REPAIR WAKABA CDC FA527025R0038

Solicitation FA527025R0038 Copied Notice ID 0483223a22b04af98e13a06fb64f0fbd Copied DEPT OF DEFENSE — FA5270 18 CONS PK
SAM.gov
Posted
Aug 05, 2025
Deadline
Aug 15, 2025
Set-aside
None
NAICS
236220
PSC
Z2JZ

Summary

AI-generated · Aug 24, 2025

Design-build repair of Wakaba CDC across two buildings. Phase I (B131) covers exterior and interior improvements: elastomeric roof coating, replacement of rusted exterior door fixtures and frames, replacement of all float glass with tempered glass, repainting walls and countertops, installation of FRP wainscot, replacement of corroded flush valves and faucets, cleaning of HVAC ductwork and diffusers, and replacement of rusted light fixtures and ceiling tiles. The site has asbestos in wall mortar but no ACM/LBP abatement is required; workers should use appropriate PPE if disturbing mortar.

Phase II for the main building (B132) includes demolishing the front entrance metal grate/door mat, replacement of rusted exterior door fixtures and frames, replacement of float glass with tempered glass, repainting walls and countertops, FRP wainscot installation, converting CAR toilets to child-size toilets, replacement of corroded valves and faucets, repair of the kitchen grease duct to address a Fire Safety Deficiency, cleaning HVAC ductwork, replacement of diffusers, and replacement of HVAC components nearing end of life (condenser, chiller, boiler, and circulating pumps). The project may be phased further beyond these phases, and the asbestos/lead paint note from Phase I applies similarly to Phase II.

This project shall accomplish a design-build repair of:� Work for the addition shall be completed in Phase I, B131, includes recoat roof with elastomericroofing, replace rusted exterior door fixtures and frames, replace ceiling tiles, replace all float glasswith tempered glass, repaint wall and countertop, install FRP wainscot, replace corroded flushvalves and faucets, clean HVAC ductworks, replace diffuser, and replace rusted light fixtures.Work area has been tested for Asbestos-Containing Materials (ACM)/Lead-Based Paint (LBP) andonly found asbestos in the wall mortar, so no ACM/LBP abatement is needed but workers shallwear appropriate protective equipment if work involves disturbing the mortar.� Repair the Wakaba Child Development Center (CDC), B132 shall be completed in Phase II andmay require additional phasing. Work for the main building, B132, includes demolish frontentrance metal grating door mat, replace rusted exterior door fixtures and frames, replace all floatglass with tempered glass, repaint wall and countertop, install Fiberglass Reinforced Panel (FRP)wainscot, replace Children Activity Room (CAR) adult size toilets with children size toilets,replace corroded flush valves and faucets, repair kitchen grease duct to correct Fire SafetyDeficiency (FSD), clean HVAC ductworks, replace diffuser, and replace all HVAC componentsthat are near the end of their service life such as the condenser, chiller, boiler, and water circulatingpumps.

From Sources Sought posted on Jun 16, 2025

This project shall accomplish a design-build repair of:  Work for the addition shall be completed in Phase I, B131, includes recoat roof with elastomeric roofing, replace rusted exterior door fixtures and frames, replace ceiling tiles, replace all float glass with tempered glass, repaint wall and countertop, install FRP wainscot, replace corroded flush valves and faucets, clean HVAC ductworks, replace diffuser, and replace rusted light fixtures. Work area has been tested for Asbestos-Containing Materials (ACM)/Lead-Based Paint (LBP) and only found asbestos in the wall mortar, so no ACM/LBP abatement is needed but workers shall wear appropriate protective equipment if work involves disturbing the mortar.  Repair the Wakaba Child Development Center (CDC), B132 shall be completed in Phase II and may require additional phasing. Work for the main building, B132, includes demolish front entrance metal grating door mat, replace rusted exterior door fixtures and frames, replace all float glass with tempered glass, repaint wall and countertop, install Fiberglass Reinforced Panel (FRP) wainscot, replace Children Activity Room (CAR) adult size toilets with children size toilets, replace corroded flush valves and faucets, repair kitchen grease duct to correct Fire Safety Deficiency (FSD), clean HVAC ductworks, replace diffuser, and replace all HVAC components that are near the end of their service life such as the condenser, chiller, boiler, and water circulating pumps. Work for the project is described in more detail in Section 8 of this Statement of Work (SOW). Sustainable principles, to include life cycle cost- effective practices shall be integrated into the design, development, and construction of the project(s) in accordance with the latest version of UFC 1-200-02, High Performance and Sustainable Building Requirements. Construction activities may commence after the approval of the Environmental Protection Plan (EPP) and AF Form 103 (work clearance). The Contractor shall coordinate on-site safety requirements through the 718th Civil Engineer Squadron (718 CES).

From Presolicitation posted on Jun 16, 2025

This project shall accomplish a design-build repair of:? Work for the addition shall be completed in Phase I, B131, includes recoat roof with elastomericroofing, replace rusted exterior door fixtures and frames, replace ceiling tiles, replace all float glasswith tempered glass, repaint wall and countertop, install FRP wainscot, replace corroded flushvalves and faucets, clean HVAC ductworks, replace diffuser, and replace rusted light fixtures.Work area has been tested for Asbestos-Containing Materials (ACM)/Lead-Based Paint (LBP) andonly found asbestos in the wall mortar, so no ACM/LBP abatement is needed but workers shallwear appropriate protective equipment if work involves disturbing the mortar.? Repair the Wakaba Child Development Center (CDC), B132 shall be completed in Phase II andmay require additional phasing. Work for the main building, B132, includes demolish frontentrance metal grating door mat, replace rusted exterior door fixtures and frames, replace all floatglass with tempered glass, repaint wall and countertop, install Fiberglass Reinforced Panel (FRP)wainscot, replace Children Activity Room (CAR) adult size toilets with children size toilets,replace corroded flush valves and faucets, repair kitchen grease duct to correct Fire SafetyDeficiency (FSD), clean HVAC ductworks, replace diffuser, and replace all HVAC componentsthat are near the end of their service life such as the condenser, chiller, boiler, and water circulatingpumps.

From Solicitation posted on Jul 15, 2025

This project shall accomplish a design-build repair of:? Work for the addition shall be completed in Phase I, B131, includes recoat roof with elastomericroofing, replace rusted exterior door fixtures and frames, replace ceiling tiles, replace all float glasswith tempered glass, repaint wall and countertop, install FRP wainscot, replace corroded flushvalves and faucets, clean HVAC ductworks, replace diffuser, and replace rusted light fixtures.Work area has been tested for Asbestos-Containing Materials (ACM)/Lead-Based Paint (LBP) andonly found asbestos in the wall mortar, so no ACM/LBP abatement is needed but workers shallwear appropriate protective equipment if work involves disturbing the mortar.? Repair the Wakaba Child Development Center (CDC), B132 shall be completed in Phase II andmay require additional phasing. Work for the main building, B132, includes demolish frontentrance metal grating door mat, replace rusted exterior door fixtures and frames, replace all floatglass with tempered glass, repaint wall and countertop, install Fiberglass Reinforced Panel (FRP)wainscot, replace Children Activity Room (CAR) adult size toilets with children size toilets,replace corroded flush valves and faucets, repair kitchen grease duct to correct Fire SafetyDeficiency (FSD), clean HVAC ductworks, replace diffuser, and replace all HVAC componentsthat are near the end of their service life such as the condenser, chiller, boiler, and water circulatingpumps.

From Solicitation posted on Aug 05, 2025

Notice history

4
  1. Sources Sought Posted Jun 16, 2025 View
  2. Presolicitation Posted Jun 16, 2025
    • Description: Description was updated
    • Notice Type: Sources SoughtPresolicitation
    • Set-Aside: NoneNo Set aside used
  3. Solicitation Posted Jul 15, 2025
    • Description: Description was updated
    • Notice Type: PresolicitationSolicitation
    • Response Deadline: Jul 01, 2025Aug 15, 2025
    • Set-Aside: No Set aside usedNone
  4. Solicitation LATEST Posted Aug 05, 2025
    No changes from previous notice

Details

Solicitation number FA527025R0038
Notice ID 0483223a22b04af98e13a06fb64f0fbd
Notice type Solicitation
Product / Service (PSC) Z2JZ
NAICS 236220
Archive date Aug 22, 2025

Award Information

Not yet awarded

Documents

No files available

View on SAM.gov

Contacts

primary
Moriah Clark

Email

Phone

Agency

DEPT OF DEFENSE
DEPT OF THE AIR FORCE
PACIFIC AIR FORCES
FA5270 18 CONS PK

Place of Performance

Kadena AFB, Okinawa Japan
96368