REPAIR HVAC BUILDING 550 FA670325B0005
Summary
AI-generated · Aug 24, 2025Repair HVAC Building 550 involves upgrading and repairing the system: replace outside air dampers for AHU 1 and AHU 2 and install modulating actuators on those dampers; add outdoor air humidity and outdoor air temperature sensors to AHU 1 and AHU 2; replace AHU2 supply fan motor and VFD to match a new 15 hp motor; replace AHU3 DX cooling coil with a chilled water coil that meets existing coil specs; install new black iron chilled water piping from AHU3 to connect to the existing chilled water loop; install a modulating 3-way valve at the AHU3 chilled water coil; install two new chilled water pumps with new electrical disconnects and starters in the AHU 1 & 2 mechanical room; replace damaged AHU3 duct and insulation; replace all plunger-type VAVs with damper-type and ensure all perimeter VAVs have reheating coils.
All HVAC control components must connect to the existing control system, be programmed, and be functional per the Dobbins Design Guide. The work must comply with UFC 1-200-01, UFC 3-410-01, and other applicable UFCs, installation architectural standards, and local building codes.
This project will replace the outside air damper for AHU 1 & 2, install a modulating actuator on AHU 1 & 2 outside air damper. Install an outdoor air humidity and outside air temperature sensor to AHU 1 & 2. Replace AHU2 supply fan motor and VFD to match the new 15hp motor. Replace AHU 3 DX cooling coil with a chilled water coil that meets the existing coil specs. Install new black iron chilled water piping from AHU3 to connect to existing chilled water loop. Install a new modulating 3-way valve at AHU3 chilled water coil. Install two new chilled water pumps with new electrical disconnects and starters in AHU 1 & 2 mechanical room. Replace damaged AHU 3 duct and insulation. Replace all plunger type VAV s with damper type and all perimeter VAV s are to have reheating coils. All HVAC control components need to be connected to the existing HVAC control system, programmed and functional in accordance with Dobbins Design Guide. This project will comply with UFC 1-200-01, UFC 3-410-01, and other applicable UFCs, installation architectural standards, and local building codes.
From Solicitation posted on Aug 22, 2025This project will replace the outside air damper for AHU 1 & 2, install a modulating actuator on AHU 1 & 2 outside air damper. Install an outdoor air humidity and outside air temperature sensor to AHU 1 & 2. Replace AHU2 supply fan motor and VFD to match the new 15hp motor. Replace AHU 3 DX cooling coil with a chilled water coil that meets the existing coil specs. Install new black iron chilled water piping from AHU3 to connect to existing chilled water loop. Install a new modulating 3-way valve at AHU3 chilled water coil. Install two new chilled water pumps with new electrical disconnects and starters in AHU 1 & 2 mechanical room. Replace damaged AHU 3 duct and insulation. Replace all plunger type VAV’s with damper type and all perimeter VAV’s are to have reheating coils. All HVAC control components need to be connected to the existing HVAC control system, programmed and functional in accordance with Dobbins Design Guide. This project will comply with UFC 1-200-01, UFC 3-410-01, and other applicable UFCs, installation architectural standards, and local building codes.
From Solicitation posted on Sep 12, 2025Notice history