Contacts, documents and full notice history are available with a subscription.
Solicitation LAS Expired 3 notices 1 document

REPAIR CRACKS AND SPALLS, B43429 FA527025R0012

Solicitation FA527025R0012 Copied Notice ID 92790cd3c5894c94a053d6ad5daf18c5 Copied DEPT OF DEFENSE — FA5270 18 CONS PK
SAM.gov
Posted
Jun 17, 2025
Deadline
Apr 15, 2025
Set-aside
LAS
NAICS
236220
PSC
Z2EA

Summary

AI-generated · Aug 24, 2025

Repair cracks and spalls on concrete walls, beams, columns, roof, floor slab, and eaves, including installing concrete jackets along column gridlines and roof beams. Restore the strength of steel members deteriorated by corrosion and replace any with more than 10% of original thickness. Apply ARAMID fiber or FRP to canopy beams and slabs. Remove and reinstall electrical and other fixtures as needed to complete repairs, then repaint repaired areas to restore the original appearance. Abate and dispose of asbestos-containing material (ACM) and lead-based paint (LBP); demolish and dispose of waste material as appropriate. Sustainable, life-cycle cost–effective practices must be integrated into design and construction per UFC 1-200-02.

Between notices, the presolicitation adds pre-construction requirements: construction may begin only after Environmental Protection Plan (EPP) approval and AF Form 103 work clearance, and the contractor must coordinate on-site safety through the 718th Civil Engineer Squadron. It also changes reinforcement material to FRP only (no ARAMID) in the canopy beams and slabs, whereas the solicitations permit either ARAMID fiber or FRP. The core scope remains the same otherwise.

Repair cracks and spalls on concrete walls, beams, columns, roof, floor slab, and eaves. Repair to install concrete jackets along column gridlines and roof beams. Repair to restore integrity of steel members that deteriorated due to corrosion and replace members whose material loss exceeds 10 percent of original thickness. Apply Fiber Reinforced Polymer (FRP) to canopy beams and slabs. Remove and reinstall electrical and other fixes to facilitate repair works as needed. Paint areas that are subjected to repair work and restore original appearance. Abate and dispose Asbestos Containing Material (ACM) and Lead-Based Paint (LBP). Demolish and dispose waste material as appropriate. Sustainable principles, to include life cycle cost-effective practices, will be integrated into the design, development, and construction of the project in accordance with UFC 1-200-02. Construction activities may commence after the approval of the Environmental Protection Plan (EPP) and AF Form 103 (work clearance). The Contractor shall coordinate on-site safety requirements through the 718th Civil Engineer Squadron (718 CES).

From Presolicitation posted on Jun 17, 2025

Repair cracks and spalls on concrete walls, beams, columns, roof, floor slab, and eaves. Repair to install concrete jackets along column gridlines and roof beams. Repair to restore integrity of steel members that deteriorated due to corrosion and replace members whose material loss exceeds 10 percent of original thickness. Apply aromatic polyamide (ARAMID) fiber or Fiber Reinforced Polymer (FRP) to canopy beams and slabs. Remove and reinstall electrical and other fixes to facilitate repair works as needed. Paint areas that are subjected to repair work and restore original appearance. Abate and dispose Asbestos Containing Material (ACM) and Lead-Based Paint (LBP). Demolish and dispose waste material as appropriate. Sustainable principles, to include life cycle cost-effective practices, will be integrated into the design, development, and construction of the project in accordance with UFC 1-200-02.

From Solicitation posted on Jun 26, 2025

Repair cracks and spalls on concrete walls, beams, columns, roof, floor slab, and eaves. Repair to install concrete jackets along column gridlines and roof beams. Repair to restore integrity of steel members that deteriorated due to corrosion and replace members whose material loss exceeds 10 percent of original thickness. Apply aromatic polyamide (ARAMID) fiber or Fiber Reinforced Polymer (FRP) to canopy beams and slabs. Remove and reinstall electrical and other fixes to facilitate repair works as needed. Paint areas that are subjected to repair work and restore original appearance. Abate and dispose Asbestos Containing Material (ACM) and Lead-Based Paint (LBP). Demolish and dispose waste material as appropriate. Sustainable principles, to include life cycle cost-effective practices, will be integrated into the design, development, and construction of the project in accordance with UFC 1-200-02.

From Solicitation posted on Jul 11, 2025

Notice history

3
  1. Presolicitation Posted Jun 17, 2025
  2. Solicitation Posted Jun 26, 2025
    • Title: REPAIR CRACKS AND SPALLS, B43429LXFB241035 REPAIR CRACKS AND SPALLS B43429
    • Description: Description was updated
    • Notice Type: PresolicitationSolicitation
    • Response Deadline: Apr 15, 2025Jul 14, 2025
    • Set-Aside: Local Area Set-Aside (FAR 26.2)None
  3. Solicitation LATEST Posted Jul 11, 2025
    No changes from previous notice

Details

Solicitation number FA527025R0012
Notice ID 92790cd3c5894c94a053d6ad5daf18c5
Notice type Presolicitation
Product / Service (PSC) Z2EA
NAICS 236220
Set-aside Local Area Set-Aside (FAR 26.2)
Place of performance JPN
Archive date Dec 31, 2025

Award Information

Not yet awarded

Documents

1
View on SAM.gov

Contacts

primary
Victor T. Cannon Jr.

Email

Phone

secondary
Jonathan Garcia

Email

Phone

Agency

DEPT OF DEFENSE
DEPT OF THE AIR FORCE
PACIFIC AIR FORCES
FA5270 18 CONS PK

Place of Performance

96368
JPN

Dates

Posted Jun 17, 2025 1 year ago
Last Updated Aug 06, 2026 2 days ago
Due Apr 15, 2025 1 year ago