Repair & Maintain Airfield Stormwater System Phase II FGWB210002AB
Summary
AI-generated · Mar 09, 2026Repair and maintain the airfield stormwater drainage system east of Taxiway J at Dobbins ARB. The scope includes regrading slopes that have failed or were disturbed by prior repairs, applying sod for stabilization and positive drainage, and performing maintenance items identified for basins III, IV, and V on the airfield.
Also required are cleaning of existing flumes, pipes, and swales to reestablish proper drainage patterns, and installation of new concrete flumes at various locations across the airfield to ensure positive drainage and prevent future erosion and standing water.
While not all inclusive, this project encompasses the work necessary to repair the stormwater drainage systems east of Taxiway 'J' on Dobbins ARB. Areas where the slopes have failed or where they have been disturbed from previous repairs will be regraded and have sod applied to obtain stabilization and positive drainage. Work shall include all maintenance items identified in basin III, IV, and V on the airfield. In addition to the work associated with correcting the grades around the airfield, the cleaning of existing flumes, pipes, and swales is required to reestablish proper drainage patterns. New concrete flumes will be installed at various locations throughout the airfield to reestablish positive drainage and prevent future erosion and standing water.
From Presolicitation posted on Mar 03, 2026Notice history
1Details
Award Information
Not yet awarded
Contacts
Phone
Phone
Agency
Place of Performance
USA