AI-generated · Feb 04, 2026Replace two existing steam boilers, one cooling tower, and three air-handler reheat coil assemblies by installing one new steam boiler, one new cooling tower, and three new reheat coils. The contractor must perform complete removal and disposal of the old equipment and execute full installation of the new equipment, including piping, valves and insulation, electrical work, and temperature controls, along with any other work required to fully install, test, and commission the system.
The USDA Cotton & Tobacco Program requires the complete removal and disposal of two steam boilers, one cooling tower and three sets of air handler reheat coils and the installation of one steam boiler, one cooling tower and three reheat coils. This includes the complete installation of a single item of equipment, including piping, valve and insulation installation, electrical work, temperature controls work, and any and all items required to completely install, test, and commission the equipment. The solicitation documents are posted below.
From Combined Synopsis/Solicitation posted on Feb 03, 2026The USDA Cotton & Tobacco Program requires the complete removal and disposal of two steam boilers, one cooling tower and three sets of air handler reheat coils and the installation of one steam boiler, one cooling tower and three reheat coils. This includes the complete installation of a single item of equipment, including piping, valve and insulation installation, electrical work, temperature controls work, and any and all items required to completely install, test, and commission the equipment. The solicitation documents are posted below. Amendment 1 incorporates drawings into the solicitation. See below attachment.
From Combined Synopsis/Solicitation posted on Feb 11, 2026The USDA Cotton & Tobacco Program requires the complete removal and disposal of two steam boilers, one cooling tower and three sets of air handler reheat coils and the installation of one steam boiler, one cooling tower and three reheat coils. This includes the complete installation of a single item of equipment, including piping, valve and insulation installation, electrical work, temperature controls work, and any and all items required to completely install, test, and commission the equipment. The solicitation documents are posted below. Amendment 1 incorporates drawings into the solicitation. See below attachment. Site visit sign-in sheet posted below.
From Combined Synopsis/Solicitation posted on Feb 18, 2026The USDA Cotton & Tobacco Program requires the complete removal and disposal of two steam boilers, one cooling tower and three sets of air handler reheat coils and the installation of one steam boiler, one cooling tower and three reheat coils. This includes the complete installation of a single item of equipment, including piping, valve and insulation installation, electrical work, temperature controls work, and any and all items required to completely install, test, and commission the equipment. The solicitation documents are posted below. Amendment 1 incorporates drawings into the solicitation. See below attachment. Site visit sign-in sheet posted below. RFIs and responses posted below.
From Combined Synopsis/Solicitation posted on Feb 27, 2026Notice history
4-
Combined Synopsis/Solicitation Posted Feb 03, 2026
-
Combined Synopsis/Solicitation Posted Feb 11, 2026View changes (1)
- Description: Description was updated
-
Combined Synopsis/Solicitation Posted Feb 18, 2026View changes (1)
- Description: Description was updated
-
Combined Synopsis/Solicitation LATEST Posted Feb 27, 2026View changes (1)
- Description: Description was updated
Details
Award Information
Not yet awarded
Contacts
Phone
Agency
Place of Performance
USA