Contacts, documents and full notice history are available with a subscription.
Solicitation SBA Expired 3 notices 8 documents

Replace Flooring Bldg 102 & Bldg 110 W50S6T26QA021

Solicitation W50S6T26QA021 Copied Notice ID d5851c6053a348329de67341099fc4d0 Copied DEPT OF DEFENSE — W7MX USPFO ACTIVITY CAANG 144
SAM.gov
Posted
Jun 10, 2026
Deadline
Jun 12, 2026
Set-aside
SBA
NAICS
238110
PSC
Z2JZ

Summary

AI-generated · May 20, 2026

Remove approximately 1,260 square feet of vinyl and carpet and recondition about 4,825 square feet of existing floors in two buildings (Bldg 102 and Bldg 110). The contractor must provide all supervision, labor, materials, tools, and equipment required to complete the work, as specified in the Statement of Work. The project value is anticipated to be between $25,000 and $100,000.

A site visit is planned; attendees must prequalify in the Defense Biometric Identification System (DBIDS) and be listed on the base access form to obtain base access. The base access form must be submitted five business days before the site visit and should include attendee names, citizenship, and DBIDS codes (6-digit). The rally point is the west gate parking lot, with limited parking, so carpooling is strongly advised. Refer to the Base Access Attachment for the exact instructions.

The scope of work for this requirement involves removing approximately 1,260 square feet of vinyl and carpet flooring, reconditioning approximately 4,825 square feet of existing floors in two separate buildings. The Contractor shall provide all necessary supervision, labor, materials, tools, and equipment necessary to accomplish the work, as identified in the Statement of Work. The magnitude of this requirement is between $25,000 and $100,000. A site visit is tentatively scheduled for Wednesday 27 May at 0800 PDT. The designated rally point will be the west gate parking lot. Parking space is limited, carpooling is strongly advised. Offerors must complete the Defense Biometric Identification System (DBIDS) Prequalification and be listed on the base access form to obtain base access. Complete all fields under the CONTRACTOR/VENDOR/VISITOR INFORMATION section consisting of attendee names, citizenship, and DBIDS code (6-digit code). The base access form must be provided 5 business days before the site visit. Refer to Attachment, Base Access Request for additional instructions. As required by 15 U.S.C. 644(w), implemented by RFO FAR 36.101-4, the following information is provided to interested small businesses: (A). The National Guard Bureau (NGB) has no agency-specific policies or procedures applicable to definitization of equitable adjustments for change orders under construction contracts, other than those described at FAR 43.204, DFARS 243.204 and Army FAR Supplement (AFARS) 5143.204. (B). Data for the prior 3 fiscal years regarding the time required to definitize equitable adjustments for change orders under construction contracts for the NGB is currently unavailable, however data for Department of the Army (which NGB reports to) is listed below: Selected Agency: DEPT OF THE ARMY Time to definitize after receipt of an adequate Change Order Definitization Proposal under Construction Contracts: Number of Change Order Proposals definitized under Construction Contracts 30 days or less: 0 31 to 60 days: 1 61 to 90 days: 0 91 to 180 days: 0 181 to 365 days: 1 Greater than 365 days: 1 After completion of contract performance via a contract modification addressing all undefinitized equitable adjustments received during contract performance 2

From Solicitation posted on May 19, 2026

The scope of work for this requirement involves removing approximately 1,260 square feet of vinyl and carpet flooring, reconditioning approximately 4,825 square feet of existing floors in two separate buildings. The Contractor shall provide all necessary supervision, labor, materials, tools, and equipment necessary to accomplish the work, as identified in the Statement of Work. The magnitude of this requirement is between $25,000 and $100,000. A site visit is tentatively scheduled for Wednesday 27 May at 0800 PDT. The designated rally point will be the west gate parking lot. Parking space is limited, carpooling is strongly advised. Offerors must complete the Defense Biometric Identification System (DBIDS) Prequalification and be listed on the base access form to obtain base access. Complete all fields under the CONTRACTOR/VENDOR/VISITOR INFORMATION section consisting of attendee names, citizenship, and DBIDS code (6-digit code). The base access form must be provided 5 business days before the site visit. Refer to Attachment, Base Access Request for additional instructions. As required by 15 U.S.C. 644(w), implemented by RFO FAR 36.101-4, the following information is provided to interested small businesses: (A). The National Guard Bureau (NGB) has no agency-specific policies or procedures applicable to definitization of equitable adjustments for change orders under construction contracts, other than those described at FAR 43.204, DFARS 243.204 and Army FAR Supplement (AFARS) 5143.204. (B). Data for the prior 3 fiscal years regarding the time required to definitize equitable adjustments for change orders under construction contracts for the NGB is currently unavailable, however data for Department of the Army (which NGB reports to) is listed below: Selected Agency: DEPT OF THE ARMY Time to definitize after receipt of an adequate Change Order Definitization Proposal under Construction Contracts: Number of Change Order Proposals definitized under Construction Contracts 30 days or less: 0 31 to 60 days: 1 61 to 90 days: 0 91 to 180 days: 0 181 to 365 days: 1 Greater than 365 days: 1 After completion of contract performance via a contract modification addressing all undefinitized equitable adjustments received during contract performance 2

From Solicitation posted on May 21, 2026

The scope of work for this requirement involves removing approximately 1,260 square feet of vinyl and carpet flooring, reconditioning approximately 4,825 square feet of existing floors in two separate buildings. The Contractor shall provide all necessary supervision, labor, materials, tools, and equipment necessary to accomplish the work, as identified in the Statement of Work. The magnitude of this requirement is between $25,000 and $100,000. A site visit is tentatively scheduled for Wednesday 27 May at 0800 PDT. The designated rally point will be the west gate parking lot. Parking space is limited, carpooling is strongly advised. Offerors must complete the Defense Biometric Identification System (DBIDS) Prequalification and be listed on the base access form to obtain base access. Complete all fields under the CONTRACTOR/VENDOR/VISITOR INFORMATION section consisting of attendee names, citizenship, and DBIDS code (6-digit code). The base access form must be provided 5 business days before the site visit. Refer to Attachment, Base Access Request for additional instructions. As required by 15 U.S.C. 644(w), implemented by RFO FAR 36.101-4, the following information is provided to interested small businesses: (A). The National Guard Bureau (NGB) has no agency-specific policies or procedures applicable to definitization of equitable adjustments for change orders under construction contracts, other than those described at FAR 43.204, DFARS 243.204 and Army FAR Supplement (AFARS) 5143.204. (B). Data for the prior 3 fiscal years regarding the time required to definitize equitable adjustments for change orders under construction contracts for the NGB is currently unavailable, however data for Department of the Army (which NGB reports to) is listed below: Selected Agency: DEPT OF THE ARMY Time to definitize after receipt of an adequate Change Order Definitization Proposal under Construction Contracts: Number of Change Order Proposals definitized under Construction Contracts 30 days or less: 0 31 to 60 days: 1 61 to 90 days: 0 91 to 180 days: 0 181 to 365 days: 1 Greater than 365 days: 1 After completion of contract performance via a contract modification addressing all undefinitized equitable adjustments received during contract performance 2 Update 1: Questions and Answers, Images of Flooring and Drawings are attached.

From Solicitation posted on Jun 10, 2026

Notice history

3
  1. Solicitation Posted May 19, 2026 View
  2. Solicitation Posted May 21, 2026
    No changes from previous notice
  3. Solicitation LATEST Posted Jun 10, 2026
    • Description: Description was updated

Details

Solicitation number W50S6T26QA021
Notice ID d5851c6053a348329de67341099fc4d0
Notice type Solicitation
Product / Service (PSC) Z2JZ
NAICS 238110
Place of performance Fresno, California
Archive date Jun 27, 2026

Award Information

Not yet awarded

Contacts

primary
Justin Scales

Email

Phone

secondary
Jarrod Sanchez

Email

Phone

Agency

DEPT OF DEFENSE
DEPT OF THE ARMY
NATIONAL GUARD BUREAU
JFHQ USPFO CA
USPFO CA PROCUREMENT
W7MX USPFO ACTIVITY CAANG 144

Place of Performance

Fresno, California 93727
USA

Dates

Posted Jun 10, 2026 1 month ago
Last Updated Aug 06, 2026 1 day ago
Due Jun 12, 2026 1 month ago