Request for Quotes (RFQ) to upgrade security lights at U.S. Government residence 10/316. PR15755127
Summary
AI-generated · Apr 11, 2026Supply and install weatherproof double-tube light fittings (two tubes per fixture) at a height of 3 meters, using Philips, FSL or Radiant brand. Provide and install 2.5 mm by 3-core armored cable (approximately 50 m) and associated accessories (watertight junction boxes, compression glands, flex cables, wire nuts) to tap power from the nearest light pole to the nearest light point.
Also supply and install 250 m of 2.5 mm single-core cables (RGB) and associated accessories (20 mm PVC pipes, couplings, nipples, round boxes, round covers). Perform wall chasing along the 250 m stretch; complete masonry, gardening, and painting to restore affected walls and lawn. Carry out trenching to 70 cm depth with a caution tape 10 cm above the cable. All work must conform to the Statement of Work, Specifications, General Conditions, and Contract Terms and Conditions; if conflicts arise, follow the more stringent requirement.
The proposals from General Contractors to upgrade security lights at U.S. Government residence 10/316 includes: Supply and installation of double tube weatherproof light fittings with 2 tube lights on each at 3 meters heights (Phillips, FSL or radiant brand). Supplying and installation of 2.5 mm by 3 core armored cables (about 50 meter) as well as associated accessories (watertight junction boxes, compression glands, flex cables, wire nuts, etc.) to tap power from the nearest light pole to the nearest light point. Supplying and installation of 250 meters by 2.5 mm single core cables (RGB) and associated accessories (20 mm PVC pipes, copulins, nipples, round boxes, round covers). Wall chasing works all along the 250 meters stretch. Masonry works, gardening works and painting for restoration of affected walls and the lawn. Trenching will be done to 70 cm deep and a caution tape will be laid 10 cm above the cable. Work shall be carried out in conformance with this Statement of Work (SOW) and Specifications, General Conditions, and the Contract Terms and Conditions. If there is a conflict between the documents, the Contractor shall follow the more stringent requirement.
From Solicitation posted on Apr 10, 2026Notice history
1Details
Award Information
Not yet awarded
Contacts
Phone
Agency
Place of Performance
MWI