Roof Replacement B2009 W911SG25BA044
Summary
AI-generated · Aug 24, 2025Repair and replace wood rafter tails, prime and paint (two coats); prime and paint all existing, exposed wood deck soffit, fascia, and rafter tails; install a new fall protection roof anchor; and repoint the existing chimney to restore structural integrity, prevent water intrusion, and improve aesthetics. Building 2009 has a valid survey for asbestos-containing materials and lead-based paint, so contractors should plan for environmental and safety considerations and follow any related requirements described in the solicitation.
All records describe the same scope, location, and requirements with no substantive changes noted between notices. Review the attached solicitation and supporting documents for bidding procedures and submission details.
The Mission and Installation Contracting Command (MICC) - Fort Bliss, TX is issuing a construction solicitation W911SG-25-B-A044, in support of the United States Army Directorate of Public Works (DPW) located at Fort Bliss, Texas. General Information: Repair and replace wood rafter tails, prime and paint (two coats). Prime and paint (two coats) all existing, exposed wood deck sofit, fascia, and rafter tails. Install new fall protection roof anchor. Repointing of the existing chimney to restore structural integrity, prevent water intrusion, and improve the aesthetic appearance DPW-ED has a valid survey for asbestos-containing materials (ACM) and lead-based paint (LBP) for Building 2009. Procurement will be solicited as one hundred percent (100%) HUBZone. The solicitation will result in a Firm-Fixed-Price (FFP) contract. The anticipated period of performance is 90 calendar days after Notice to Proceed has been issued. The North American Industry Classification System (NAICS) code is 238160 (Size Standard $19 Million). The magnitude of the procurement is estimated to be between $100,000 and $250,000. Please see attached solicitation and supporting documents. If you will be hand delivering your bid before the bid opening, you shall coordinate drop off by e-mailing Saul Luna at saul.o.luna@army.civ@army.mil & Joreen Christian at joreenmarie.christian.mil@army.mil. If you will be mailing your bid via UPS, USPS, or FedEx, please e-mail tracking number to Saul Luna at saul.o.luna@army.civ@army.mil & Joreen Christian at joreenmarie.christian.mil@army.mil.
From Solicitation posted on Jul 29, 2025The Mission and Installation Contracting Command (MICC) - Fort Bliss, TX is issuing a construction solicitation W911SG-25-B-A044, in support of the United States Army Directorate of Public Works (DPW) located at Fort Bliss, Texas. General Information: Repair and replace wood rafter tails, prime and paint (two coats). Prime and paint (two coats) all existing, exposed wood deck sofit, fascia, and rafter tails. Install new fall protection roof anchor. Repointing of the existing chimney to restore structural integrity, prevent water intrusion, and improve the aesthetic appearance DPW-ED has a valid survey for asbestos-containing materials (ACM) and lead-based paint (LBP) for Building 2009. Procurement will be solicited as one hundred percent (100%) HUBZone. The solicitation will result in a Firm-Fixed-Price (FFP) contract. The anticipated period of performance is 90 calendar days after Notice to Proceed has been issued. The North American Industry Classification System (NAICS) code is 238160 (Size Standard $19 Million). The magnitude of the procurement is estimated to be between $100,000 and $250,000. Please see attached solicitation and supporting documents. If you will be hand delivering your bid before the bid opening, you shall coordinate drop off by e-mailing Saul Luna at saul.o.luna@army.civ@army.mil & Joreen Christian at joreenmarie.christian.mil@army.mil. If you will be mailing your bid via UPS, USPS, or FedEx, please e-mail tracking number to Saul Luna at saul.o.luna@army.civ@army.mil & Joreen Christian at joreenmarie.christian.mil@army.mil.
From Solicitation posted on Jul 30, 2025The Mission and Installation Contracting Command (MICC) - Fort Bliss, TX is issuing a construction solicitation W911SG-25-B-A044, in support of the United States Army Directorate of Public Works (DPW) located at Fort Bliss, Texas. General Information: Repair and replace wood rafter tails, prime and paint (two coats). Prime and paint (two coats) all existing, exposed wood deck sofit, fascia, and rafter tails. Install new fall protection roof anchor. Repointing of the existing chimney to restore structural integrity, prevent water intrusion, and improve the aesthetic appearance DPW-ED has a valid survey for asbestos-containing materials (ACM) and lead-based paint (LBP) for Building 2009. Procurement will be solicited as one hundred percent (100%) HUBZone. The solicitation will result in a Firm-Fixed-Price (FFP) contract. The anticipated period of performance is 90 calendar days after Notice to Proceed has been issued. The North American Industry Classification System (NAICS) code is 238160 (Size Standard $19 Million). The magnitude of the procurement is estimated to be between $100,000 and $250,000. Please see attached solicitation and supporting documents. If you will be hand delivering your bid before the bid opening, you shall coordinate drop off by e-mailing Saul Luna at saul.o.luna@army.civ@army.mil & Joreen Christian at joreenmarie.christian.mil@army.mil. If you will be mailing your bid via UPS, USPS, or FedEx, please e-mail tracking number to Saul Luna at saul.o.luna@army.civ@army.mil & Joreen Christian at joreenmarie.christian.mil@army.mil.
From Solicitation posted on Aug 04, 2025The Mission and Installation Contracting Command (MICC) - Fort Bliss, TX is issuing a construction solicitation W911SG-25-B-A044, in support of the United States Army Directorate of Public Works (DPW) located at Fort Bliss, Texas. General Information: Repair and replace wood rafter tails, prime and paint (two coats). Prime and paint (two coats) all existing, exposed wood deck sofit, fascia, and rafter tails. Install new fall protection roof anchor. Repointing of the existing chimney to restore structural integrity, prevent water intrusion, and improve the aesthetic appearance DPW-ED has a valid survey for asbestos-containing materials (ACM) and lead-based paint (LBP) for Building 2009. Procurement will be solicited as one hundred percent (100%) HUBZone. The solicitation will result in a Firm-Fixed-Price (FFP) contract. The anticipated period of performance is 90 calendar days after Notice to Proceed has been issued. The North American Industry Classification System (NAICS) code is 238160 (Size Standard $19 Million). The magnitude of the procurement is estimated to be between $100,000 and $250,000. Please see attached solicitation and supporting documents. If you will be hand delivering your bid before the bid opening, you shall coordinate drop off by e-mailing Saul Luna at saul.o.luna@army.civ@army.mil & Joreen Christian at joreenmarie.christian.mil@army.mil. If you will be mailing your bid via UPS, USPS, or FedEx, please e-mail tracking number to Saul Luna at saul.o.luna@army.civ@army.mil & Joreen Christian at joreenmarie.christian.mil@army.mil.
From Solicitation posted on Sep 03, 2025Notice history
4-
Solicitation Posted Jul 29, 2025
-
Solicitation Posted Jul 30, 2025No changes from previous notice
-
Solicitation Posted Aug 04, 2025No changes from previous notice
-
Solicitation LATEST Posted Sep 03, 2025No changes from previous notice
Details
Award Information
Not yet awarded
Contacts
Phone
Agency
Place of Performance
USA