Repair Transit Ramp Asphalt Phase 1 FA449726AIRFIELD
Summary
AI-generated · Aug 24, 2025Repair Transient Ramp Phase 1 requires providing all labor, materials, and equipment to repair the asphalt on the ramp. Scope includes saw cutting and milling 2 inches of existing asphalt, repaving with 2 inches of PG 76-22 FAA Mix, sealing the edges, and restriping the affected areas, including wingtip lines adjacent to Taxi Lane Alpha.
Details are described in the Statement of Work (SOW).
The project consists of providing all labor, materials and equipment necessary to perform repair of Transient Ramp Phase 1. The scope of work includes the following tasks: saw cutting, milling 2 inches of existing asphalt, repaving with 2 inches of PG 76-22 FAA Mix, sealing edges, and restriping the affected areas, including wingtip lines adjacent to Taxi Lane Alpha. These requirements are detailed in the Statement of Work (SOW).
From Sources Sought posted on Aug 11, 2025Notice history
1Details
Award Information
Not yet awarded
Contacts
Agency
Place of Performance
USA