REPLACE TUBE BUNDLE IN COOLING TOWER 2, BLDG. 464, DAM NECK ANNEX, VIRGINIA BEACH, VIRGINIA N4008525R2699
Summary
AI-generated · Aug 24, 2025Replace Tube Bundle in Cooling Tower 2, Building 464, Dam Neck Annex, Virginia Beach, Virginia requires providing supervision, labor, materials, and equipment to perform the replacement of the tube bundle in Cooling Tower #2. The contractor must secure all electrical power to Cooling Tower #2 (Model 10077923-B1-MHF7105QAEBNG-13) and any associated hazardous energy to enable the heat exchanger coil replacement, using OSHA-approved Lockout/Tagout procedures in EM 385-1-1 Section 12, 29 CFR 1910.333, 29 CFR 1915.89, and the Hazardous Energy Control Program (HECP). Only contractors in MACC Group ID ML-C00075 may bid on this project.
The three records provided are identical; no changes in scope or requirements are noted between notices, and bidding remains restricted to ML-C00075.
Provide supervision, labor, material and equipment required to perform all work to Replace Tube Bundle in Cooling Tower #2, at DN-464. The Contractor shall properly secure all electrical power to Cooling Tower #2 - Model 10077923-B1-MHF7105QAEBNG-13 and any associated hazardous energy to allow for the proper replacement of heat exchanger coil, by utilizing OSHA approved Lockout/Tag out procedures in accordance with EM 385-1-1 Section 12, 29 CFR 1910.333, 29 CFR 1915.89, and paragraph Hazardous Energy Control Program (HECP). ONLY CONTRACTORS IN THIS MACC GROUP ID: ML-C00075 CAN BID ON THIS PROJECT.
From Solicitation posted on May 30, 2025Provide supervision, labor, material and equipment required to perform all work to Replace Tube Bundle in Cooling Tower #2, at DN-464. The Contractor shall properly secure all electrical power to Cooling Tower #2 - Model 10077923-B1-MHF7105QAEBNG-13 and any associated hazardous energy to allow for the proper replacement of heat exchanger coil, by utilizing OSHA approved Lockout/Tag out procedures in accordance with EM 385-1-1 Section 12, 29 CFR 1910.333, 29 CFR 1915.89, and paragraph Hazardous Energy Control Program (HECP). ONLY CONTRACTORS IN THIS MACC GROUP ID: ML-C00075 CAN BID ON THIS PROJECT.
From Solicitation posted on Jul 10, 2025Provide supervision, labor, material and equipment required to perform all work to Replace Tube Bundle in Cooling Tower #2, at DN-464. The Contractor shall properly secure all electrical power to Cooling Tower #2 - Model 10077923-B1-MHF7105QAEBNG-13 and any associated hazardous energy to allow for the proper replacement of heat exchanger coil, by utilizing OSHA approved Lockout/Tag out procedures in accordance with EM 385-1-1 Section 12, 29 CFR 1910.333, 29 CFR 1915.89, and paragraph Hazardous Energy Control Program (HECP). ONLY CONTRACTORS IN THIS MACC GROUP ID: ML-C00075 CAN BID ON THIS PROJECT.
From Solicitation posted on Jul 11, 2025Notice history
3-
Solicitation Posted May 30, 2025
-
Solicitation LATEST Posted Jul 11, 2025No changes from previous notice
Details
Award Information
Not yet awarded
Contacts
Phone
Agency
Place of Performance
USA