Contacts, documents and full notice history are available with a subscription.
Solicitation Expired 5 notices

Replacement Rooftop A/C Units B104 FA527025R0034

Solicitation FA527025R0034 Copied Notice ID 18ae0a43d855440ca5be8f23640b06d8 Copied DEPT OF DEFENSE — FA5270 18 CONS PK
SAM.gov
Posted
Jul 22, 2025
Deadline
Aug 07, 2025
Set-aside
None
NAICS
238220
PSC
Z1NZ

Summary

AI-generated · Aug 24, 2025

Replace the rooftop HVAC units, ventilation system, and roofing for Building 104 at the Buckner Communication Site in Okinawa, Japan, including the associated Switchgear and Generator Rooms. The work involves removing the existing deteriorated HVAC system and installing a new one, with design and construction done to meet the specifications in the RFP and the minimum standards in the FAR.

The objective is to stop leaks that could damage facility equipment and to ensure equipment safety. The building and roof contain asbestos and lead TCLP material, which must be safely removed. All design and construction activities must comply with the RFP requirements, including safe handling and removal of hazardous materials.

This project is to remove and install new AC system, ventilation system and roofing system building 104 Switchgear and Generator Rooms, Buckner Communication Site, Okinawa, Japan. Design and construction shall comply with the specifications and requirements contained in this Request for Proposal RFP. The design and technical criteria contained and cited in this FAR establishes the minimum standards for design and construction quality. Replace all existing deteriorated HVAC system. There are concerns that leaks could cause serious damage to the facility?s equipment. The purpose of this work is to stop the leakage and ensure the safety of facility equipment. The existing building and roof contains asbestos and lead TCLP material that must be safely removed. All design and construction activities shall strictly comply with the specifications and requirements set forth in this RFP, which establish the minimum design and technical quality standards. All the work required above this contract including but not limited to.

From Presolicitation posted on Jul 22, 2025

This project is to remove and install new AC system, ventilation system and roofing system building 104 Switchgear and Generator Rooms, Buckner Communication Site, Okinawa, Japan. Design and construction shall comply with the specifications and requirements contained in this Request for Proposal RFP. The design and technical criteria contained and cited in this FAR establishes the minimum standards for design and construction quality. Replace all existing deteriorated HVAC system. There are concerns that leaks could cause serious damage to the facility?s equipment. The purpose of this work is to stop the leakage and ensure the safety of facility equipment. The existing building and roof contains asbestos and lead TCLP material that must be safely removed. All design and construction activities shall strictly comply with the specifications and requirements set forth in this RFP, which establish the minimum design and technical quality standards. All the work required above this contract including but not limited to.Site Visit, 8 Sep 2025 @1000. Kadena, AB 96367B95Requests for site visit must be submitted by 3 Sep 2025 @1400 to christopher.nicolas@us.af.mil

From Solicitation posted on Aug 25, 2025

This project is to remove and install new AC system, ventilation system and roofing system building 104 Switchgear and Generator Rooms, Buckner Communication Site, Okinawa, Japan. Design and construction shall comply with the specifications and requirements contained in this Request for Proposal RFP. The design and technical criteria contained and cited in this FAR establishes the minimum standards for design and construction quality. Replace all existing deteriorated HVAC system. There are concerns that leaks could cause serious damage to the facility?s equipment. The purpose of this work is to stop the leakage and ensure the safety of facility equipment. The existing building and roof contains asbestos and lead TCLP material that must be safely removed. All design and construction activities shall strictly comply with the specifications and requirements set forth in this RFP, which establish the minimum design and technical quality standards. All the work required above this contract including but not limited to.Site Visit, 8 Sep 2025 @1000. Kadena, AB 96367B95Requests for site visit must be submitted by 3 Sep 2025 @1400 to christopher.nicolas@us.af.mil

From Solicitation posted on Sep 09, 2025

This project is to remove and install new AC system, ventilation system and roofing system building 104 Switchgear and Generator Rooms, Buckner Communication Site, Okinawa, Japan. Design and construction shall comply with the specifications and requirements contained in this Request for Proposal RFP. The design and technical criteria contained and cited in this FAR establishes the minimum standards for design and construction quality. Replace all existing deteriorated HVAC system. There are concerns that leaks could cause serious damage to the facility?s equipment. The purpose of this work is to stop the leakage and ensure the safety of facility equipment. The existing building and roof contains asbestos and lead TCLP material that must be safely removed. All design and construction activities shall strictly comply with the specifications and requirements set forth in this RFP, which establish the minimum design and technical quality standards. All the work required above this contract including but not limited to.Site Visit, 8 Sep 2025 @1000. Kadena, AB 96367B95Requests for site visit must be submitted by 3 Sep 2025 @1400 to christopher.nicolas@us.af.mil

From Solicitation posted on Sep 18, 2025

This project is to remove and install new AC system, ventilation system and roofing system building 104 Switchgear and Generator Rooms, Buckner Communication Site, Okinawa, Japan. Design and construction shall comply with the specifications and requirements contained in this Request for Proposal RFP. The design and technical criteria contained and cited in this FAR establishes the minimum standards for design and construction quality. Replace all existing deteriorated HVAC system. There are concerns that leaks could cause serious damage to the facility?s equipment. The purpose of this work is to stop the leakage and ensure the safety of facility equipment. The existing building and roof contains asbestos and lead TCLP material that must be safely removed. All design and construction activities shall strictly comply with the specifications and requirements set forth in this RFP, which establish the minimum design and technical quality standards. All the work required above this contract including but not limited to.Site Visit, 8 Sep 2025 @1000. Kadena, AB 96367B95Requests for site visit must be submitted by 3 Sep 2025 @1400 to christopher.nicolas@us.af.mil

From Solicitation posted on Sep 21, 2025

Notice history

5
  1. Presolicitation Posted Jul 22, 2025
  2. Solicitation Posted Aug 25, 2025
    • Description: Description was updated
    • Notice Type: PresolicitationSolicitation
    • Response Deadline: Aug 07, 2025Sep 25, 2025
  3. Solicitation Posted Sep 09, 2025
    No changes from previous notice
  4. Solicitation Posted Sep 18, 2025
    No changes from previous notice
  5. Solicitation LATEST Posted Sep 21, 2025
    No changes from previous notice

Details

Solicitation number FA527025R0034
Notice ID 18ae0a43d855440ca5be8f23640b06d8
Notice type Presolicitation
Product / Service (PSC) Z1NZ
NAICS 238220
Archive date Aug 14, 2025

Award Information

Not yet awarded

Documents

No files available

View on SAM.gov

Contacts

primary
Moriah Clark

Email

Phone

secondary
Nicholas Cripe

Email

Phone

Agency

DEPT OF DEFENSE
DEPT OF THE AIR FORCE
PACIFIC AIR FORCES
FA5270 18 CONS PK

Place of Performance

Building 104 (Switchgear and Generator Rooms), Buckner Communication Site, Okinawa, Japan

Dates

Posted Jul 22, 2025 1 year ago
Last Updated Aug 06, 2026 2 days ago
Due Aug 07, 2025 1 year ago