Repair Kaye Auditorium Roof, B708 EEPZ254657
Summary
AI-generated · Jun 02, 2026Full replacement of the membrane roof system for the section in front of the upper-floor mechanical room at Building 708 Kaye Auditorium, including roof decking, insulation, gutter system with downspouts attached to the membrane, and roof coping.
The new roof must be a TPO single-ply membrane, designed to be free of ponding and insulated to meet ASHRAE zoning requirements for the facility. All work must follow the provided Statement of Work and Concept Design Drawings, plus applicable Air Force requirements and codes. The contractor must provide all labor, materials, equipment, transportation, and tools needed to complete the project.
The Contractor must provide all plant, labor, equipment, transportation, and tools required to complete a full replacement of the membrane roof system (including roof decking) section in front of the upper floor mechanical room building 708 Kaye Auditorium. The new roof shall be free from ponding; the new roof shall be insulated to meet ASHRAE zoning requirements for the facility. The new roof shall be a TPO single ply-membrane roofing system. The work shall include but is not limited to replacement of existing membrane roof components down to roof decking, insulation, gutter system including down spout attached to the membrane roof, and roof coping. Perform all work according to this Statement of Work (SOW), the Concept Design Drawings, and all related AF requirements and other codes and references.
From Sources Sought posted on Jun 01, 2026Notice history
1Details
Award Information
Not yet awarded
Contacts
Agency
Place of Performance
USA