RFQ Preventive Air stack chiller maintenance project 19BY7025Q0010
Summary
AI-generated · Aug 24, 2025Provide all materials (see section 8.1), supervision, labor, tools, and equipment required to perform preventive maintenance on the air stack chiller. All personnel in the vicinity must wear and/or use safety protection during the work; any questions or injuries must be reported to the Post Occupation Safety and Health Officer (POSHO). Provide Material Safety Data Sheets for all hazardous materials used.
Contractor shall provide all materials (see 8.1), supervision, labor, tools and equipment to perform preventive maintenance. All personnel working in the vicinity shall wear and /or use safety protection while all work is performed. Any questions or injuries shall be brought to the attention of the Post Occupation Safety and Health Officer (POSHO). Material Safety Data Sheets (MSDS) shall be provided by the Contractor for all HAZMAT materials.
From Solicitation posted on Aug 13, 2025Notice history
1-
Solicitation LATEST Posted Aug 13, 2025
Details
Award Information
Not yet awarded
Contacts
Phone
Phone
Agency
Place of Performance
BDI