Repair of sewer sanitary drainage system in Consulate Guayaquil 19EC3025Q0001
Summary
AI-generated · Aug 24, 2025Repair of the sewer drainage system at the U.S. Consulate Guayaquil requires a contractor to provide all professional services, labor, materials, equipment, and supplies to complete the repair of the consulate’s sewer system. The bid must include a detailed cost breakdown of the proposed services. Work must be completed within 30 calendar days, and the site will be unoccupied during execution. The contractor must coordinate with the COR for work phasing, submitting a phasing plan and a construction schedule (Gantt format) for review and approval before starting. Documentation to be provided upfront includes product specifications, drawings, project schedule, quality management plan, safety plan, activity hazard analysis, hot work permit, and work costs, all in English and Spanish as PDFs and emailed to the COR. The contract will be firm-fixed-price and awarded to the lowest-priced technically acceptable bidder, with possible no-discussion adjudication.
The project requires a civil liability policy of USD 100,000 and Defense Base Act workers’ compensation insurance starting at work commencement. Bidders must be registered in SAM at the time of quotation. A pre-quotation conference and site visit will be held at the project site with attendance limited to two representatives per company, who must be pre-registered with identifying information and bring company RFQ documentation and photo IDs. Questions about the solicitation may be submitted by the stated deadline, and quotations must be submitted by email to the contracting officer.
The U.S. Consulate Guayaquil requires repairs of the sewer drainage system to be performed at the US Government Consulate Building. The work required under this contract consists of providing all professional services, labor, materials, equipment, supplies to complete the reparation of the sewer drainage system. The Contractor s proposal shall include a detailed cost breakdown of the recommended services to be performed. The consulate is located in Av. Jos Rodrguez Bonin and Calle Santa Ana in Guayaquil, Ecuador. Work shall be completed in 30 calendar days. The residence will not be occupied during the execution of this contract. Contractor shall coordinate with the Contracting Officer Representative (COR) for work phasing and job sequencing in each stage of this project in a sequential manner. Contractor has to submit a phasing plan and with the construction schedule for review and approval prior to commencement of work at the site. The Contractor shall provide all project planning, installation personnel, equipment, materials, tools, and supervision as needed to complete the services that meet the requirements. The Contractor shall be required to prepare and submit, before the related work commences, product specifications, drawings, project schedule in Gantt format, quality management plan, project safety plan, activity hazard analysis, hot work permit and work costs. All documents must be in English and Spanish, in PDF format and must be sent via email to the COR. The Government intends to award a contract resulting from this solicitation to the lowest priced technically acceptable offeror who is a responsible contractor. The Government may award the contract based on the initial offer without discussion. The resultant contract will be a firm fixed-price type contract. If you are interested in this project, please contact GuayaquilContracting@state.gov to send you the complete solicitation package. Pursuant to FAR 4.1102, bidders are required to be registered in SAM (System for Award Management) at the time a quotation is submitted. To register to SAM, please follow the instructions detailed in the following link: https://sam.gov/content/entity-registration. Vendor shall contract a civil liability policy of USD100.000. Besides a DBA Insurance (Defense Base Act) will be required upon the work commencement. The DBA insurance may be obtained from any authorized DBA insurance broker, see Sub-Section I.12, FAR 52.228-3 WORKER S COMPENSATION INSURANCE (DEFENSE BASE ACT) (APR 1984). New DBA insurances policies can be purchased directly from any DOL (Department of Labor) approved insurance carrier. The Consulate intends to conduct a pre-quotation conference and site visit on March 18, 2025, at 10:00 a.m. at the project site. Offerors planning to attend the site visit must submit the Name, Phone number, Organization/Company, ID or Passport No. and nationality, of their company s representatives to GuayaquilContracting@state.gov no later than March 14, 2025 at 5:00 p.m., local time. This information must be provided to ensure access to the site. No substitutes or additional persons may attend the site visit. Attendees are requested to carry copy of the Request for Quotations and their Photo ID along with them. Attendance is limited to two persons per company. Direct any questions regarding this solicitation, by e-mail, to GuayaquilContracting@state.gov before 5:00 p.m., local time, March 20, 2025. Your quote must be submitted, by e-mail, to the Contracting Officer, Carlos M. Barbery, at GuayaquilContracting@state.gov before 4:00 p.m., local time, on March 28, 2025. No quotation will be accepted after this time. Period of performance The period of performance for the project shall be completed in 30 calendar days from the date of commencement. Project Site Location The Consulate is located at Av. Jos Rodrguez Bonn and Calle Santa Ana, Sector San Eduardo, Guayaquil, Ecuador Payment Terms Credit. After delivery, 30-45 days.
From Special Notice posted on Jul 21, 2025Notice history
1Details
Award Information
Not yet awarded
Contacts
Phone
Agency
Place of Performance
ECU