Contacts, documents and full notice history are available with a subscription.
Solicitation Expired 8 notices

Repair Vehicle Barriers Gate 2 FA527025R0040

Solicitation FA527025R0040 Copied Notice ID 58a115a8dfa8419daac2cf7a4a09d346 Copied DEPT OF DEFENSE — FA5270 18 CONS PK
SAM.gov
Posted
Jun 16, 2025
Deadline
Jul 01, 2025
Set-aside
None
NAICS
238990
PSC
Z2PZ

Summary

AI-generated · Aug 23, 2025

Replace the Active Vehicle Barriers (AVBs) system at Gate 2 with new AVBs relocated farther from the Traffic Check House (B345) to provide Security Forces a minimum 9-second response time. Install vehicle sensors (safety loops) to support AVB operation, rewire electrical power and control circuits to B345, repave the road with reinforced barrier curbs to prevent circumvention, and provide storm water drains. Relocate traffic warning signs to the new AVB location. Renovate Gate 2 Traffic Check House (B345) to accommodate the AVBs, expand the electrical panel, and replace control switches and the door lock assembly at the electrical panel room entry. Renovate Gate 2 Overwatch (B348) to convert the Hydraulic Power Unit (HPU) room into storage with mechanical ventilation, and replace door locks for the HPU room and guard booth. Sustainable, life-cycle cost–oriented practices will be integrated per UFC 1-200-02.

This effort includes related add/repair vehicle barrier projects at B7502, B345, and B348 (project codes LXEZ201073MA/MB/MC). The notices show market research (sources sought) followed by a formal solicitation, with an amendment extending the solicitation deadline.

Replace existing Active Vehicle Barriers (AVBs) system at Gate 2. New AVBs shall be relocate further awayfrom the Traffic Check House, B345, to give Security Forces personnel a minimum of 9 seconds responsetime. Install vehicle sensors to support AVBs operation such as safety loops. Rewire associated electricalpower and control circuit to B345. Repave the road with reinforced barrier curbs to prevent vehicles fromcircumventing the AVBs. Provide AVBs with storm water drains. Relocate traffic warning signs to the newAVBs location. Renovate Gate 2 Traffic Check House, B345, to accommodate the new AVBs. Expandelectrical panel and replace control switches to operate the new AVBs. Replace door lock assembly at theentrance to the electrical panel room. Renovate Gate 2 Overwatch, B348, to convert the Hydraulic Power Unit(HPU) room into a storage room with mechanical air ventilation system. Replace door locks for the HPU roomand guard booth. Sustainable principles, to include life cycle cost-effective practices, will be integrated intothe design, development, and construction of the project in accordance with UFC 1-200-02. The followingprojects are part of this requirement:LXEZ201073MA ADD/REPAIR VEHICLE BARRIERS, B7502LXEZ201073MB ADD/REPAIR VEHICLE BARRIERS, B345LXEZ201073MC ADD/REPAIR VEHICLE BARRIERS, B348

From Sources Sought posted on Jun 16, 2025

Replace existing Active Vehicle Barriers (AVBs) system at Gate 2. New AVBs shall be relocate further away from the Traffic Check House, B345, to give Security Forces personnel a minimum of 9 seconds response time. Install vehicle sensors to support AVBs operation such as safety loops. Rewire associated electrical power and control circuit to B345. Repave the road with reinforced barrier curbs to prevent vehicles from circumventing the AVBs. Provide AVBs with storm water drains. Relocate traffic warning signs to the new AVBs location. Renovate Gate 2 Traffic Check House, B345, to accommodate the new AVBs. Expand electrical panel and replace control switches to operate the new AVBs. Replace door lock assembly at the entrance to the electrical panel room. Renovate Gate 2 Overwatch, B348, to convert the Hydraulic Power Unit (HPU) room into a storage room with mechanical air ventilation system. Replace door locks for the HPU room and guard booth. Sustainable principles, to include life cycle cost-effective practices, will be integrated into the design, development, and construction of the project in accordance with UFC 1-200-02.

From Presolicitation posted on Jun 16, 2025

Replace existing Active Vehicle Barriers (AVBs) system at Gate 2. New AVBs shall be relocate further awayfrom the Traffic Check House, B345, to give Security Forces personnel a minimum of 9 seconds responsetime. Install vehicle sensors to support AVBs operation such as safety loops. Rewire associated electricalpower and control circuit to B345. Repave the road with reinforced barrier curbs to prevent vehicles fromcircumventing the AVBs. Provide AVBs with storm water drains. Relocate traffic warning signs to the newAVBs location. Renovate Gate 2 Traffic Check House, B345, to accommodate the new AVBs. Expandelectrical panel and replace control switches to operate the new AVBs. Replace door lock assembly at theentrance to the electrical panel room. Renovate Gate 2 Overwatch, B348, to convert the Hydraulic Power Unit(HPU) room into a storage room with mechanical air ventilation system. Replace door locks for the HPU roomand guard booth. Sustainable principles, to include life cycle cost-effective practices, will be integrated intothe design, development, and construction of the project in accordance with UFC 1-200-02. The followingprojects are part of this requirement:LXEZ201073MA ADD/REPAIR VEHICLE BARRIERS, B7502LXEZ201073MB ADD/REPAIR VEHICLE BARRIERS, B345LXEZ201073MC ADD/REPAIR VEHICLE BARRIERS, B348

From Sources Sought posted on Jul 31, 2025

Replace existing Active Vehicle Barriers (AVBs) system at Gate 2. New AVBs shall be relocate further awayfrom the Traffic Check House, B345, to give Security Forces personnel a minimum of 9 seconds responsetime. Install vehicle sensors to support AVBs operation such as safety loops. Rewire associated electricalpower and control circuit to B345. Repave the road with reinforced barrier curbs to prevent vehicles fromcircumventing the AVBs. Provide AVBs with storm water drains. Relocate traffic warning signs to the newAVBs location. Renovate Gate 2 Traffic Check House, B345, to accommodate the new AVBs. Expandelectrical panel and replace control switches to operate the new AVBs. Replace door lock assembly at theentrance to the electrical panel room. Renovate Gate 2 Overwatch, B348, to convert the Hydraulic Power Unit(HPU) room into a storage room with mechanical air ventilation system. Replace door locks for the HPU roomand guard booth. Sustainable principles, to include life cycle cost-effective practices, will be integrated intothe design, development, and construction of the project in accordance with UFC 1-200-02. The followingprojects are part of this requirement:LXEZ201073MA ADD/REPAIR VEHICLE BARRIERS, B7502LXEZ201073MB ADD/REPAIR VEHICLE BARRIERS, B345LXEZ201073MC ADD/REPAIR VEHICLE BARRIERS, B348

From Solicitation posted on Jul 31, 2025

Replace existing Active Vehicle Barriers (AVBs) system at Gate 2. New AVBs shall be relocate further away from the Traffic Check House, B345, to give Security Forces personnel a minimum of 9 seconds response time. Install vehicle sensors to support AVBs operation such as safety loops. Rewire associated electrical power and control circuit to B345. Repave the road with reinforced barrier curbs to prevent vehicles from circumventing the AVBs. Provide AVBs with storm water drains. Relocate traffic warning signs to the new AVBs location. Renovate Gate 2 Traffic Check House, B345, to accommodate the new AVBs. Expand electrical panel and replace control switches to operate the new AVBs. Replace door lock assembly at the entrance to the electrical panel room. Renovate Gate 2 Overwatch, B348, to convert the Hydraulic Power Unit (HPU) room into a storage room with mechanical air ventilation system. Replace door locks for the HPU room and guard booth. Sustainable principles, to include life cycle cost-effective practices, will be integrated into the design, development, and construction of the project in accordance with UFC 1-200-02. The following projects are part of this requirement: LXEZ201073MA ADD/REPAIR VEHICLE BARRIERS, B7502LXEZ201073MB ADD/REPAIR VEHICLE BARRIERS, B345LXEZ201073MC ADD/REPAIR VEHICLE BARRIERS, B348Update 1 The purpose of this amendment is to extend the solicitation date from September 2, 2025, to September 4, 2025

From Solicitation posted on Aug 22, 2025

Replace existing Active Vehicle Barriers (AVBs) system at Gate 2. New AVBs shall be relocate further away from the Traffic Check House, B345, to give Security Forces personnel a minimum of 9 seconds response time. Install vehicle sensors to support AVBs operation such as safety loops. Rewire associated electrical power and control circuit to B345. Repave the road with reinforced barrier curbs to prevent vehicles from circumventing the AVBs. Provide AVBs with storm water drains. Relocate traffic warning signs to the new AVBs location. Renovate Gate 2 Traffic Check House, B345, to accommodate the new AVBs. Expand electrical panel and replace control switches to operate the new AVBs. Replace door lock assembly at the entrance to the electrical panel room. Renovate Gate 2 Overwatch, B348, to convert the Hydraulic Power Unit (HPU) room into a storage room with mechanical air ventilation system. Replace door locks for the HPU room and guard booth. Sustainable principles, to include life cycle cost-effective practices, will be integrated into the design, development, and construction of the project in accordance with UFC 1-200-02. The following projects are part of this requirement: LXEZ201073MA ADD/REPAIR VEHICLE BARRIERS, B7502LXEZ201073MB ADD/REPAIR VEHICLE BARRIERS, B345LXEZ201073MC ADD/REPAIR VEHICLE BARRIERS, B348Update 1 The purpose of this amendment is to extend the solicitation date from September 2, 2025, to September 4, 2025. Update 2 has administrative changes and extends solicitation close date.

From Solicitation posted on Sep 02, 2025

Replace existing Active Vehicle Barriers (AVBs) system at Gate 2. New AVBs shall be relocate further away from the Traffic Check House, B345, to give Security Forces personnel a minimum of 9 seconds response time. Install vehicle sensors to support AVBs operation such as safety loops. Rewire associated electrical power and control circuit to B345. Repave the road with reinforced barrier curbs to prevent vehicles from circumventing the AVBs. Provide AVBs with storm water drains. Relocate traffic warning signs to the new AVBs location. Renovate Gate 2 Traffic Check House, B345, to accommodate the new AVBs. Expand electrical panel and replace control switches to operate the new AVBs. Replace door lock assembly at the entrance to the electrical panel room. Renovate Gate 2 Overwatch, B348, to convert the Hydraulic Power Unit (HPU) room into a storage room with mechanical air ventilation system. Replace door locks for the HPU room and guard booth. Sustainable principles, to include life cycle cost-effective practices, will be integrated into the design, development, and construction of the project in accordance with UFC 1-200-02. The following projects are part of this requirement: LXEZ201073MA ADD/REPAIR VEHICLE BARRIERS, B7502LXEZ201073MB ADD/REPAIR VEHICLE BARRIERS, B345LXEZ201073MC ADD/REPAIR VEHICLE BARRIERS, B348Update 1 The purpose of this amendment is to extend the solicitation date from September 2, 2025, to September 4, 2025. Update 2 has administrative changes and extends solicitation close date. Update 003: Extends the solicitation close date from 15 September 2025 to 19 September 2025.

From Solicitation posted on Sep 12, 2025

Replace existing Active Vehicle Barriers (AVBs) system at Gate 2. New AVBs shall be relocate further away from the Traffic Check House, B345, to give Security Forces personnel a minimum of 9 seconds response time. Install vehicle sensors to support AVBs operation such as safety loops. Rewire associated electrical power and control circuit to B345. Repave the road with reinforced barrier curbs to prevent vehicles from circumventing the AVBs. Provide AVBs with storm water drains. Relocate traffic warning signs to the new AVBs location. Renovate Gate 2 Traffic Check House, B345, to accommodate the new AVBs. Expand electrical panel and replace control switches to operate the new AVBs. Replace door lock assembly at the entrance to the electrical panel room. Renovate Gate 2 Overwatch, B348, to convert the Hydraulic Power Unit (HPU) room into a storage room with mechanical air ventilation system. Replace door locks for the HPU room and guard booth. Sustainable principles, to include life cycle cost-effective practices, will be integrated into the design, development, and construction of the project in accordance with UFC 1-200-02. The following projects are part of this requirement: LXEZ201073MA ADD/REPAIR VEHICLE BARRIERS, B7502LXEZ201073MB ADD/REPAIR VEHICLE BARRIERS, B345LXEZ201073MC ADD/REPAIR VEHICLE BARRIERS, B348Update 1 The purpose of this amendment is to extend the solicitation date from September 2, 2025, to September 4, 2025. Update 2 has administrative changes and extends solicitation close date. Update 003: Extends the solicitation close date from 15 September 2025 to 19 September 2025.Update 0004 adds revised SOW, extends closing date to 23 Sep 2025 2:30 JST, adds attachment 6, adds 180 calendar days to PoP, answers RFI questions

From Solicitation posted on Sep 15, 2025

Notice history

8
  1. Sources Sought Posted Jun 16, 2025
  2. Presolicitation Posted Jun 16, 2025
    • Description: Description was updated
    • Notice Type: Sources SoughtPresolicitation
    • Response Deadline: Jul 01, 2025Jul 02, 2025
  3. Sources Sought Posted Jul 31, 2025
    • Description: Description was updated
    • Notice Type: PresolicitationSources Sought
    • Response Deadline: Jul 02, 2025Jul 01, 2025
  4. Solicitation Posted Jul 31, 2025
    • Notice Type: Sources SoughtSolicitation
    • Response Deadline: Jul 01, 2025Sep 02, 2025
  5. Solicitation Posted Aug 22, 2025
    • Description: Description was updated
    • Response Deadline: Sep 02, 2025Sep 04, 2025
  6. Solicitation Posted Sep 02, 2025
    • Description: Description was updated
    • Response Deadline: Sep 04, 2025Sep 15, 2025
  7. Solicitation Posted Sep 12, 2025
    • Description: Description was updated
    • Response Deadline: Sep 15, 2025Sep 19, 2025
  8. Solicitation LATEST Posted Sep 15, 2025
    • Description: Description was updated
    • Response Deadline: Sep 19, 2025Sep 23, 2025

Details

Solicitation number FA527025R0040
Notice ID 58a115a8dfa8419daac2cf7a4a09d346
Notice type Sources Sought
Product / Service (PSC) Z2PZ
NAICS 238990
Archive date Jul 01, 2025

Award Information

Not yet awarded

Documents

No files available

View on SAM.gov

Contacts

primary
Moriah Clark

Email

Phone

secondary
Nicholas Cripe

Email

Phone

Agency

DEPT OF DEFENSE
DEPT OF THE AIR FORCE
PACIFIC AIR FORCES
FA5270 18 CONS PK

Place of Performance

Kadena AFB, Okinawa Japan
96368

Dates

Posted Jun 16, 2025 1 year ago
Last Updated Aug 05, 2026 2 days ago
Due Jul 01, 2025 1 year ago