Contacts, documents and full notice history are available with a subscription.
Solicitation Expired 1 notice

Replacement of Bathrooms and Re-piping of potable water lines PR15462106

Solicitation PR15462106 Copied Notice ID d63dd777bf9944b2b2149f7b72d058fe Copied STATE, DEPARTMENT OF — US EMBASSY BERLIN
SAM.gov
Posted
Jul 25, 2025
Deadline
Sep 01, 2025
Set-aside
None
NAICS
56172
PSC
S201

Summary

AI-generated · Aug 24, 2025

Re-piping of all potable water lines from the basement boiler room and water meter room (hot, cold, and hot recirculation) to fixtures on both levels, covering 6 bathrooms, 2 laundry areas, and 2 kitchens. Where feasible, existing lines to these areas will be removed; lines located in areas not affected (embedded under tiled floors) will be disconnected, drained, and capped if needed. The garden water line will be renewed up to the living room, while the section under the living room floor is left in place. A new, more practical routing for the potable water lines will be planned after site visits and must be mutually agreed with the Contractor and the Embassy COR/CO. Tiles in hallways, laundry rooms, and kitchens will be removed and replaced consistent with the bathroom work, and kitchen furniture, built-in cabinets, and shelving will be removed by Embassy workshops and reinstalled after completion. The project also covers the complete renovation of the 6 bathrooms in the multifamily house referred to as Apartment 1 and Apartment 2 at Goldfinkweg 32, 14195 Berlin-Dahlem.

A mandatory site visit is required.

This project entails the re-piping of the potable water lines from the basement level boiler room and water meter room (hot and cold water and hot recirculation) to all the associated bathroom and laundry area fixtures on both levels of the house which includes 6 bathrooms and 2 laundry areas, 2 kitchens included. The existing potable water lines to these described areas, where practical, will be removed. Where the existing lines are located in areas of the house that will not be affected by the work (i.e., embedded in cement under the tiled floors), these lines will be disconnected and left in place, fully drained and capped if necessary. The garden water line will be renewed until the living room. The line will be left untouched underneath the living room floor. A new and more practical route will be chosen for the new potable water lines after a site visit(s), and will be mutually agreed upon with the Contractor and Embassy COR/CO. The tiles in the hallways, laundry rooms and kitchens shall also be removed and replaced the same as in the bathrooms with all corresponding work included. The kitchen furniture, built-in cabinets and the existing shelving will be removed by the Embassy workshops and be reinstalled after the contracted work is done. This project also includes the work and materials/technical supplies for the complete renovation of the 6 bathrooms in the multifamily house, referred to as Apartment 1 and Apartment 2 at Goldfinkweg 32, 14195 Berlin-Dahlem. NOTE: A SITE VISIT IS MANDATORY

From Solicitation posted on Jul 25, 2025

Notice history

1
  1. Solicitation LATEST Posted Jul 25, 2025

Details

Solicitation number PR15462106
Notice ID d63dd777bf9944b2b2149f7b72d058fe
Notice type Solicitation
Product / Service (PSC) S201
NAICS 56172
Place of performance Berlin, Berlin
Archive date Sep 01, 2025

Award Information

Not yet awarded

Documents

No files available

View on SAM.gov

Contacts

primary
Berlin Procurement

Email

Agency

STATE, DEPARTMENT OF
STATE, DEPARTMENT OF
US EMBASSY BERLIN

Place of Performance

Berlin, Berlin
DEU

Dates

Posted Jul 25, 2025 1 year ago
Last Updated Aug 06, 2026 2 days ago
Due Sep 01, 2025 11 months ago