Repair King Drive - Grade and Pave W519TC25CA036
Summary
AI-generated · Sep 17, 2025Regrading and paving King Drive from the Rodman Avenue intersection to about 1,855 feet west of the Blunt Road intersection, including removal of the existing HMA pavement on King Drive, removal of PCC islands on Rodman Avenue adjacent to Building 187, and removal of approximately 550 feet of the HMA trail near the King Drive–Rodman Avenue intersection. The project relocates the King Drive and Rodman Avenue intersection about 350 feet west, adds a new exit lane on the west side of King Drive for campground vehicles to turnaround and exit, and constructs a new 10-foot HMA shared-use path along the current alignment of King Drive terminating at Blunt Road. Additionally, a portion of Blunt Road will be reconstructed starting at the King Drive–Blunt Road intersection and extending about 335 feet east. The work is coordinated with a future campground project and aims to improve mobility for larger vehicles in the area serving the campground.
Awarded to Langman Construction Inc for $1,653,050.
This project consists of the regrading and paving of King Drive from the intersection of Rodman Avenue and ending approximately 1,855 feet west of the Blunt Road intersection, on the Rock Island Arsenal, Rock Island, Illinois. The scope includes removing the existing Hot Mix Asphalt (HMA) pavement on King Drive according to the location mentioned above. Removing the existing Portland Cement Concrete (P.C.C.) islands on Rodman Avenue adjacent to Building 187 and removing approximately 550 feet of the existing HMA trail adjacent to Rodman Avenue near the existing intersection of King Drive and Rodman Avenue. The project shall include relocating the intersection of King Drive and Rodman Avenue approximately 350 feet west. A new exit lane shall be established on the west side of King Drive with the intent of campground vehicles and patrons to turnaround and exit the island. A new 10-foot HMA shared use path shall be established along the existing alignment of King Drive. The path shall terminate at Blunt Road. A portion of Blunt Road shall be reconstructed. The reconstruction shall begin at the intersection of King Drive and Blunt Road and terminate approximately 335 feet east of the intersection. This project is being constructed in coordination with a future campground to be built later. The new road is intended to increase the mobility of larger vehicles in the area in relation to the campground.
From Award Notice posted on Sep 16, 2025Notice history
1Details
Award Information
Award Notices
Posted: Sep 16, 2025
This project consists of the regrading and paving of King Drive from the intersection of Rodman Avenue and ending approximately 1,855 feet west of the Blunt Road intersection, on the Rock Island Arsenal, Rock Island, Illinois. The scope includes removing the existing Hot Mix Asphalt (HMA) pavement o...
Awardees
| Company Name | UEI | CAGE Code | Location |
|---|---|---|---|
| LANGMAN CONSTRUCTION INC | KYQ5AUK7TKP3 | 0EB92 | Rock Island, IL |
Contacts
Agency
Place of Performance
USA