Contacts, documents and full notice history are available with a subscription.
Solicitation SBA Expired 2 notices 3 documents

Trail Hardening MUT, Lake Loop Section 127EAV26R0010

Solicitation 127EAV26R0010 Copied Notice ID 89552b2ef2a2401f94623ee7a496cf56 Copied AGRICULTURE, DEPARTMENT OF — Southwestern Regional Office, Region 3
SAM.gov
Posted
Mar 16, 2026
Deadline
Apr 17, 2026
Set-aside
SBA
NAICS
237990
PSC
Z1PA

Summary

AI-generated · Feb 10, 2026

The project requires the full design and construction of 18 trail bridge crossings on the Sam Houston National Forest Multi-Use Trail west of New Waverly, TX. It includes Phase A: site investigation and analysis; Phase B: design and construction document preparation; and Phase C: removal of existing crossing infrastructure, construction of new crossings, and creation of trail approaches from the existing trail to the new crossings. The contractor must furnish all labor, materials, equipment, supplies, travel, supervision, and incidentals.

A phased approach to completing the crossings may be used due to the number of sites, their varied locations, and potential differences in crossing types.

This Project includes all labor, materials, equipment, supplies, travel, supervision, and incidentals necessary for the full design and construction of (18) Trail Bridges on the MUT (Multi-Use Trail) of the Sam Houston National Forest west of New Waverly, TX. Work includes: Phase A: Site Investigation and Analysis Phase B: Design and Construction Document Preparation Phase C: Removal and disposal of existing crossing infrastructure, construction of new crossings, and construction and connecting of trail approaches from the existing trail to the new crossings. The contractor may adopt a phased approach to completion of the crossings due to the number of sites as well as the varied locations and potential varied crossing types proposed.

From Presolicitation posted on Feb 09, 2026

1. The contractor shall supply all material, labor, tools, equipment, supplies, incidentals and supervision to complete the project. 2. The contractor shall be responsible to verify the necessary quantities of materials to be supplied. It is suggested that the contractor visit the project site prior to turning in a proposal. 3. There are no utilities available at the project site. 4. All work shall be done in accordance with this document, the project plans, and the FP- 14. 5. All trash, debris, rags, water bottles and any other assorted refuse that is not material to be incorporated into the work shall be removed daily. 1. Disclosure of the Magnitude of Construction (FAR 36.204) In accordance with FAR 36.204, Disclosure of the Magnitude of Construction Projects, the magnitude of this construction project is estimated to be between $500,000 and $1,000,000. This magnitude range is provided solely for the purpose of assisting prospective offerors in determining their capability to perform the work. The magnitude range does not represent the Governments independent estimate. 2. Site Visit Offerors are strongly encouraged to visit the project site to familiarize themselves with local conditions that may affect the performance of the work. Contractors shall be responsible for investigating and satisfying themselves as to the conditions affecting the work, including but not limited to access, terrain, weather conditions, and other conditions which may impact the cost or performance of the work. Failure to visit the site will not relieve the contractor from responsibility for properly estimating the difficulty and cost of successfully performing the work. 3. Period of Performance The contractor shall complete all work required under this contract within 365 calendar days after receipt of the Notice to Proceed (NTP), unless otherwise specified in the contract. The contractor shall provide a proposed schedule within 10 calendar days after receipt of the Notice to Proceed outlining the anticipated sequence and duration of work activities. 4. Bonding Requirements In accordance with FAR 52.228-15, Performance and Payment BondsConstruction, the successful offeror shall furnish performance and payment bonds in the amount of 100 percent of the contract price. The required bonds shall be submitted to the Contracting Officer within 10 calendar days after receipt of the notice of award. 5. Differing Site Conditions Offerors are reminded that FAR 52.236-2, Differing Site Conditions, is incorporated into this solicitation and resulting contract. Contractors shall promptly notify the Contracting Officer in writing upon encountering subsurface or latent physical conditions at the site that differ materially from those indicated in the contract or from those ordinarily encountered and generally recognized as inherent in work of the character provided for in the contract. QUESTIONS REGARDING THIS SOLICITATION ARE DUE THURSDAY APRIL 2, 2026.

From Solicitation posted on Mar 16, 2026

Notice history

2
  1. Presolicitation Posted Feb 09, 2026 View
  2. Solicitation LATEST Posted Mar 16, 2026
    • Title: Sam Houston Trail Bridge ReplacementTrail Hardening MUT, Lake Loop Section
    • Description: Description was updated
    • Notice Type: PresolicitationSolicitation
    • Response Deadline: Feb 23, 2026Apr 17, 2026

Details

Solicitation number 127EAV26R0010
Notice ID 89552b2ef2a2401f94623ee7a496cf56
Notice type Solicitation
Product / Service (PSC) Z1PA
NAICS 237990
Place of performance Lufkin, Texas
Archive date May 02, 2026

Award Information

Not yet awarded

Contacts

primary
DAVID WATSON

Email

Phone

Agency

AGRICULTURE, DEPARTMENT OF
FOREST SERVICE
Southwestern Regional Office, Region 3

Place of Performance

Lufkin, Texas 75904
USA

Dates

Posted Mar 16, 2026 4 months ago
Last Updated Aug 06, 2026 1 day ago
Due Apr 17, 2026 3 months ago