REPLACE FEED WATER PIPING AT B-136 WATERVLIET ARSENAL W911PT26QA073
Summary
AI-generated · Jul 08, 2026Provide all labor, materials, parts, and equipment to remove and replace the feed water piping at Building 136, Watervliet Arsenal, in accordance with SOW Project #26PW004 Bldg 136v2. The project is a firm fixed-price effort with an estimated value between $25,000 and $100,000, and the period of performance is 45 calendar days from receipt of the Notice to Proceed. Prevailing wage requirements apply per the current Wage Determination NY2.
Bids must include 100% payment and performance bonds (with a separate note that a performance bond is required if the quote exceeds $150k). All work must comply with the Wage Determination NY2, and bidders should review the updated SOW in the attachments. Requests for information must be submitted in writing, and the pricing arrangement is Firm Fixed Price.
*** UPDATED SOW IN ATTACHMENTS ... RFIs DUE BY CLOSE OF BUSINESS, WEDNESDAY 8 JULY 2026 *** TO PROVIDE ALL LABOR, MATERIAL, PARTS AND EQUIPMENT REQUIRED FOR THE REMOVAL AND REPLACEMENT OF FEED WATER PIPING AT BUILDING 136 PER SOW PROJECT #26PW004 Bldg 136v2. Wage Determination General Decision Number: NY2, latest revision applies and is incorporated. Magnitude of this Project is between $25,000 and $100,000 Period of Performance is 45 Calendar Days from receipt of Notice to Proceed. 100% Payment and Performance Bonds (Performance bonds only if quote is over $150k) are required Technical POC is Michael White. Pricing Arrangement: Firm Fixed Price PLEASE READ THROUGH SOLICITATION AND APPLICABLE DOCUMENTS PRIOR TO REQUEST FOR INFORMATION. ALL REQUESTS FOR INFORMATION MUST BE IN WRITING VIA ELECTRONIC MAIL TO MARIA.D.DECRESCENZO.CIV@ARMY.MIL.
From Combined Synopsis/Solicitation posted on Jul 07, 2026*** UPDATED SOW V4 IN ATTACHMENTS - replaces all other versions *** RFI RESPONSES POSTED *** *** PIPING PICS ATTACHED *** *** RESPONSES DUE WEDNESDAY 15 JULY 2026 *** TO PROVIDE ALL LABOR, MATERIAL, PARTS AND EQUIPMENT REQUIRED FOR THE REMOVAL AND REPLACEMENT OF FEED WATER PIPING AT BUILDING 136 PER SOW PROJECT #26PW004 Bldg 136v2. Wage Determination General Decision Number: NY2, latest revision applies and is incorporated. Magnitude of this Project is between $25,000 and $100,000 Period of Performance is 45 Calendar Days from receipt of Notice to Proceed. 100% Payment and Performance Bonds (Performance bonds only if quote is over $150k) are required Technical POC is Michael White. Pricing Arrangement: Firm Fixed Price PLEASE READ THROUGH SOLICITATION AND APPLICABLE DOCUMENTS PRIOR TO REQUEST FOR INFORMATION. ALL REQUESTS FOR INFORMATION MUST BE IN WRITING VIA ELECTRONIC MAIL TO MARIA.D.DECRESCENZO.CIV@ARMY.MIL.
From Combined Synopsis/Solicitation posted on Jul 14, 2026Notice history
2-
Combined Synopsis/Solicitation Posted Jul 07, 2026
-
Combined Synopsis/Solicitation LATEST Posted Jul 14, 2026View changes (1)
- Description: Description was updated
Details
Award Information
Not yet awarded
Contacts
Phone
Agency
Place of Performance
USA