Contacts, documents and full notice history are available with a subscription.
Solicitation NONE Expired 6 notices 4 documents

Request for Proposals: Artificial Intelligence Infrastructure and Energy Generation on DOE Land at Savannah River Site RFP-AI-1

Solicitation RFP-AI-1 Copied Notice ID fd8e45d5e5874cfab3a32dc81d0a4ef1 Copied ENERGY, DEPARTMENT OF — NNSA NON-MO CNTRCTNG OPS DIV
SAM.gov
Posted
Sep 30, 2025
Deadline
Dec 05, 2025
Set-aside
NONE
NAICS
51821
PSC
X1PC

Summary

AI-generated · Oct 08, 2025

Pursuant to executive orders and statutory authorities, a long-term lease is being sought for a portion of Savannah River Site property to design, finance, permit, develop, construct, install, own, operate, maintain, decommission AI data center and energy generation infrastructure. Project scope encompasses AI data center facilities with specialized IT equipment, cooling facilities, energy supply and transmission/storage infrastructure, and all necessary conduits, lines, wiring, electrical systems, interconnection facilities, and other ancillary facilities required for installation, operation, maintenance, decommissioning, and site restoration/remediation of both the AI data center and the energy generation components on the available property.

Two notices convey the same solicitation language; there are no substantive changes evident between them. The descriptions do not indicate any brand-name constraints, certifications, or mandatory site visits.

Pursuant to the Executive Orders and statutory authorities, DOE s National Nuclear Security Administration s (NNSA) Savannah River Site (SRS) is issuing this Request for Proposals (the RFP ) to solicit proposals from entities interested in entering a long-term Lease covering a portion of identified real property located at SRS in South Carolina. The Lease Agreement with the Government is for the purposes of designing, financing, permitting, developing, constructing, installing, owning, maintaining, operating, and decommissioning AI data center and energy generation infrastructure (the Project ) including, but not limited to: data center facilities with specialized Information Technology (IT) equipment; associated cooling facilities; energy supply infrastructure; transmission and storage infrastructure; and other ancillary facilities and equipment reasonably required for the installation, maintenance, operation, decommissioning, and site restoration/remediation of AI data center and energy generation facilities including such conduits, lines, wiring, electrical systems, interconnection facilities, and other ancillary facilities and equipment reasonably required for the installation, maintenance, operation, decommissioning and site restoration of an energy generation facility given the available real property described herein.

From Solicitation posted on Sep 30, 2025

Pursuant to the Executive Orders and statutory authorities, DOE s National Nuclear Security Administration s (NNSA) Savannah River Site (SRS) is issuing this Request for Proposals (the RFP ) to solicit proposals from entities interested in entering a long-term Lease covering a portion of identified real property located at SRS in South Carolina. The Lease Agreement with the Government is for the purposes of designing, financing, permitting, developing, constructing, installing, owning, maintaining, operating, and decommissioning AI data center and energy generation infrastructure (the Project ) including, but not limited to: data center facilities with specialized Information Technology (IT) equipment; associated cooling facilities; energy supply infrastructure; transmission and storage infrastructure; and other ancillary facilities and equipment reasonably required for the installation, maintenance, operation, decommissioning, and site restoration/remediation of AI data center and energy generation facilities including such conduits, lines, wiring, electrical systems, interconnection facilities, and other ancillary facilities and equipment reasonably required for the installation, maintenance, operation, decommissioning and site restoration of an energy generation facility given the available real property described herein.

From Solicitation posted on Oct 01, 2025

Pursuant to the Executive Orders and statutory authorities, DOE s National Nuclear Security Administration s (NNSA) Savannah River Site (SRS) is issuing this Request for Proposals (the RFP ) to solicit proposals from entities interested in entering a long-term Lease covering a portion of identified real property located at SRS in South Carolina. The Lease Agreement with the Government is for the purposes of designing, financing, permitting, developing, constructing, installing, owning, maintaining, operating, and decommissioning AI data center and energy generation infrastructure (the Project ) including, but not limited to: data center facilities with specialized Information Technology (IT) equipment; associated cooling facilities; energy supply infrastructure; transmission and storage infrastructure; and other ancillary facilities and equipment reasonably required for the installation, maintenance, operation, decommissioning, and site restoration/remediation of AI data center and energy generation facilities including such conduits, lines, wiring, electrical systems, interconnection facilities, and other ancillary facilities and equipment reasonably required for the installation, maintenance, operation, decommissioning and site restoration of an energy generation facility given the available real property described herein.

From Solicitation posted on Dec 01, 2025

Pursuant to the Executive Orders and statutory authorities, DOE s National Nuclear Security Administration s (NNSA) Savannah River Site (SRS) is issuing this Request for Proposals (the RFP ) to solicit proposals from entities interested in entering a long-term Lease covering a portion of identified real property located at SRS in South Carolina. The Lease Agreement with the Government is for the purposes of designing, financing, permitting, developing, constructing, installing, owning, maintaining, operating, and decommissioning AI data center and energy generation infrastructure (the Project ) including, but not limited to: data center facilities with specialized Information Technology (IT) equipment; associated cooling facilities; energy supply infrastructure; transmission and storage infrastructure; and other ancillary facilities and equipment reasonably required for the installation, maintenance, operation, decommissioning, and site restoration/remediation of AI data center and energy generation facilities including such conduits, lines, wiring, electrical systems, interconnection facilities, and other ancillary facilities and equipment reasonably required for the installation, maintenance, operation, decommissioning and site restoration of an energy generation facility given the available real property described herein.

From Solicitation posted on Dec 02, 2025

Pursuant to the Executive Orders and statutory authorities, DOE s National Nuclear Security Administration s (NNSA) Savannah River Site (SRS) is issuing this Request for Proposals (the RFP ) to solicit proposals from entities interested in entering a long-term Lease covering a portion of identified real property located at SRS in South Carolina. The Lease Agreement with the Government is for the purposes of designing, financing, permitting, developing, constructing, installing, owning, maintaining, operating, and decommissioning AI data center and energy generation infrastructure (the Project ) including, but not limited to: data center facilities with specialized Information Technology (IT) equipment; associated cooling facilities; energy supply infrastructure; transmission and storage infrastructure; and other ancillary facilities and equipment reasonably required for the installation, maintenance, operation, decommissioning, and site restoration/remediation of AI data center and energy generation facilities including such conduits, lines, wiring, electrical systems, interconnection facilities, and other ancillary facilities and equipment reasonably required for the installation, maintenance, operation, decommissioning and site restoration of an energy generation facility given the available real property described herein.

From Solicitation posted on Dec 15, 2025

Pursuant to the Executive Orders and statutory authorities, DOE s National Nuclear Security Administration s (NNSA) Savannah River Site (SRS) is issuing this Request for Proposals (the RFP ) to solicit proposals from entities interested in entering a long-term Lease covering a portion of identified real property located at SRS in South Carolina. The Lease Agreement with the Government is for the purposes of designing, financing, permitting, developing, constructing, installing, owning, maintaining, operating, and decommissioning AI data center and energy generation infrastructure (the Project ) including, but not limited to: data center facilities with specialized Information Technology (IT) equipment; associated cooling facilities; energy supply infrastructure; transmission and storage infrastructure; and other ancillary facilities and equipment reasonably required for the installation, maintenance, operation, decommissioning, and site restoration/remediation of AI data center and energy generation facilities including such conduits, lines, wiring, electrical systems, interconnection facilities, and other ancillary facilities and equipment reasonably required for the installation, maintenance, operation, decommissioning and site restoration of an energy generation facility given the available real property described herein.

From Solicitation posted on Dec 22, 2025

Notice history

6
  1. Solicitation Posted Sep 30, 2025
  2. Solicitation Posted Oct 01, 2025
    No changes from previous notice
  3. Solicitation Posted Dec 01, 2025
    • Response Deadline: Dec 05, 2025Jan 09, 2026
  4. Solicitation Posted Dec 02, 2025
    No changes from previous notice
  5. Solicitation Posted Dec 15, 2025
    No changes from previous notice
  6. Solicitation LATEST Posted Dec 22, 2025
    No changes from previous notice

Details

Solicitation number RFP-AI-1
Notice ID fd8e45d5e5874cfab3a32dc81d0a4ef1
Notice type Solicitation
Product / Service (PSC) X1PC
NAICS 51821
Set-aside No Set aside used
Place of performance Aiken, South Carolina
Archive date Dec 06, 2025

Award Information

Not yet awarded

Contacts

primary
Jeff Hynds

Email

Agency

ENERGY, DEPARTMENT OF
ENERGY, DEPARTMENT OF
NNSA NON-MO CNTRCTNG OPS DIV

Place of Performance

Aiken, South Carolina 29802
USA

Dates

Posted Sep 30, 2025 10 months ago
Last Updated Aug 06, 2026 2 days ago
Due Dec 05, 2025 8 months ago