Contacts, documents and full notice history are available with a subscription.
Solicitation SBA Expired 3 notices 1 document

Replace outdated tower cabs 149FWTowerCabs

Solicitation 149FWTowerCabs Copied Notice ID 126ef304f3a14f2783f5db0acf26ad34 Copied DEPT OF DEFENSE — W7N2 USPFO ACTIVITY TXANG 149
SAM.gov
Posted
Jul 18, 2025
Deadline
Aug 01, 2025
Set-aside
SBA
NAICS
332312
PSC
5445

Summary

AI-generated · Aug 25, 2025

Replace outdated tower cabs by removing the existing units and installing newly fabricated cabs. The contract covers all fabrication, demolition/removal of the old cabs, transportation to the site, and installation of two cabs atop the towers, with work planned to minimize disruption to ongoing operations and to meet current safety, regulatory, and operational standards. Deliveries are to the specified Texas facility by the stated deadline, and this procurement is set aside for 100% small business participation.

Updates in July 2025 added an attachment with dimensions and pictures, extended the quote submission window, and included a Q&A. The Q&A confirms the full scope includes removal of the old cabs and installation of the new cabs, and that the price should cover demolition/removal, transportation to the site, and installation. A two-tone checkered paint scheme is specified, and electrical requirements call for five quadplex outlets and four duplex outlets fed from a 75A, 120/240 VAC panel with a ground bus and eight circuits. Note that some referenced drawings/dimensions were not available in the official attachments, per the Q&A.

100% SMALL BUSINESS SET ASIDE Award is made due to price and other factors delivery/install, and customer review of specifications 1. PURPOSE. Replace outdated tower cabs by removing older cabs and installing the newly fabricated cabs in their places. 2. SCOPE OF WORK. Includes all fabrication, demolition, transportation, and installation activities required to complete the upgrade efficiently and safely with minimal disruption to ongoing tower operations. This work will ensure improved structural integrity, safety, and functionality of the towers, while meeting current operational and regulatory standards. 3. DELIVERY LOCATION AND DELIVERY DATE. These cabs shall be delivered to the Texas Air National Guard 149 Fighter Wing/DET-1 (Yankee Range), located at 2200 FM 624 W, Tilden, Texas 78072 (28.23906 N, 98.71525 W) not later than October 30, 2025. 4. QUANTITY REQUIRED: 2 Tower Cabs

From Solicitation posted on Jul 18, 2025

25 JULY 2025 UPDATES -Amended and extended quote submission date, added Q&A below. -SEE NEW ATTACHMENT FOR DEMENSIONS AND PICTURES Q&A current as of 23 July 2025: Good morning, Below are the Q&A responses I have from all contractors thus far to include yours: Contractor 1: If selected, do we have to remove, demolish the existing tower cabs and provide installation of the new cabs or we just need to deliver the tower cabs? If possible, can you please share any drawings or example pictures of the building so we can put together an accurate proposal. Response: Complete project is removal of old tower cab and install of new cab. See Attached Contractor 2: 1. There is a reference to drawings, 5.12 Unit to have five quadplex outlets and four duplex outlets. Outlets are wall mounted and circuited as shown on the electric plan, sheet 4 of 7. From below, I assume that this is a 10'x12' cab. Two 12' walls to have two rows of 18" wide x 20 12" tall checkers, two 10' walls to have two rows of 17 18" wide x 20 12" checker I am guessing that this is a bombing range tower(s). Are there typical Air Force or USACE specs that accompany? Are they required to conform to any DOD UFCs Hard to tell but is the45 degree glass referenced on the upper corner with 15 degree glass on vertical wall? Are you looking for a price for the cabs only fob Tilden TX and you install? Responses: Question 1- Electrical requirement for the cab are 5 quadplex outlets that are wall mounted and a total of 4 single gang junction boxes feed from 75amp 120/240vac panel with ground bus and 8 circuits. Reference to sheet 4 of 7 is in error no reference are available. Question 2- Yes paint scheme two tone checkered pattern with said dimensions Question 3 - Need more time to verify requirements if any Question 4- no Question 5- Price will include demolition(removal) of old cab, new cab, transportation to sire in Tilden TX, and install of new cab atop of tower. END OF Q&A ________________________________________________________________________________________________ 100% SMALL BUSINESS SET ASIDE Award is made due to price and other factors delivery/install, and customer review of specifications 1. PURPOSE. Replace outdated tower cabs by removing older cabs and installing the newly fabricated cabs in their places. 2. SCOPE OF WORK. Includes all fabrication, demolition, transportation, and installation activities required to complete the upgrade efficiently and safely with minimal disruption to ongoing tower operations. This work will ensure improved structural integrity, safety, and functionality of the towers, while meeting current operational and regulatory standards. 3. DELIVERY LOCATION AND DELIVERY DATE. These cabs shall be delivered to the Texas Air National Guard 149 Fighter Wing/DET-1 (Yankee Range), located at 2200 FM 624 W, Tilden, Texas 78072 (28.23906 N, 98.71525 W) not later than October 30, 2025. 4. QUANTITY REQUIRED: 2 Tower Cabs Q&A

From Solicitation posted on Jul 23, 2025

25 JULY 2025 UPDATES -Amended and extended quote submission date, added Q&A below. -SEE NEW ATTACHMENT FOR DEMENSIONS AND PICTURES Q&A current as of 23 July 2025: Good morning, Below are the Q&A responses I have from all contractors thus far to include yours: Contractor 1: If selected, do we have to remove, demolish the existing tower cabs and provide installation of the new cabs or we just need to deliver the tower cabs? If possible, can you please share any drawings or example pictures of the building so we can put together an accurate proposal. Response: Complete project is removal of old tower cab and install of new cab. See Attached Contractor 2: 1. There is a reference to drawings, 5.12 Unit to have five quadplex outlets and four duplex outlets. Outlets are wall mounted and circuited as shown on the electric plan, sheet 4 of 7. From below, I assume that this is a 10'x12' cab. Two 12' walls to have two rows of 18" wide x 20 12" tall checkers, two 10' walls to have two rows of 17 18" wide x 20 12" checker I am guessing that this is a bombing range tower(s). Are there typical Air Force or USACE specs that accompany? Are they required to conform to any DOD UFCs Hard to tell but is the45 degree glass referenced on the upper corner with 15 degree glass on vertical wall? Are you looking for a price for the cabs only fob Tilden TX and you install? Responses: Question 1- Electrical requirement for the cab are 5 quadplex outlets that are wall mounted and a total of 4 single gang junction boxes feed from 75amp 120/240vac panel with ground bus and 8 circuits. Reference to sheet 4 of 7 is in error no reference are available. Question 2- Yes paint scheme two tone checkered pattern with said dimensions Question 3 - Need more time to verify requirements if any Question 4- no Question 5- Price will include demolition(removal) of old cab, new cab, transportation to sire in Tilden TX, and install of new cab atop of tower. END OF Q&A ________________________________________________________________________________________________ 100% SMALL BUSINESS SET ASIDE Award is made due to price and other factors delivery/install, and customer review of specifications 1. PURPOSE. Replace outdated tower cabs by removing older cabs and installing the newly fabricated cabs in their places. 2. SCOPE OF WORK. Includes all fabrication, demolition, transportation, and installation activities required to complete the upgrade efficiently and safely with minimal disruption to ongoing tower operations. This work will ensure improved structural integrity, safety, and functionality of the towers, while meeting current operational and regulatory standards. 3. DELIVERY LOCATION AND DELIVERY DATE. These cabs shall be delivered to the Texas Air National Guard 149 Fighter Wing/DET-1 (Yankee Range), located at 2200 FM 624 W, Tilden, Texas 78072 (28.23906 N, 98.71525 W) not later than October 30, 2025. 4. QUANTITY REQUIRED: 2 Tower Cabs Q&A

From Solicitation posted on Jul 31, 2025

Notice history

3
  1. Solicitation Posted Jul 18, 2025
  2. Solicitation Posted Jul 23, 2025
    • Title: Replace outdated tower cabsReplace outdated tower cabs **Updated 23 July**
    • Description: Description was updated
    • Response Deadline: Aug 01, 2025Aug 06, 2025
  3. Solicitation LATEST Posted Jul 31, 2025
    • Title: Replace outdated tower cabs **Updated 23 July**Replace outdated tower cabs **Updated 31 July**
    • Response Deadline: Aug 06, 2025Aug 13, 2025

Details

Solicitation number 149FWTowerCabs
Notice ID 126ef304f3a14f2783f5db0acf26ad34
Notice type Solicitation
Product / Service (PSC) 5445
NAICS 332312
Place of performance Tilden, Texas
Archive date Aug 16, 2025

Award Information

Not yet awarded

Documents

1
View on SAM.gov

Contacts

primary
Capt Derek Guedes

Email

Phone

Agency

DEPT OF DEFENSE
DEPT OF THE ARMY
NATIONAL GUARD BUREAU
W7N2 USPFO ACTIVITY TXANG 149

Place of Performance

Tilden, Texas 78072
USA

Dates

Posted Jul 18, 2025 1 year ago
Last Updated Aug 06, 2026 2 days ago
Due Aug 01, 2025 1 year ago