Replacement of a failing flat roof system 19PL9026Q0018
Summary
AI-generated · Jul 23, 2026Replacement of a failing flat roof system at the Deputy Chief of Mission Residence (DCMR) in Warsaw, Poland. The current roof uses a conventional modified bitumen membrane and has known drainage, flashing, and waterproofing deficiencies that have caused recurring leaks and maintenance issues.
Because the DCMR is a historic property, all work must be performed in a way that preserves the building’s architectural character and visual appearance and complies with applicable local regulations. An RFQ will be issued for this project as part of a presolicitation.
The Embassy of the United States in Warsaw, Poland intends to issue a Request for Quotation (RFQ) for replacement of a failing flat roof system at the Deputy Chief of Mission Residence (DCMR). The existing roof consists of a conventional modified bitumen membrane with known drainage, flashing, and waterproofing deficiencies that have resulted in recurring leaks and maintenance issues. The DCMR is a historic property. The Contractor shall execute all work in a manner that preserves the architectural character and visual appearance of the building and complies with all applicable local regulations.
From Presolicitation posted on Jul 22, 2026Notice history
1-
Presolicitation LATEST Posted Jul 22, 2026
Details
Award Information
Not yet awarded
Contacts
Phone
48225042000
Agency
Place of Performance
POL