RFI 00585-CAB: Electron and Hadron Endcap Structures for the ePIC Detector 00585
Summary
AI-generated · Sep 28, 2025Two Electron and Hadron Endcap Structures for the ePIC detector at the Electron-Ion Collider (EIC) interaction region IP-6 at Brookhaven National Laboratory are being sought as part of an RFI/Sources Sought to gauge industry capabilities. The package includes the Statement of Work, Technical Specification, drawings for Forward and Backward Endcaps and their fixtures, and a QA document. This is an informational planning request, not a solicitation or contract, and no commitment or solicitation exists at this time.
Respondents should share information on their capability to deliver the Electron and Hadron Endcap Structures, including manufacturing, assembly, fixtures, integration with the ePIC detector, and quality assurance processes. Electronic submissions are preferred and should reference the RFI code 00585-CAB in the subject line, routed to theBrookhaven National Laboratory procurement contact handling the request.
Brookhaven Science Associates, LLC (herein known as BSA ), operator of Brookhaven National Laboratory (BNL) under a Prime Contract with the U.S. Department of Energy (DOE), is seeking expressions of interest from firms regarding two (2) Electron and Hadron Endcap Structures for the Electron-Proton/Ion Collider (ePIC) detector to be built in the Electron-Ion Collider (EIC) interaction region IP-6 (Experimental Hall of the ePIC Detector) at Brookhaven National Laboratory (BNL), managed by Brookhaven Science Associates (BSA). The Electron Structures, Endcap Structures, or Encaps as outlined in the following attachments: Attachment A- Statement of Work for the Electron and Hadron Endcap Structures for the ePIC Detector Attachment B- Technical Specification for the Electron and Hadron Endcap Structures for the ePIC Detector Attachment C- Drawing No. EPC-FWD-FLX-SUP-ASM-100 (Forward Endcap) Attachment D- Drawing No. EPC-BWD-FLX-SUP-ASM-100 (Backward Endcap Attachment E- Drawing No. EPC-FWD-FLX-FIX-ASM-350 (Forward Endcap Fixtures) Attachment F- Drawing No. EPC-BWD-FLX-FIX-ASM-350 (Backward Endcap Fixtures) Attachment G- BNL-QA-101 Revision 04/2025 Please note that this is an RFI/Sources Sought notice, not a Request for Proposal, and no solicitation exists at this time. This RFI is for informational and planning purposes only and is not to be construed as a commitment by the U.S. Government, nor will the U.S. Government pay for information received. The information from this notice will help the Department of Energy (DOE) Office of Basic Energy Sciences (BES) survey available resources. We are open to all information you can and care to provide at this point. Please provide responses to BSA no later than October 17, 2025. BSA prefers electronic submissions of submittals. Electronic submissions will be accepted by the following method: Email submissions should express your interest and describe your capabilities related to delivering this product. Emails shall be sent to Cindy Blanchard, cblanchar@bnl.gov with the BSA RFI 00585-CAB in the Subject Line However, should you have any questions, please contact the undersigned. Sincerely, Cindy Blanchard Senior Contracts Specialist Procurement & Property Management Division Brookhaven National Laboratory Upton, New York 11973 Phone: (631) 344-5770 Email: cblanchar@bnl.gov
From Sources Sought posted on Sep 17, 2025Notice history
1-
Sources Sought LATEST Posted Sep 17, 2025
Details
Award Information
Not yet awarded
Contacts
Phone
Agency
Place of Performance
USA