ROAD REPAIR AT KAMOME DOHRI AND KING AVENUE AT THE U.S. NAVAL AIR FACILITY (NAF), ATSUGI, JAPAN N4008425B8011
Summary
AI-generated · Aug 23, 2025Provide all labor, management, supervision, tools, material, and equipment required to repair roads at Kamome Dohri and King Avenue, U.S. Naval Air Facility (NAF) Atsugi, Japan. Work includes preliminary survey, removal of existing road structures, asphalt-concrete (AC) and semi-flex AC paving, removal and painting of road markings, provision of sodding, and adjustment of existing structures including manhole covers and water valve covers, all in accordance with the contract drawings. The contractor must perform multiple tests and analyses of existing and provided structures to meet standard requirements, and undertake related and temporary work necessary to complete the project; no unforeseen site conditions are included. Solicitation attachments are posted to SAM.
Amendment 0001 was issued on 3 July 2025, reiterating the same scope and requirements; no substantive changes are described in the notice excerpt. Attachments remain available on SAM.
The Contractor shall provide all labor, management, supervision, tools, material, and equipment required to road repair at Kamome Dohri and King Avenue. The work includes preliminary survey, removal of existing road structures, asphalt-concrete (AC) and semi-flex AC paving, deletion and painting of road markings, provision of sodding, and adjustment of existing structures including manhole covers and water valve covers, all in accordance with the contract drawings. The Contractor must also perform multiple test and analysis of existing and provided structures to meet the standard requirements as specified in the contract drawings. The work also includes related work which is defined as temporary work and relevant work required to accomplish this project. This work does not include unforeseen site conditions. *Solicitation attachments are posted to SAM.
From Solicitation posted on Jun 04, 2025*Amendment 0001 issued (3 July 2025) The Contractor shall provide all labor, management, supervision, tools, material, and equipment required to road repair at Kamome Dohri and King Avenue. The work includes preliminary survey, removal of existing road structures, asphalt-concrete (AC) and semi-flex AC paving, deletion and painting of road markings, provision of sodding, and adjustment of existing structures including manhole covers and water valve covers, all in accordance with the contract drawings. The Contractor must also perform multiple test and analysis of existing and provided structures to meet the standard requirements as specified in the contract drawings. The work also includes related work which is defined as temporary work and relevant work required to accomplish this project. This work does not include unforeseen site conditions. *Solicitation attachments are posted to SAM.
From Solicitation posted on Jul 03, 2025Notice history
2-
Solicitation Posted Jun 04, 2025
Details
Award Information
Not yet awarded
Contacts
Phone
Phone
Agency
Place of Performance
AYASE, Kanagawa
JPN