properly estimating the difficulty and cost of successfully performing the work. 3. Period of Performance The contractor shall complete all work required under this contract within 390 calendar days after receipt of the Notice to Proceed (NTP), unless otherwise specified in the contract. The contractor shall provide a proposed schedule within 10 calendar days after receipt of the Notice to Proceed outlining the anticipated sequence and duration of work activities. 4. Bonding Requirements In accordance with FAR 52.228-15, Performance and Payment Bonds Construction, the successful offeror shall furnish performance and payment bonds in the amount of 100 percent of the contract price. The required bonds shall be submitted to the Contracting Officer within 10 calendar days after receipt of the notice of award. 5. Differing Site Conditions Offerors are reminded that FAR 52.236-2, Differing Site Conditions, is incorporated into this solicitation and resulting contract. Contractors shall promptly notify the Contracting Officer in writing upon encountering subsurface or latent physical conditions at the site that differ materially from those indicated in the contract or from those ordinarily encountered and generally recognized as inherent in work of the character provided for in the contract. QUESTIONS ARE DUE THURSDAY, APRIL 2, 2026.

From Solicitation posted on Mar 26, 2026

April 10, 2026 The purpose of this amendment is to: 1.Update and provide responses to questions. 2. Extend solicitation from April 17, 2026, to May 29, 2026, 1400 CST. 1.1 This Project includes all labor, materials, equipment, supplies, travel, supervision, and incidentals necessary for the full design and construction of (18) Trail Bridges on the MUT (Multi-Use Trail) of the Sam Houston National Forest west of New Waverly, TX. Work includes: 1.1.1 Phase A: Site Investigation and Analysis 1.1.2 Phase B: Design and Construction Document Preparation 1.1.3 Phase C: Removal and disposal of existing crossing infrastructure, construction of new crossings, and construction and connecting of trail approaches from the existing trail to the new crossings. 1.2 The contractor may adopt a phased approach to completion of the crossings due to the number of sites as well as the varied locations and potential varied crossing types proposed. 1. Disclosure of the Magnitude of Construction (FAR 36.204) In accordance with FAR 36.204, Disclosure of the Magnitude of Construction Projects, the magnitude of this construction project is estimated to be between $1,000,000 and $5,000,000. This magnitude range is provided solely for the purpose of assisting prospective offerors in determining their capability to perform the work. The magnitude range does not represent the Governments independent estimate. 2. Site Visit Offerors are strongly encouraged to visit the project site to familiarize themselves with local conditions that may affect the performance of the work. Contractors shall be responsible for investigating and satisfying themselves as to the conditions affecting the work, including but not limited to access, terrain, weather conditions, and other conditions which may impact the cost or performance of the work. Failure to visit the site will not relieve the contractor from responsibility for properly estimating the difficulty and cost of successfully performing the work. 3. Period of Performance The contractor shall complete all work required under this contract within 390 calendar days after receipt of the Notice to Proceed (NTP), unless otherwise specified in the contract. The contractor shall provide a proposed schedule within 10 calendar days after receipt of the Notice to Proceed outlining the anticipated sequence and duration of work activities. 4. Bonding Requirements In accordance with FAR 52.228-15, Performance and Payment Bonds Construction, the successful offeror shall furnish performance and payment bonds in the amount of 100 percent of the contract price. The required bonds shall be submitted to the Contracting Officer within 10 calendar days after receipt of the notice of award. 5. Differing Site Conditions Offerors are reminded that FAR 52.236-2, Differing Site Conditions, is incorporated into this solicitation and resulting contract. Contractors shall promptly notify the Contracting Officer in writing upon encountering subsurface or latent physical conditions at the site that differ materially from those indicated in the contract or from those ordinarily encountered and generally recognized as inherent in work of the character provided for in the contract. QUESTIONS ARE DUE THURSDAY, APRIL 2, 2026.

From Solicitation posted on Apr 10, 2026

April 10, 2026 The purpose of this amendment is to: 1.Update and provide responses to questions. 2. Extend solicitation from April 17, 2026, to May 29, 2026, 1400 CST. 1.1 This Project includes all labor, materials, equipment, supplies, travel, supervision, and incidentals necessary for the full design and construction of (18) Trail Bridges on the MUT (Multi-Use Trail) of the Sam Houston National Forest west of New Waverly, TX. Work includes: 1.1.1 Phase A: Site Investigation and Analysis 1.1.2 Phase B: Design and Construction Document Preparation 1.1.3 Phase C: Removal and disposal of existing crossing infrastructure, construction of new crossings, and construction and connecting of trail approaches from the existing trail to the new crossings. 1.2 The contractor may adopt a phased approach to completion of the crossings due to the number of sites as well as the varied locations and potential varied crossing types proposed. 1. Disclosure of the Magnitude of Construction (FAR 36.204) In accordance with FAR 36.204, Disclosure of the Magnitude of Construction Projects, the magnitude of this construction project is estimated to be between $1,000,000 and $5,000,000. This magnitude range is provided solely for the purpose of assisting prospective offerors in determining their capability to perform the work. The magnitude range does not represent the Governments independent estimate. 2. Site Visit Offerors are strongly encouraged to visit the project site to familiarize themselves with local conditions that may affect the performance of the work. Contractors shall be responsible for investigating and satisfying themselves as to the conditions affecting the work, including but not limited to access, terrain, weather conditions, and other conditions which may impact the cost or performance of the work. Failure to visit the site will not relieve the contractor from responsibility for properly estimating the difficulty and cost of successfully performing the work. 3. Period of Performance The contractor shall complete all work required under this contract within 390 calendar days after receipt of the Notice to Proceed (NTP), unless otherwise specified in the contract. The contractor shall provide a proposed schedule within 10 calendar days after receipt of the Notice to Proceed outlining the anticipated sequence and duration of work activities. 4. Bonding Requirements In accordance with FAR 52.228-15, Performance and Payment Bonds Construction, the successful offeror shall furnish performance and payment bonds in the amount of 100 percent of the contract price. The required bonds shall be submitted to the Contracting Officer within 10 calendar days after receipt of the notice of award. 5. Differing Site Conditions Offerors are reminded that FAR 52.236-2, Differing Site Conditions, is incorporated into this solicitation and resulting contract. Contractors shall promptly notify the Contracting Officer in writing upon encountering subsurface or latent physical conditions at the site that differ materially from those indicated in the contract or from those ordinarily encountered and generally recognized as inherent in work of the character provided for in the contract. QUESTIONS ARE DUE THURSDAY, APRIL 2, 2026.

From Solicitation posted on May 09, 2026

Notice history

6
  1. Presolicitation Posted Feb 09, 2026 View
  2. Solicitation Posted Mar 16, 2026
    • Title: Sam Houston Trail Hardening MUT, Lake Loop SectionSam Houston Trail Bridge Replacement
    • Description: Description was updated
    • Notice Type: PresolicitationSolicitation
    • Response Deadline: Feb 23, 2026Apr 17, 2026
    • NAICS Codes: 237990237310
  3. Solicitation Posted Mar 17, 2026
    • Description: Description was updated
  4. Solicitation Posted Mar 26, 2026
    No changes from previous notice
  5. Solicitation Posted Apr 10, 2026
    • Description: Description was updated
    • Response Deadline: Apr 17, 2026May 29, 2026
  6. Solicitation LATEST Posted May 09, 2026
    No changes from previous notice

Details

Solicitation number 127EAV26R0009
Notice ID 2408996782a6472e82945cb318d38c0a
Notice type Solicitation
Product / Service (PSC) Y1LB
NAICS 237310
Place of performance Lufkin, Texas
Archive date Jun 13, 2026

Award Information

Not yet awarded

Contacts

primary
DAVID WATSON

Email

Phone

Agency

AGRICULTURE, DEPARTMENT OF
FOREST SERVICE
Southwestern Regional Office, Region 3

Place of Performance

Lufkin, Texas 75904
USA

Dates

Posted May 09, 2026 2 months ago
Last Updated Aug 06, 2026 2 days ago
Due May 29, 2026 2 months ago