Rewire Power and Data- Small Arms Range W912DW25BA014
Summary
AI-generated · Aug 24, 2025Rewire power and data for existing targets on Ranges 5 and 1 to support the Future Army System Integrated Targets (FASIT). Provide all supervision, labor, equipment, and materials to repair and rewire power and communications cables, modify target emplacements to install a new data panel, load center, and new power outlets (for targets and thermal blankets), and ensure work is performed to the contract specs, SOW, and drawings as a firm-fixed-price construction project. Work will follow US Army Corps of Engineers Range Design Guide and related target emplacement requirements. The Base work covers Range 5 with an option for Range 1; project magnitude is estimated between $1.5M and $4.5M, with plans and attachments included at no charge in the solicitation.
New information across notices includes organized pre-bid site-visit sign-in rosters, updates to the SOW and wage determinations, and revised bid/bid-opening dates via multiple amendments. The Instructions to Bidders and ProjNet Q&A access have been updated or opened, and the solicitation has been extended in subsequent amendments. Bids will be restricted to service-disabled veteran-owned small businesses (SDVOSB), and the solicitation package (plans and attachments) will be posted on SAM.gov for download at no cost.
Presolicitation Notice W912DW25BA014 CE0975 Rewire Power and Data for Ranges 5 & 1 IAW with 36.213-2 (1) Describe the proposed work in sufficient detail to disclose the nature and volume of work (in terms of physical characteristics and estimated price range); The Contractor shall supply all supervision, labor, equipment, and materials to perform all work in strict accordance with the contract specifications, thE Statement of Work, and identified drawings to provide a firm fixed price construction project to repair existing power and data cables to all existing targets on ranges 5 and 1 to accept the new Army FASIT (Future Army System Integrated Targets). This project will include modifications of existing target emplacements to provide a new data panel, load center and new power outlets for the targets and thermal blankets. Installations will be in accordance with the US Army Corps of Engineers Range Design Guide Design Requirements and Down Range Target Emplacements for Stationary Infantry Targets. The Range Design Guide (RDG) is a web-based tool that provides guidance for design and construction of US Army Training Ranges; based on the training requirements of TC 25-8. The magnitude of construction for the anticipated contract is estimated to be between $1,500,000.00 and $4,500,000.00. This estimation includes the Base CLINs for Range 5, and Option CLINs for Range 1, if awarded. (2) State the location of the work; The work will be performed on Lewis Main- Joint Base Lewis McChord, Tacoma WA 98433. (3) Include tentative dates for issuing invitations, opening bids, and completing contract performance; Solicitation W912DW25BA014 is expected to be available on the Government Point of Entry, https://sam.gov , no later than July 28, 2025. Pre-Solicitation Site visit(s) will be annotated on the solicitation. The Period of Performance for the Base CLIN(s) (Range 5) and the Option CLIN(s) (Range 1), is expected to be 365 days from date of Notice to Proceed. Exact Period of Performance will be provided in the solicitation. (4) State where plans will be available for inspection without charge; All plans and attachment will be included with the solicitation. No charge. (5) Specify a date by which requests for the invitation for bids should be submitted; Solicitation closing date, and opening of bids, is expected to occur on Aug 19, 2025. Exact time/ date will be provided in the solicitation. (6) State whether award is restricted to small businesses; This solicitation will be a Small Business Total Set-Aside restricted to Service-Disabled Veteran Owned Small Businesses (SDVOSB). Only bids from SDVOSB businesses will be considered. (7)Specify any amount to be charged for solicitation documents; Solicitation W912DW25BA014 will be available on the Government Point of Entry, https://sam.gov for no charge.
From Presolicitation posted on Jul 07, 2025CONSTRUCTION PROJECT TO REPAIR EXISTING POWER AND COMMUNICATIONS CABLES TO EXISTING TARGETS ON RANGE TO ACCEPT THE NEW ARMY FUTURE ARMY SYSTEM INTEGRATED TARGETS (FASIT). THIS PROJECT WILL INCLUDE MODIFICATIONS OF EXISTING TARGET EMPLACEMENTS TO PROVIDE A NEW DATA PANEL, LOAD CENTER AND NEW POWER OUTLETS FOR THE FUTURE INSTALLATION OF TARGET AND THERMAL BLANKETS.
From Solicitation posted on Jul 23, 20258/1/2025: Organized Site Visit sign in rosters have been added: See attachments "Pre Bid Site Visit 31July25" and "Pre Bid Site Visit 1Aug25". CONSTRUCTION PROJECT TO REPAIR EXISTING POWER AND COMMUNICATIONS CABLES TO EXISTING TARGETS ON RANGE TO ACCEPT THE NEW ARMY FUTURE ARMY SYSTEM INTEGRATED TARGETS (FASIT). THIS PROJECT WILL INCLUDE MODIFICATIONS OF EXISTING TARGET EMPLACEMENTS TO PROVIDE A NEW DATA PANEL, LOAD CENTER AND NEW POWER OUTLETS FOR THE FUTURE INSTALLATION OF TARGET AND THERMAL BLANKETS.
From Solicitation posted on Aug 01, 20258/11/2025 Amendment 0001- THIS AMENDMENT EXTENDS THE SOLICITATION CLOSING DATE AND BID OPENING DATE FROM 19 AUG 2025 TO 26 AUG 2025. NO CHANGES WERE MADE TO DOCUMENT "SECTION 00 21 00 INSTRUCTIONS TO BIDDERS W912DW25BA0014" BUT SEE PARA 10 AND KNOW THAT THE DATE SPECIFIED IN BLOCK 13 OF THE 1442 NOW STATES 26 AUG 2025. See attachment "Solicitation Amendment W912DW25BA0140001 SF 30". 8/1/2025: Organized Site Visit sign in rosters have been added: See attachments "Pre Bid Site Visit 31July25" and "Pre Bid Site Visit 1Aug25". CONSTRUCTION PROJECT TO REPAIR EXISTING POWER AND COMMUNICATIONS CABLES TO EXISTING TARGETS ON RANGE TO ACCEPT THE NEW ARMY FUTURE ARMY SYSTEM INTEGRATED TARGETS (FASIT). THIS PROJECT WILL INCLUDE MODIFICATIONS OF EXISTING TARGET EMPLACEMENTS TO PROVIDE A NEW DATA PANEL, LOAD CENTER AND NEW POWER OUTLETS FOR THE FUTURE INSTALLATION OF TARGET AND THERMAL BLANKETS.
From Solicitation posted on Aug 11, 20258/15/2025 Amendment 0002- THIS AMENDMENT 1) REPLACES ATTACHMENT "SECTION 01 11 00 SOW CEO975 REWIRE POWER AND DATE FOR RANGES 5 AND 1" DATED JULY 21, 2025 WITH "SECTION 01 11 00 SOW CEO975 REWIRE POWER AND DATE FOR RANGES 5 AND 1_14AUG2025" DATED AUG 14 2025 AND 2) REPLACES "SECTION 00 73 00 SUPPLEMENTARY CONDITIONS WAGE DET WA20250111 DATED 07_18_2025" WITH "SECTION 00 73 00 SUPPLEMENTARY CONDITIONS WAGE DET WA20250111 DATED 08_15_2025". See attachments. 8/11/2025 Amendment 0001- THIS AMENDMENT EXTENDS THE SOLICITATION CLOSING DATE AND BID OPENING DATE FROM 19 AUG 2025 TO 26 AUG 2025. NO CHANGES WERE MADE TO DOCUMENT "SECTION 00 21 00 INSTRUCTIONS TO BIDDERS W912DW25BA0014" BUT SEE PARA 10 AND KNOW THAT THE DATE SPECIFIED IN BLOCK 13 OF THE 1442 NOW STATES 26 AUG 2025. See attachment "Solicitation Amendment W912DW25BA0140001 SF 30". 8/1/2025: Organized Site Visit sign in rosters have been added: See attachments "Pre Bid Site Visit 31July25" and "Pre Bid Site Visit 1Aug25". CONSTRUCTION PROJECT TO REPAIR EXISTING POWER AND COMMUNICATIONS CABLES TO EXISTING TARGETS ON RANGE TO ACCEPT THE NEW ARMY FUTURE ARMY SYSTEM INTEGRATED TARGETS (FASIT). THIS PROJECT WILL INCLUDE MODIFICATIONS OF EXISTING TARGET EMPLACEMENTS TO PROVIDE A NEW DATA PANEL, LOAD CENTER AND NEW POWER OUTLETS FOR THE FUTURE INSTALLATION OF TARGET AND THERMAL BLANKETS.
From Solicitation posted on Aug 15, 20258/20/2025 Amendment 0003- THIS AMENDMENT REPLACES "SECTION 00 21 00 INSTRUCTIONS TO BIDDERS" WITH "SECTION 00 21 00 INSTRUCTIONS TO BIDDERS (20AUG2025)". CHANGES MADE TO "SECTION 00 21 00 INSTRUCTIONS TO BIDDERS (20AUG2025)" ARE SHOWN IN TRACK CHANGES. THIS AMENDMENT ALSO OPENS PROJNET FOR VENDOR QUESTIONS UNTIL 8 AM, FRIDAY 22 AUGUST 2025 (LOCAL TIME). 8/15/2025 Amendment 0002- THIS AMENDMENT 1) REPLACES ATTACHMENT "SECTION 01 11 00 SOW CEO975 REWIRE POWER AND DATE FOR RANGES 5 AND 1" DATED JULY 21, 2025 WITH "SECTION 01 11 00 SOW CEO975 REWIRE POWER AND DATE FOR RANGES 5 AND 1_14AUG2025" DATED AUG 14 2025 AND 2) REPLACES "SECTION 00 73 00 SUPPLEMENTARY CONDITIONS WAGE DET WA20250111 DATED 07_18_2025" WITH "SECTION 00 73 00 SUPPLEMENTARY CONDITIONS WAGE DET WA20250111 DATED 08_15_2025". See attachments. 8/11/2025 Amendment 0001- THIS AMENDMENT EXTENDS THE SOLICITATION CLOSING DATE AND BID OPENING DATE FROM 19 AUG 2025 TO 26 AUG 2025. NO CHANGES WERE MADE TO DOCUMENT "SECTION 00 21 00 INSTRUCTIONS TO BIDDERS W912DW25BA0014" BUT SEE PARA 10 AND KNOW THAT THE DATE SPECIFIED IN BLOCK 13 OF THE 1442 NOW STATES 26 AUG 2025. See attachment "Solicitation Amendment W912DW25BA0140001 SF 30". 8/1/2025: Organized Site Visit sign in rosters have been added: See attachments "Pre Bid Site Visit 31July25" and "Pre Bid Site Visit 1Aug25". CONSTRUCTION PROJECT TO REPAIR EXISTING POWER AND COMMUNICATIONS CABLES TO EXISTING TARGETS ON RANGE TO ACCEPT THE NEW ARMY FUTURE ARMY SYSTEM INTEGRATED TARGETS (FASIT). THIS PROJECT WILL INCLUDE MODIFICATIONS OF EXISTING TARGET EMPLACEMENTS TO PROVIDE A NEW DATA PANEL, LOAD CENTER AND NEW POWER OUTLETS FOR THE FUTURE INSTALLATION OF TARGET AND THERMAL BLANKETS.
From Solicitation posted on Aug 20, 20258/22/2025 Amendment 0004- THIS AMENDMENT 1) REPLACES SECTION 01 11 00 SOW CEO975 REWIRE POWER AND DATE FOR RANGES 5 AND 1_14AUG2025 WITH SECTION 01 11 00 SOW CEO975 REWIRE POWER AND DATE FOR RANGES 5 AND 1_21AUG2025 AND 2) EXTENDS THE SOLICITATION CLOSING DATE AND BID OPENING DATE FROM 26 AUG 2025 TO 2 SEPT 2025. NO CHANGES WERE MADE TO DOCUMENT "SECTION 00 21 00 INSTRUCTIONS TO BIDDERS W912DW25BA0014" BUT SEE PARA 10 AND KNOW THAT THE DATE SPECIFIED IN BLOCK 13 OF THE 1442 NOW STATES 2 SEPT 2025. SEE SOLICITATION AMENDMENT - W912DW25BA0140004. 8/20/2025 Amendment 0003- THIS AMENDMENT REPLACES "SECTION 00 21 00 INSTRUCTIONS TO BIDDERS" WITH "SECTION 00 21 00 INSTRUCTIONS TO BIDDERS (20AUG2025)". CHANGES MADE TO "SECTION 00 21 00 INSTRUCTIONS TO BIDDERS (20AUG2025)" ARE SHOWN IN TRACK CHANGES. THIS AMENDMENT ALSO OPENS PROJNET FOR VENDOR QUESTIONS UNTIL 8 AM, FRIDAY 22 AUGUST 2025 (LOCAL TIME). 8/15/2025 Amendment 0002- THIS AMENDMENT 1) REPLACES ATTACHMENT "SECTION 01 11 00 SOW CEO975 REWIRE POWER AND DATE FOR RANGES 5 AND 1" DATED JULY 21, 2025 WITH "SECTION 01 11 00 SOW CEO975 REWIRE POWER AND DATE FOR RANGES 5 AND 1_14AUG2025" DATED AUG 14 2025 AND 2) REPLACES "SECTION 00 73 00 SUPPLEMENTARY CONDITIONS WAGE DET WA20250111 DATED 07_18_2025" WITH "SECTION 00 73 00 SUPPLEMENTARY CONDITIONS WAGE DET WA20250111 DATED 08_15_2025". See attachments. 8/11/2025 Amendment 0001- THIS AMENDMENT EXTENDS THE SOLICITATION CLOSING DATE AND BID OPENING DATE FROM 19 AUG 2025 TO 26 AUG 2025. NO CHANGES WERE MADE TO DOCUMENT "SECTION 00 21 00 INSTRUCTIONS TO BIDDERS W912DW25BA0014" BUT SEE PARA 10 AND KNOW THAT THE DATE SPECIFIED IN BLOCK 13 OF THE 1442 NOW STATES 26 AUG 2025. See attachment "Solicitation Amendment W912DW25BA0140001 SF 30". 8/1/2025: Organized Site Visit sign in rosters have been added: See attachments "Pre Bid Site Visit 31July25" and "Pre Bid Site Visit 1Aug25". CONSTRUCTION PROJECT TO REPAIR EXISTING POWER AND COMMUNICATIONS CABLES TO EXISTING TARGETS ON RANGE TO ACCEPT THE NEW ARMY FUTURE ARMY SYSTEM INTEGRATED TARGETS (FASIT). THIS PROJECT WILL INCLUDE MODIFICATIONS OF EXISTING TARGET EMPLACEMENTS TO PROVIDE A NEW DATA PANEL, LOAD CENTER AND NEW POWER OUTLETS FOR THE FUTURE INSTALLATION OF TARGET AND THERMAL BLANKETS.
From Solicitation posted on Aug 22, 20259/3/2025 A spreadsheet showing results of participating vendor bids has been provided. See document "(SAM) BIDS W912DW25BA014 Rewire Power and Data Ranges" 8/22/2025 Amendment 0004- THIS AMENDMENT 1) REPLACES SECTION 01 11 00 SOW CEO975 REWIRE POWER AND DATE FOR RANGES 5 AND 1_14AUG2025 WITH SECTION 01 11 00 SOW CEO975 REWIRE POWER AND DATE FOR RANGES 5 AND 1_21AUG2025 AND 2) EXTENDS THE SOLICITATION CLOSING DATE AND BID OPENING DATE FROM 26 AUG 2025 TO 2 SEPT 2025. NO CHANGES WERE MADE TO DOCUMENT "SECTION 00 21 00 INSTRUCTIONS TO BIDDERS W912DW25BA0014" BUT SEE PARA 10 AND KNOW THAT THE DATE SPECIFIED IN BLOCK 13 OF THE 1442 NOW STATES 2 SEPT 2025. SEE SOLICITATION AMENDMENT - W912DW25BA0140004. 8/20/2025 Amendment 0003- THIS AMENDMENT REPLACES "SECTION 00 21 00 INSTRUCTIONS TO BIDDERS" WITH "SECTION 00 21 00 INSTRUCTIONS TO BIDDERS (20AUG2025)". CHANGES MADE TO "SECTION 00 21 00 INSTRUCTIONS TO BIDDERS (20AUG2025)" ARE SHOWN IN TRACK CHANGES. THIS AMENDMENT ALSO OPENS PROJNET FOR VENDOR QUESTIONS UNTIL 8 AM, FRIDAY 22 AUGUST 2025 (LOCAL TIME). 8/15/2025 Amendment 0002- THIS AMENDMENT 1) REPLACES ATTACHMENT "SECTION 01 11 00 SOW CEO975 REWIRE POWER AND DATE FOR RANGES 5 AND 1" DATED JULY 21, 2025 WITH "SECTION 01 11 00 SOW CEO975 REWIRE POWER AND DATE FOR RANGES 5 AND 1_14AUG2025" DATED AUG 14 2025 AND 2) REPLACES "SECTION 00 73 00 SUPPLEMENTARY CONDITIONS WAGE DET WA20250111 DATED 07_18_2025" WITH "SECTION 00 73 00 SUPPLEMENTARY CONDITIONS WAGE DET WA20250111 DATED 08_15_2025". See attachments. 8/11/2025 Amendment 0001- THIS AMENDMENT EXTENDS THE SOLICITATION CLOSING DATE AND BID OPENING DATE FROM 19 AUG 2025 TO 26 AUG 2025. NO CHANGES WERE MADE TO DOCUMENT "SECTION 00 21 00 INSTRUCTIONS TO BIDDERS W912DW25BA0014" BUT SEE PARA 10 AND KNOW THAT THE DATE SPECIFIED IN BLOCK 13 OF THE 1442 NOW STATES 26 AUG 2025. See attachment "Solicitation Amendment W912DW25BA0140001 SF 30". 8/1/2025: Organized Site Visit sign in rosters have been added: See attachments "Pre Bid Site Visit 31July25" and "Pre Bid Site Visit 1Aug25". CONSTRUCTION PROJECT TO REPAIR EXISTING POWER AND COMMUNICATIONS CABLES TO EXISTING TARGETS ON RANGE TO ACCEPT THE NEW ARMY FUTURE ARMY SYSTEM INTEGRATED TARGETS (FASIT). THIS PROJECT WILL INCLUDE MODIFICATIONS OF EXISTING TARGET EMPLACEMENTS TO PROVIDE A NEW DATA PANEL, LOAD CENTER AND NEW POWER OUTLETS FOR THE FUTURE INSTALLATION OF TARGET AND THERMAL BLANKETS.
From Solicitation posted on Sep 03, 2025Notice history
8-
Presolicitation Posted Jul 07, 2025
-
Solicitation Posted Jul 23, 2025View changes (3)
- Description: Description was updated
- Notice Type: Presolicitation → Solicitation
- Response Deadline: Not set → Aug 19, 2025
-
Solicitation Posted Aug 11, 2025View changes (2)
- Description: Description was updated
- Response Deadline: Aug 19, 2025 → Aug 26, 2025
-
Solicitation Posted Aug 22, 2025View changes (2)
- Description: Description was updated
- Response Deadline: Aug 26, 2025 → Sep 02, 2025
Details
Award Information
Not yet awarded
Contacts
Phone
Agency
Place of Performance
USA