Replacement/resealing of the roof and building envelope at MFE ATCT Reseal_MFE_Tower_in_McAllen_Texas
Summary
AI-generated · Aug 24, 2025Replace PVC roof membrane system on Cab Roof; Replace PVC roof membrane system on Tower Catwalk; Replace the vinyl sidings of the ATCT including above and below the cab windows; Construct stud structural framing and EIFS on the ATCT; Construct a perimeter foundation beam for EIFS; Replace the front exterior door (Storefront); Reconstruct the concrete sidewalk at storefront; Replace the defogger system.
Move all existing HVAC, electrical, utilities, and conduits away from the new building EIFS; abate lead paint at the building entrance and windows; Mechanical work includes replacing the HVAC packaged unit on the 4th floor, installing a mini-split air conditioning unit in the telecom room on the 4th floor, and installing a common fresh air intake duct for the CAB HVAC units on the 4th floor.
Civil/Architectural Replace PVC roof membrane system on Cab Roof Replace PVC roof membrane system on Tower Catwalk Replace the vinyl Sidings of the ATCT including above and below the Cab windows Construct stud structural framing and Exterior Insulation Finishing System (EIFS) on the ATCT Construct perimeter foundation beam for EIFS Replace the front exterior door (Storefront) Reconstruct concrete side walk at storefront Replace defogger system. Move all existing HVAC, electrical, utilities, and conduits away from the new building EIFS Abate lead paint at building entrance and windows Mechanical Replace HVAC packaged unit on the 4th floor. Install a mini split air conditioning unit in the Telecom room on the 4th floor. Install common fresh air intake duct for the CAB HVAC units on the 4th floor.
From Solicitation posted on Aug 22, 2025Notice history
1-
Solicitation LATEST Posted Aug 22, 2025
Details
Award Information
Not yet awarded
Documents
8Contacts
Phone
Phone
Agency
Place of Performance
USA