AI-generated · Aug 24, 2025Replace the existing gas-fired boiler in Building 575 at JBSA-Randolph, TX with a new, energy-efficient, code-compliant system. This is a brand-name-or-equal replacement; the contractor must furnish all supervision, labor, materials, tools, equipment, transportation, incidentals, and quality assurance for the removal, disposal, and replacement of the boiler and related components, in accordance with the attached RFQ and SOW.
Review the RFQ and SOW for the salient characteristics and technical criteria. Submit a price quote to the POCs listed in the RFQ, and send any questions in writing by email to the specified deadline; responses will be posted on ebuy.gsa.gov as they are received. Attachments include the RFQ, SOW, and photos to aid bidding.
This requirement is being solicited as a 100% Total Small Business set aside. The NAICS code is 332410 Power Boiler and Heat Exchanger Manufacturing, size standard is 750 employees. PSC 4410. This is a Brand Name or Equal requirement for a replacement boiler. Refer to salient characteristics and technical criteria listed in the attached RFQ. PROJECT OVERVIEW. The purpose of this project is to replace the existing gas-fired boiler system in Building 575 at JBSA-Randolph, TX, with a new, energy-efficient, and code-compliant system to meet the facility's long-term heating requirements. The Statement of Work (SOW) outlines the requirements for the contractor to furnish all supervision, labor, materials, tools, equipment, transportation, incidentals, and quality assurance necessary for the removal, disposal, and replacement of the existing system and its associated components. Refer to attached RFQ and SOW for information regarding this requirement. Please provide quote to POCs listed in the RFQ. Questions/Concerns: All questions/concerns must be submitted in writing by email no later than Monday, 25 August 2025 at 10:00 am CDT. Responses to questions will be posted by the Government on the ebuy.gsa.gov website, as received. Questions submitted after this date/time will not be considered. ATTACHMENTS: 1. RFQ 2. SOW 3. PHOTOS
From Combined Synopsis/Solicitation posted on Aug 15, 2025Amendment 0001: This purpose of this amendment is to remove the clause "52.229-11 Tax on Certain Foreign Procurements - Notice and Representation" as its not applicable, update the salient characteristics, incorporate revised SOW, add Q&A, and Room Drawings. See additional attachments for all information. CS: SrA Jamie Cutright CO: Emily Rodriguez ---------------------------------------------------------------------------------------------------------------- This requirement is being solicited as a 100% Total Small Business set aside. The NAICS code is 332410 Power Boiler and Heat Exchanger Manufacturing, size standard is 750 employees. PSC 4410. This is a Brand Name or Equal requirement for a replacement boiler. Refer to salient characteristics and technical criteria listed in the attached RFQ. PROJECT OVERVIEW. The purpose of this project is to replace the existing gas-fired boiler system in Building 575 at JBSA-Randolph, TX, with a new, energy-efficient, and code-compliant system to meet the facility's long-term heating requirements. The Statement of Work (SOW) outlines the requirements for the contractor to furnish all supervision, labor, materials, tools, equipment, transportation, incidentals, and quality assurance necessary for the removal, disposal, and replacement of the existing system and its associated components. Refer to attached RFQ and SOW for information regarding this requirement. Please provide quote to POCs listed in the RFQ. Questions/Concerns: All questions/concerns must be submitted in writing by email no later than Monday, 25 August 2025 at 10:00 am CDT. Responses to questions will be posted by the Government on the ebuy.gsa.gov website, as received. Questions submitted after this date/time will not be considered. ATTACHMENTS: 1. RFQ 2. SOW 3. PHOTOS
From Combined Synopsis/Solicitation posted on Aug 27, 2025Amendment 0002: The purpose of this amendement is to extend the response due date by six (6) days from Friday 29 August at 1:00 PM CDT to Thursday 4 September at 1:00 PM CDT. CS: SrA Jamie Cutright CO: Emily Rodriguez ---------------------------------------------------------------------------------------------------------------- Amendment 0001: This purpose of this amendment is to remove the clause "52.229-11 Tax on Certain Foreign Procurements - Notice and Representation" as its not applicable, update the salient characteristics, incorporate revised SOW, add Q&A, and Room Drawings. See additional attachments for all information. CS: SrA Jamie Cutright CO: Emily Rodriguez ---------------------------------------------------------------------------------------------------------------- This requirement is being solicited as a 100% Total Small Business set aside. The NAICS code is 332410 Power Boiler and Heat Exchanger Manufacturing, size standard is 750 employees. PSC 4410. This is a Brand Name or Equal requirement for a replacement boiler. Refer to salient characteristics and technical criteria listed in the attached RFQ. PROJECT OVERVIEW. The purpose of this project is to replace the existing gas-fired boiler system in Building 575 at JBSA-Randolph, TX, with a new, energy-efficient, and code-compliant system to meet the facility's long-term heating requirements. The Statement of Work (SOW) outlines the requirements for the contractor to furnish all supervision, labor, materials, tools, equipment, transportation, incidentals, and quality assurance necessary for the removal, disposal, and replacement of the existing system and its associated components. Refer to attached RFQ and SOW for information regarding this requirement. Please provide quote to POCs listed in the RFQ. Questions/Concerns: All questions/concerns must be submitted in writing by email no later than Monday, 25 August 2025 at 10:00 am CDT. Responses to questions will be posted by the Government on the ebuy.gsa.gov website, as received. Questions submitted after this date/time will not be considered. ATTACHMENTS: 1. RFQ 2. SOW 3. PHOTOS
From Combined Synopsis/Solicitation posted on Aug 28, 2025Amendment 0003: The purpose of this amendment is to include extra equipment information for the boiler system in the attachments. NEW ATTACHMENT: Attachment 6 - Extra Equipment Information CS: SrA Jamie Cutright CO: Emily Rodriguez ---------------------------------------------------------------------------------------------------------------- Amendment 0002: The purpose of this amendement is to extend the response due date by six (6) days from Friday 29 August at 1:00 PM CDT to Thursday 4 September at 1:00 PM CDT. CS: SrA Jamie Cutright CO: Emily Rodriguez ---------------------------------------------------------------------------------------------------------------- Amendment 0001: This purpose of this amendment is to remove the clause "52.229-11 Tax on Certain Foreign Procurements - Notice and Representation" as its not applicable, update the salient characteristics, incorporate revised SOW, add Q&A, and Room Drawings. See additional attachments for all information. CS: SrA Jamie Cutright CO: Emily Rodriguez ---------------------------------------------------------------------------------------------------------------- This requirement is being solicited as a 100% Total Small Business set aside. The NAICS code is 332410 Power Boiler and Heat Exchanger Manufacturing, size standard is 750 employees. PSC 4410. This is a Brand Name or Equal requirement for a replacement boiler. Refer to salient characteristics and technical criteria listed in the attached RFQ. PROJECT OVERVIEW. The purpose of this project is to replace the existing gas-fired boiler system in Building 575 at JBSA-Randolph, TX, with a new, energy-efficient, and code-compliant system to meet the facility's long-term heating requirements. The Statement of Work (SOW) outlines the requirements for the contractor to furnish all supervision, labor, materials, tools, equipment, transportation, incidentals, and quality assurance necessary for the removal, disposal, and replacement of the existing system and its associated components. Refer to attached RFQ and SOW for information regarding this requirement. Please provide quote to POCs listed in the RFQ. Questions/Concerns: All questions/concerns must be submitted in writing by email no later than Monday, 25 August 2025 at 10:00 am CDT. Responses to questions will be posted by the Government on the ebuy.gsa.gov website, as received. Questions submitted after this date/time will not be considered. ATTACHMENTS: 1. RFQ 2. SOW 3. PHOTOS
From Combined Synopsis/Solicitation posted on Sep 01, 2025Notice history
4-
Combined Synopsis/Solicitation Posted Aug 15, 2025
-
Combined Synopsis/Solicitation Posted Aug 27, 2025View changes (1)
- Description: Description was updated
-
Combined Synopsis/Solicitation Posted Aug 28, 2025View changes (2)
- Description: Description was updated
- Response Deadline: Aug 29, 2025 → Sep 04, 2025
-
Combined Synopsis/Solicitation LATEST Posted Sep 01, 2025View changes (1)