Repair King Drive - Grade and Pave W519TC25RA012
Summary
AI-generated · Aug 23, 2025Repair King Drive - Grade and Pave involves regrading and paving King Drive at Rock Island Arsenal. Work includes removing existing HMA pavement and PCC islands on Rodman Avenue near Building 187, removing about 550 feet of HMA trail, relocating the King Drive/Rodman Avenue intersection about 350 feet west, creating a new exit lane on the west side of King Drive for campground traffic, constructing a 10-foot HMA shared-use path to Blunt Road, and reconstructing a portion of Blunt Road from the intersection for roughly 335 feet east. The project also coordinates with a future campground and aims to improve access for larger vehicles. The presolicitation noted a project value between $1,000,000 and $5,000,000 and required performance and payment bonds.
The solicitation reiterates these requirements and includes a scheduled site visit in the attachments (W519TC-25-R-A012). Between notices, the new information is that the presolicitation disclosed the magnitude and bonding requirements, while the current solicitation confirms the full scope and provides site-visit details.
This is a notice that a solicitation is anticipated to be forth coming and will have all necessary documents, including a scope of work. IAW FAR 36.204(f), the magnitude of this project is between $1,000,000.00 and $5,000,000.00. Performance and Payment Bonds are required. This project consists of the regrading and paving of King Drive from the intersection of Rodman Avenue and ending approximately 1,855 feet west of the Blunt Road intersection, on the Rock Island Arsenal, Rock Island, Illinois. The scope includes removing the existing Hot Mix Asphalt (HMA) pavement on King Drive according to the location mentioned above. Removing the existing Portland Cement Concrete (P.C.C.) islands on Rodman Avenue adjacent to Building 187 and removing approximately 550 feet of the existing HMA trail adjacent to Rodman Avenue near the existing intersection of King Drive and Rodman Avenue. The project shall include relocating the intersection of King Drive and Rodman Avenue approximately 350 feet west. A new exit lane shall be established on the west side of King Drive with the intent of campground vehicles and patrons to turnaround and exit the island. A new 10-foot HMA shared use path shall be established along the existing alignment of King Drive. The path shall terminate at Blunt Road. A portion of Blunt Road shall be reconstructed. The reconstruction shall begin at the intersection of King Drive and Blunt Road and terminate approximately 335 feet east of the intersection. This project is being constructed in coordination with a future campground to be built later. The new road is intended to increase the mobility of larger vehicles in the area in relation to the campground.
From Presolicitation posted on Jun 05, 2025The Army Contracting Command - Rock Island requests a proposal for the Repair King Drive - Grade and Pave project on the Rock Island Arsenal, Rock Island, IL; see attachments for details. Included in the solicitation W519TC-25-R-A012 is information on an upcoming scheduled site visit.
From Solicitation posted on Jun 23, 2025The Army Contracting Command - Rock Island requests a proposal for the Repair King Drive - Grade and Pave project on the Rock Island Arsenal, Rock Island, IL; see attachments for details. Included in the solicitation W519TC-25-R-A012 is information on an upcoming scheduled site visit.
From Solicitation posted on Jul 14, 2025The Army Contracting Command - Rock Island requests a proposal for the Repair King Drive - Grade and Pave project on the Rock Island Arsenal, Rock Island, IL; see attachments for details. Included in the solicitation W519TC-25-R-A012 is information on an upcoming scheduled site visit.
From Solicitation posted on Jul 22, 2025The Army Contracting Command - Rock Island requests a proposal for the Repair King Drive - Grade and Pave project on the Rock Island Arsenal, Rock Island, IL; see attachments for details. Included in the solicitation W519TC-25-R-A012 is information on an upcoming scheduled site visit.
From Solicitation posted on Jul 29, 2025Notice history
5-
Presolicitation Posted Jun 05, 2025
-
Solicitation Posted Jun 23, 2025View changes (3)
- Description: Description was updated
- Notice Type: Presolicitation → Solicitation
- Response Deadline: Jun 20, 2025 → Jul 23, 2025
-
Solicitation Posted Jul 14, 2025No changes from previous notice
-
Solicitation LATEST Posted Jul 29, 2025No changes from previous notice
Details
Award Information
Not yet awarded
Contacts
Agency
Place of Performance
USA