AI-generated · Aug 24, 2025At Building 486, remove the existing 10-ton packaged HVAC unit that serves the weight room and install a new 5-ton packaged unit at a new location. Demo the exterior duct, the old 10-ton unit, and the concrete pad; relocate the electrical disconnect; repair the ductwork penetration and install a new concrete pad.
At Building 486, the Contractor will remove the existing 10-Ton package unit that feeds the weight room and install a new 5-Ton package unit at a new location. Demo existing exterior duct, 10 ton unit and concrete pad. Relocate existing electrical disconnect. Repair ductwork penetration and install new concrete pad.
From Solicitation posted on Aug 05, 2025At Building 486, the Contractor will remove the existing 10-Ton package unit that feeds the weight room and install a new 5-Ton package unit at a new location. Demo existing exterior duct, 10 ton unit and concrete pad. Relocate existing electrical disconnect. Repair ductwork penetration and install new concrete pad.
From Solicitation posted on Aug 25, 2025Notice history
2-
Solicitation Posted Aug 05, 2025
-
Solicitation LATEST Posted Aug 25, 2025No changes from previous notice