Contacts, documents and full notice history are available with a subscription.
Solicitation Expired 1 notice 4 documents

S208--Lawn Maintenance Weed and Feed 36C25226Q0214

Solicitation 36C25226Q0214 Copied Notice ID 199a458f8b834d5080770b5e62b832ba Copied VETERANS AFFAIRS, DEPARTMENT OF — 252-NETWORK CONTRACT OFFICE 12 (36C252)
SAM.gov
Posted
Apr 23, 2026
Deadline
Apr 30, 2026
Set-aside
None
NAICS
561730
PSC
S208

Summary

AI-generated · Apr 24, 2026

Lawn maintenance weed-and-feed services are required for designated outdoor areas at the VA campus, with no specific chemicals mandated beyond standard regulatory compliance. All products used must be safe for their intended purpose and fully compliant with applicable federal, state, and local regulations.

Contractor personnel must wear VA PIV badges at all times on site. No storage or building space is provided for lawn care equipment. Water and electricity are available via a standard garden hose bib and 120V outlets in the Boiler Plant Garage, and restrooms are available in the Boiler Plant. The work includes chemically treating two areas: the retention pond gravel (about 2,200 sq ft) and the gravel landscaping beds west of Building 5 (about 800 sq ft) to control vegetation.

1. Are there any specific chemicals or products required or prohibited on the VA campus? There are no specific chemicals or products that are explicitly required or prohibited by the VA beyond standard regulations. However, please note that all products used must be safe, suitable for their intended application, and fully compliant with all relevant federal, state, and local regulations. 2. Will contractors and crew members be required to pass a background check or obtain a VA access badge? YES PER SOW: 2. The Contractor s employees shall wear their VA PIV Card at all times while on the premises of the VAMC. 3. Can contractor store equipment on site? PER SOW 7. Storage space is NOT provided at OGJVAMC for lawn care equipment and supplies. 4. Is there a building space for contractor to use? NO 5. Is water and electricity available? There is a standard garden hose bib and 120V outlets in the Boiler Plant Garage that can be used 6. Rest Rooms available? Contractor can use Boiler Plant Restroom while working onsite 7. Is the retention pond area included in section II.a.i? Yes, retention pond gravel shall be chemically treated for vegetation. (2200 sq. ft.) 8. Is the gravel landscaping beds West of Building 5 included in section II.a.i? Yes, gravel shall be chemically treated for vegetation. (800 sq. ft.)

From Solicitation posted on Apr 23, 2026

Notice history

1
  1. Solicitation LATEST Posted Apr 23, 2026

Details

Solicitation number 36C25226Q0214
Notice ID 199a458f8b834d5080770b5e62b832ba
Notice type Solicitation
Product / Service (PSC) S208
NAICS 561730
Archive date May 30, 2026

Award Information

Awardees
0

Contacts

primary
Debbie Bruening

Contract Specialist

Email

Agency

VETERANS AFFAIRS, DEPARTMENT OF
VETERANS AFFAIRS, DEPARTMENT OF
252-NETWORK CONTRACT OFFICE 12 (36C252)

Place of Performance

Dates

Posted Apr 23, 2026 3 months ago
Last Updated Aug 06, 2026 2 days ago
Due Apr 30, 2026 3 months ago