Replacement of 6 bathrooms and a re-pipe of all potable water lines, hot, cold, circulation and sewage PR15736516
Summary
AI-generated · Jan 08, 2026Replace and re-pipe all potable water lines (hot, cold, and hot recirculation) from the basement boiler room and water meter room to all fixtures across two levels, covering 6 bathrooms, 2 laundry areas, and 2 kitchens; replace all sewage piping from the city system to these areas. Remove feasible existing lines, disconnect and cap lines not affected, renew the garden water line to the living room, and install an additional garden line with a side exterior tap in the kitchen. Route the new potable lines after site visits, with the route mutually agreed with the Contractor and Embassy COR. Remove and re-install floor, wall tiles in hallways, laundry rooms, kitchens, and bathrooms; remove kitchen cabinets and built-ins for re-installation after work; install shut-off valves in each bathroom; meters for garden water and incoming house line to remain; prepare non-tiled areas with plaster (Q3) and Caparol Malerit white paint; tile installation with thin-bed mortar; ensure all electrical and piping work for the new fixtures is installed and terminated before tiling.
Work located at Goldfinkweg 38A, 14195 Berlin-Dahlem, including complete renovation of six bathrooms (master baths 1–2, kids baths 3–4, guest baths 5–6); removal and storage/reinstallation of radiators and related fixtures, with the kitchen radiator stored separately. Remove and re-tile as needed, including floors and walls behind fixtures; on-site inspection is required before bid submission. A detailed statement of work is available from the Embassy’s procurement office. All work must comply with DIN and VDE regulations.
General Description This project entails the re-piping of the potable water lines from the basement level boiler room and water meter room (hot and cold water and hot recirculation) to all the associated bathroom and laundry area fixtures on both levels of the house which includes 6 bathrooms and 2 laundry areas, 2 kitchens included. This also includes the replacement of all sewage piping systems from the city sewage system to all bathrooms and kitchen area The existing potable water lines to these described areas, where practical, will be removed. Where the existing lines are located in areas of the house that will not be affected by the work (i.e., embedded in cement under the tiled floors), these lines will be disconnected and left in place, fully drained and capped if necessary. The garden water line will be renewed until the living room. The line will be left untouched underneath the living room floor. An additional line for garden water will be installed in the kitchen and furnished with a tap on the side of the building. The lines in the kitchen, that ran in a duct under the radiator on the tiling will be laid under the screed. A new and more practical route will be chosen for the new potable water lines after a site visit(s), and will be mutually agreed upon with the Contractor and Embassy COR. The tiles in the hallways, laundry rooms and kitchens shall also be removed and replaced the same as in the bathrooms with all corresponding work included. The kitchen furniture, built-in cabinets and the existing shelving will be removed by the Embassy workshops and be reinstalled after the contracted work is done. The Scope of Work outlined below contains labor and material costs for the above-described re-piping and renovation work. In addition to the re-pipe, the complete renovation of all 6 bathrooms in both houses are also outlined below. All electrical work shall be executed according to the relevant DIN and VDE regulations. This project also includes the work and materials/technical supplies for the complete renovation of the 6 bathrooms in the multifamily house, referred to as Apartment 1 and Apartment 2 at Goldfinkweg 38A, 14195 Berlin-Dahlem. The renovation includes both labor and material costs for: the master bathrooms (Baths 1 and 2), kids bathrooms (Bath 3 and 4) and the guest bathrooms with a shower (Bath 5 and 6). The floor area of the respective bathrooms 1+2 is 5.51m and the wall area is 24.25m each, in bathrooms 2+3 the floor area is 4.67m each and the wall area is 22m each. Bathrooms 5+6 have a floor area of 3.11m each and a wall area of 17.75m each. The utility rooms have a floor area of 6.72m, the kitchen 22.81m and the hallway 18.84m. In all rooms, all faucets and fixtures such as tubs, showers, toilets, and bath/shower valves must be removed. Removal of radiators, sinks, mirror cabinets and wall tiles are included in order to install later the new objects and cabinets. The radiator in the kitchen shall be stored separately and remounted. Shut off valves need to be installed in each bathroom. Meters need to remain for the gardenwater and the incoming house pipe only. The tiles on the bathroom, kitchen and hallway floors must be removed and prepared for the new tiles. The wall tiles must be completely removed and the walls are to be prepared for new tiles in behind the objects as backsplashes. The tiles should be laid in thin-bed mortar. All electrical and piping work including cables and connectors for the new objects must be laid and terminated before the work to accommodate the tiles is prepared. All non-tiled areas shall be plastered in Q3 quality and painted with Caparol Malerit white. All walls must be reinstalled. These services are part of the contract. An on-site inspection is required before submitting the offer. The detailed SOW can be obtained by contacting: BerlinEinkauf@state.gov
From Solicitation posted on Jan 07, 2026Notice history
1Details
Award Information
Not yet awarded
Contacts
Agency
Place of Performance
DEU