Contacts, documents and full notice history are available with a subscription.
Sources Sought NONE Expired 2 notices 1 document

Request for Information - Construction and Facilities Engineering Records Management Program— Administrative and CAD Support Services 6-B174-I-05468-00

Solicitation 6-B174-I-05468-00 Copied Notice ID 8585fb59e8134d87a342d414447913f7 Copied ENERGY, DEPARTMENT OF — ARGONNE NATL LAB - DOE CONTRACTOR
SAM.gov
Posted
Jun 04, 2026
Deadline
Jun 18, 2026
Set-aside
NONE
NAICS
541990
PSC
R499

Summary

AI-generated · Jun 05, 2026

Argonne National Laboratory’s Infrastructure Document Control Center (IDCC) manages construction and facilities engineering records for infrastructure, capital, maintenance, renovation, and facilities projects on the ANL campus. The IDCC currently has no dedicated CAD designer or engineer on staff to handle drawing updates, as-built production, and redline incorporation.

ANL is considering outsourcing both the administrative records management function and AutoCAD drawing update/maintenance to a qualified external provider. This Sources Sought / RFI seeks industry input on the availability of capable service providers, current capabilities and best practices, and to inform the development of a future solicitation.

Argonne National Laboratory (ANL) operates an Infrastructure Document Control Center (IDCC) that is responsible for managing construction and facilities engineering records across the full project lifecycle. The IDCC currently supports a wide range of infrastructure, capital, maintenance, renovation, and facilities engineering projects on the ANL campus. ANL currently does not have a dedicated CAD designer or engineer on staff within the IDCC to support drawing updates, as-built production, and redline incorporation. As the volume of project closeouts and drawing update requests continues, ANL is exploring the potential to outsource both the administrative records management function and the AutoCAD drawing update and maintenance function to a qualified external provider. This RFI is issued to gather information from industry to help ANL evaluate the availability of qualified service providers, understand current industry capabilities and best practices, and inform the development of a future solicitation.

From Sources Sought posted on Jun 04, 2026

Argonne National Laboratory (ANL) operates an Infrastructure Document Control Center (IDCC) that is responsible for managing construction and facilities engineering records across the full project lifecycle. The IDCC currently supports a wide range of infrastructure, capital, maintenance, renovation, and facilities engineering projects on the ANL campus. ANL currently does not have a dedicated CAD designer or engineer on staff within the IDCC to support drawing updates, as-built production, and redline incorporation. As the volume of project closeouts and drawing update requests continues, ANL is exploring the potential to outsource both the administrative records management function and the AutoCAD drawing update and maintenance function to a qualified external provider. This RFI is issued to gather information from industry to help ANL evaluate the availability of qualified service providers, understand current industry capabilities and best practices, and inform the development of a future solicitation.

From Sources Sought posted on Jun 19, 2026

Notice history

2
  1. Sources Sought Posted Jun 04, 2026
  2. Sources Sought LATEST Posted Jun 19, 2026
    • Response Deadline: Jun 18, 2026Jul 03, 2026

Details

Solicitation number 6-B174-I-05468-00
Notice ID 8585fb59e8134d87a342d414447913f7
Notice type Sources Sought
Product / Service (PSC) R499
NAICS 541990
Set-aside No Set aside used
Place of performance USA
Archive date Jul 03, 2026

Award Information

Not yet awarded

Documents

1
View on SAM.gov

Contacts

primary
Maggie Casali

Email

Phone

secondary
Jackie Arriaga

Email

Phone

Agency

ENERGY, DEPARTMENT OF
ENERGY, DEPARTMENT OF
ARGONNE NATL LAB - DOE CONTRACTOR

Place of Performance


USA

Dates

Posted Jun 04, 2026 2 months ago
Last Updated Aug 06, 2026 1 day ago
Due Jun 18, 2026 1 month ago