REPAIR CRACKS AND SPALLS, B43421 FA527025R0017

Solicitation FA527025R0017 Copied Notice ID 33c31cc4e5ba477cb166a0a0f485bb3f Copied DEPT OF DEFENSE — FA5270 18 CONS PK
SAM.gov
Posted
Jun 18, 2025
Deadline
Apr 16, 2025
Set-aside
None
NAICS
238110
PSC
Z2JZ

Summary

AI-generated · Aug 25, 2025

Repair cracks and spalls on concrete walls, beams, columns, roof, floor slab, and eaves; install concrete jackets to columns along gridlines; restore steel members damaged by corrosion or replace any with more than 10% material loss; apply Fiber Reinforced Polymer to canopy beams; demolish and reinstall ceiling tiles and relocate electrical and other fixtures as needed to complete repairs; paint repaired areas to restore original appearance; demolish and dispose waste material; abate and dispose of Asbestos Containing Material and Lead-Based Paint; incorporate sustainable, life-cycle cost-effective practices per UFC 1-200-02; begin construction after Environmental Protection Plan approval and AF Form 103 work clearance, with on-site safety coordination through the 718th Civil Engineer Squadron.

Between notices, several amendments adjusted submission and evaluation requirements: past performance standard changed from 3 to 5 years; proposal validity period set to 69 days; removal of financial statements and Past Performance Questionnaires, with CPAR information now required; removal of the proposal summary and master table of contents requirements and the bid guarantee; and ultimately the solicitation was canceled.

This is a Pre-Solicitation notice for an upcoming project "REPAIR CRACKS AND SPALLS". Please review the attached SOW and submit any questions or concerns to SrA Joseph Allen / joseph.allen.52@us.af.mil and SSgt Jonathan Garcia / jonathan.garcia.27@us.af.mil.

From Presolicitation posted on Jun 18, 2025

Repair cracks and spalls on concrete walls, beams, columns, roof, floor slab, and eaves. Repair to install concrete jackets to columns along gridlines. Repair to restore integrity of steel members that deteriorated due to corrosion, and replace steel members where material loss exceed 10% of the original thickness. Apply Fiber Reinforced Polymer (FRP) to canopy beams. Demolish existing ceiling tiles and install new tiles. Remove and reinstall electrical and other fixes to facilitate repair works as needed. Paint areas that are subjected to repair work and restore original appearance. Demolish and dispose waste material as appropriate. Abate and dispose Asbestos Containing Material (ACM) and Lead-Based Paint (LBP). Sustainable principles, to include life cycle cost-effective practices, will be integrated into the design, development, and construction of the project in accordance with UFC 1-200-02. Construction activities may commence after the approval of the Environmental Protection Plan (EPP) and AF Form 103 (work clearance). The Contractor shall coordinate on-site safety requirements through the 718th Civil Engineer Squadron (718 CES).

From Solicitation posted on Jun 18, 2025

Amendment 0001: The purpose of this amendment is to change Section M, from a minimum of three (3) years to five (5) years of past performance. No other terms or conditions have been altered to the solicitation.Original Post: Repair cracks and spalls on concrete walls, beams, columns, roof, floor slab, and eaves. Repair to install concrete jackets to columns along gridlines. Repair to restore integrity of steel members that deteriorated due to corrosion, and replace steel members where material loss exceed 10% of the original thickness. Apply Fiber Reinforced Polymer (FRP) to canopy beams. Demolish existing ceiling tiles and install new tiles. Remove and reinstall electrical and other fixes to facilitate repair works as needed. Paint areas that are subjected to repair work and restore original appearance. Demolish and dispose waste material as appropriate. Abate and dispose Asbestos Containing Material (ACM) and Lead-Based Paint (LBP). Sustainable principles, to include life cycle cost-effective practices, will be integrated into the design, development, and construction of the project in accordance with UFC 1-200-02. Construction activities may commence after the approval of the Environmental Protection Plan (EPP) and AF Form 103 (work clearance). The Contractor shall coordinate on-site safety requirements through the 718th Civil Engineer Squadron (718 CES).

From Solicitation posted on Jul 08, 2025

Amendment 0002: The purpose of this amendment is as follows:A) Revise the proposal validity period to 69 calendar days. Block 13d is hereby changed to reflect this.B) Amend Section L regarding financial statements. The requirement to submit financial statements with the proposal is removed. Financial statements may be requested later to determine responsibility per FAR 9.104-1.C) Amend Sections L and M regarding past performance. The requirement for Past Performance Questionnaires is removed. Offerors will now submit CPAR information for recent and relevant projects. The PPQ attachment has been removed to reflect this change.D) Amend Sections L and M regarding proposal summary and table of contents. The requirement for a concise summary and master table of contents for the entire proposal is removed.E) A Bid Guarantee is no longer required and reflected in block 13b.F) Removal of clause FAR 52.228-1 Bid Guarantee.G) No other changes at this time.NOTE: Refer to Sections L and M for further details on proposal submission changes.Amendment 0001: The purpose of this amendment is to change Section M, from a minimum of three (3) years to five (5) years of past performance. No other terms or conditions have been altered to the solicitation.Original Post: Repair cracks and spalls on concrete walls, beams, columns, roof, floor slab, and eaves. Repair to install concrete jackets to columns along gridlines. Repair to restore integrity of steel members that deteriorated due to corrosion, and replace steel members where material loss exceed 10% of the original thickness. Apply Fiber Reinforced Polymer (FRP) to canopy beams. Demolish existing ceiling tiles and install new tiles. Remove and reinstall electrical and other fixes to facilitate repair works as needed. Paint areas that are subjected to repair work and restore original appearance. Demolish and dispose waste material as appropriate. Abate and dispose Asbestos Containing Material (ACM) and Lead-Based Paint (LBP). Sustainable principles, to include life cycle cost-effective practices, will be integrated into the design, development, and construction of the project in accordance with UFC 1-200-02. Construction activities may commence after the approval of the Environmental Protection Plan (EPP) and AF Form 103 (work clearance). The Contractor shall coordinate on-site safety requirements through the 718th Civil Engineer Squadron (718 CES).Proposals must be submitted no later than 23 July 2025, 1400 (2:00pm) JST.

From Solicitation posted on Jul 11, 2025

Amendment 0003: The purpose of this amendment is to serve as notification that solicitation FA527025R0017 - REPAIR CRACKS AND SPALLS, B43421, has been canceled. No other changes at this time Amendment 0002: The purpose of this amendment is as follows: A) Revise the proposal validity period to 69 calendar days. Block 13d is hereby changed to reflect this. B) Amend Section L regarding financial statements. The requirement to submit financial statements with the proposal is removed. Financial statements may be requested later to determine responsibility per FAR 9.104-1. C) Amend Sections L and M regarding past performance. The requirement for Past Performance Questionnaires is removed. Offerors will now submit CPAR information for recent and relevant projects. The PPQ attachment has been removed to reflect this change. D) Amend Sections L and M regarding proposal summary and table of contents. The requirement for a concise summary and master table of contents for the entire proposal is removed. E) A Bid Guarantee is no longer required and reflected in block 13b. F) Removal of clause FAR 52.228-1 Bid Guarantee. G) No other changes at this time. NOTE: Refer to Sections L and M for further details on proposal submission changes. Amendment 0001: The purpose of this amendment is to change Section M, from a minimum of three (3) years to five (5) years of past performance. No other terms or conditions have been altered to the solicitation. Original Post: Repair cracks and spalls on concrete walls, beams, columns, roof, floor slab, and eaves. Repair to install concrete jackets to columns along gridlines. Repair to restore integrity of steel members that deteriorated due to corrosion, and replace steel members where material loss exceed 10% of the original thickness. Apply Fiber Reinforced Polymer (FRP) to canopy beams. Demolish existing ceiling tiles and install new tiles. Remove and reinstall electrical and other fixes to facilitate repair works as needed. Paint areas that are subjected to repair work and restore original appearance. Demolish and dispose waste material as appropriate. Abate and dispose Asbestos Containing Material (ACM) and Lead-Based Paint (LBP). Sustainable principles, to include life cycle cost-effective practices, will be integrated into the design, development, and construction of the project in accordance with UFC 1-200-02. Construction activities may commence after the approval of the Environmental Protection Plan (EPP) and AF Form 103 (work clearance). The Contractor shall coordinate on-site safety requirements through the 718th Civil Engineer Squadron (718 CES).Proposals must be submitted no later than 23 July 2025, 1400 (2:00pm) JST.

From Solicitation posted on Aug 04, 2025

Notice history

5
  1. Presolicitation Posted Jun 18, 2025
  2. Solicitation Posted Jun 18, 2025
    • Description: Description was updated
    • Notice Type: PresolicitationSolicitation
    • Response Deadline: Apr 16, 2025Jul 21, 2025
  3. Solicitation Posted Jul 08, 2025
    • Description: Description was updated
  4. Solicitation Posted Jul 11, 2025
    • Description: Description was updated
  5. Solicitation LATEST Posted Aug 04, 2025
    • Description: Description was updated

Details

Solicitation number FA527025R0017
Notice ID 33c31cc4e5ba477cb166a0a0f485bb3f
Notice type Presolicitation
Product / Service (PSC) Z2JZ
NAICS 238110
Place of performance Kadena, Okinawa
Archive date Dec 31, 2025

Award Information

Not yet awarded

Documents

1
View on SAM.gov

Contacts

primary
SrA Joseph Allen

Email

Phone

secondary
Jonathan Garcia

Email

Phone

Agency

DEPT OF DEFENSE
DEPT OF THE AIR FORCE
PACIFIC AIR FORCES
FA5270 18 CONS PK

Place of Performance

Kadena, Okinawa 96368
JPN

Dates

Posted Jun 18, 2025 1 year ago
Last Updated Aug 06, 2026 1 day ago
Due Apr 16, 2025 1 year ago