Contacts, documents and full notice history are available with a subscription.
Solicitation Expired 4 notices

Repair Shima No Ko SA FA527025R0037

Solicitation FA527025R0037 Copied Notice ID 7eb00f348d6140978029a79c6fe9a55b Copied DEPT OF DEFENSE — FA5270 18 CONS PK
SAM.gov
Posted
Aug 05, 2025
Deadline
Aug 15, 2025
Set-aside
None
NAICS
326220
PSC
Z2JZ

Summary

AI-generated · Aug 24, 2025

Design-build repair for B4081 Shima No Ko SA requiring the contractor to provide all phases from field investigations and surveys through design and construction, plus labor, supervision, materials, equipment, transportation, third-party services, and incidental tasks, to execute the work per the Statement of Work and attached documents. Finishing work must yield a fully functional final facility with no areas appearing incomplete or unfinished.

There have been prior market-sounding steps (presolicitation and sources sought) for the same project; the current solicitation repeats the same design-build repair scope for B4081 Shima No Ko SA and does not list any new requirements or changes in the provided description.

This project shall accomplish a design-build repair for the B4081 Shima No Ko SA. The project scope consists of, but is not limited to, providing all field investigations, surveys, design, plant, labor, supervision, materials, equipment, supplies, transportation, third-party services, and incidental related work to design and execute construction work defined in this Statement of Work and the attached documents. The work includes all necessary finishing work to provide the Government with a final product that is fully functional and leaves no areas of the facility that appear incomplete or unfinished.

From Sources Sought posted on Jun 15, 2025

- The project scope consists of, but is not limited to, providing all field investigations, surveys, design, plant, labor, supervision, materials, equipment, supplies, transportation, third-party services, and incidental related work to design and execute construction work defined in this Statement of Work and the attached documents. The work includes all necessary finishing work to provide the Government with a final product that is fully functional and leaves no areas of the facility that appear incomplete or unfinished. - Install hinge kits on kitchen hood exhaust vents for cleaning. Replace kitchen hoods with units that are more appropriately sized for intended uses. Replace leaking hood fire suppression systems and provide new systems for all hoods. Repaint the entire exterior of the facility. Repaint most of the interior of the facility to include all classrooms, hallways, entrances, and staff office space. Replace any floating glass panels in doors or hallways that are broken, damaged, worn, or otherwise need replacement. Place safety film that meets standards for School Age Programs (SAP) on all windows. Replace missing and/or broken skylights. Seal cracks, bolt holes, and all other openings on remaining skylights that could potentially or currently cause water leaks. Replace acoustic tile ceiling systems in rooms affected by mold growth. Replace sewer main and clear out drains. Abate asbestos in the concrete flooring above the sewer main, and in any of the gaskets on the old sewer line. Sustainable principles, to include life cycle cost-effective practices, will be integrated into the design, development, and construction of the project in accordance with UFC 1-200-02. - The scope includes the abatement/removal of any ACM, LBP, or any hazardous materials. For detailed information, see the Section 8 and 9. If the Contractor determines that materials other than those already identified as ACM/LBP in the Government-provided records require additional sampling to safety execute the awarded scope, notify the Contracting Officer, and submit sampling plans. After approval, conduct sampling and analysis in accordance with the specifications and submit the Asbestos and/or Lead Sampling and Analysis Results (ASAR/LSAR) to the Contracting Officer for action. Ensure to submit and get approved AHAP/LHAP for the discovered ACM and LBP prior to beginning the work. - The contractor shall determine the best technical design solution in conformance with current regulations. The design and construction work shall comply with US federal, Department of Defense, Air Force, and 18 Wing criteria, as well as applicable Japan regulatory requirements not specifically stated elsewhere in this project statement of work to provide a complete and usable facility upon completion.

From Presolicitation posted on Jun 16, 2025

This project shall accomplish a design-build repair for the B4081 Shima No Ko SA. The project scope consists of, but is not limited to, providing all field investigations, surveys, design, plant, labor, supervision, materials, equipment, supplies, transportation, third-party services, and incidental related work to design and execute construction work defined in this Statement of Work and the attached documents. The work includes all necessary finishing work to provide the Government with a final product that is fully functional and leaves no areas of the facility that appear incomplete or unfinished.

From Solicitation posted on Jul 15, 2025

This project shall accomplish a design-build repair for the B4081 Shima No Ko SA. The project scope consists of, but is not limited to, providing all field investigations, surveys, design, plant, labor, supervision, materials, equipment, supplies, transportation, third-party services, and incidental related work to design and execute construction work defined in this Statement of Work and the attached documents. The work includes all necessary finishing work to provide the Government with a final product that is fully functional and leaves no areas of the facility that appear incomplete or unfinished.

From Solicitation posted on Aug 05, 2025

Notice history

4
  1. Sources Sought Posted Jun 15, 2025 View
  2. Presolicitation Posted Jun 16, 2025
    • Description: Description was updated
    • Notice Type: Sources SoughtPresolicitation
    • Set-Aside: NoneNo Set aside used
    • NAICS Codes: 326220236220
  3. Solicitation Posted Jul 15, 2025
    • Description: Description was updated
    • Notice Type: PresolicitationSolicitation
    • Response Deadline: Jul 01, 2025Aug 15, 2025
    • Set-Aside: No Set aside usedNone
    • NAICS Codes: 236220326220
  4. Solicitation LATEST Posted Aug 05, 2025
    No changes from previous notice

Details

Solicitation number FA527025R0037
Notice ID 7eb00f348d6140978029a79c6fe9a55b
Notice type Solicitation
Product / Service (PSC) Z2JZ
NAICS 326220
Archive date Aug 29, 2025

Award Information

Not yet awarded

Documents

No files available

View on SAM.gov

Contacts

primary
Moriah Clark

Email

Phone

Agency

DEPT OF DEFENSE
DEPT OF THE AIR FORCE
PACIFIC AIR FORCES
FA5270 18 CONS PK

Place of Performance

Kadena AFB, Okinawa Japan
96368

Dates

Posted Aug 05, 2025 1 year ago
Last Updated Aug 06, 2026 1 day ago
Due Aug 15, 2025 11 months ago