Contacts, documents and full notice history are available with a subscription.
Solicitation LAS Expired 5 notices 1 document

REPAIR CRACKS AND SPALLS B43131 FA527025R0011

Solicitation FA527025R0011 Copied Notice ID f0fb16649ce24b38932020c73186899d Copied DEPT OF DEFENSE — FA5270 18 CONS PK
SAM.gov
Posted
Jun 17, 2025
Deadline
Apr 15, 2025
Set-aside
LAS
NAICS
236220
PSC
Z2EA

Summary

AI-generated · Aug 24, 2025

Design-build repair of B43131 involves repairing cracks and spalls on concrete walls, beams, columns, roof, floor slab, and eaves; installing concrete jackets to repair columns along gridlines; restoring steel members damaged by corrosion or replacing those with more than 10% loss of thickness; applying FRP or ARAMID to canopy beams; demolishing and reinstalling ceiling tiles and electrical fixtures as needed; painting repaired areas to restore original appearance; demolishing and disposing of waste materials; and abating ACM and LBP. Work is governed by the SOW (Section 8) and must incorporate sustainable, life-cycle cost-effective practices per UFC 1-200-02.

Key differences across notices: the presolicitation states that construction may commence after Environmental Protection Plan (EPP) approval and AF Form 103 (work clearance), with on-site safety coordination through the 718th Civil Engineer Squadron; and it requires FRP-only application to canopy beams, whereas other notices allow either ARAMID or FRP. The core scope (repair, demolition/reinstallation tasks, abatement, and sustainability) remains the same.

This project shall accomplish a design-build repair of B43131. Repair cracks and spalls on concrete walls, beams, columns, roof, floor slab, and eaves. Install concrete jackets to repair columns along gridlines.Repair to restore integrity of steel members that deteriorated due to corrosion, and replace steel members where material loss exceeds 10% of the original thickness. Apply Fiber Reinforced Polymer (FRP) to canopy beams. Demolish existing ceiling tiles and install new tiles. Remove and reinstall electrical and other fixtures to facilitate repair works as needed. Paint areas that are subjected to repair work and restore original appearance. Demolish and dispose of waste material as appropriate. Abate and dispose of Asbestos Containing Material (ACM) and Lead-Based Paint (LBP). Work for the project is described in more detail in Section 8 of this Statement of Work (SOW). Sustainable principles, to include life cycle cost- effective practices shall be integrated into the design, development, and construction of the project(s) in accordance with the latest version of UFC 1-200-02, High Performance and Sustainable Building Requirements.Construction activities may commence after the approval of the Environmental Protection Plan (EPP) and AF Form 103 (work clearance). The Contractor shall coordinate on-site safety requirements through the 718th Civil Engineer Squadron (718 CES).

From Presolicitation posted on Jun 17, 2025

This project shall accomplish a design-build repair of B43131. Repair cracks and spalls on concrete walls, beams, columns, roof, floor slab, and eaves. Install concrete jackets to repair columns along gridlines. Repair to restore integrity of steel members that deteriorated due to corrosion and replace steel members where material loss exceeds 10% of the original thickness. Apply aromatic polyamide (ARAMID) or Fiber Reinforced Polymer (FRP) to canopy beams. Demolish existing ceiling tiles and install new tiles. Remove and reinstall electrical and other fixtures to facilitate repair works as needed. Paint areas that are subjected to repair work and restore original appearance. Demolish and dispose of waste material as appropriate. Abate and dispose of Asbestos Containing Material (ACM) and Lead- Based Paint (LBP). Work for the project is described in more detail in Section 8 of this Statement of Work (SOW). Sustainable principles, to include life cycle cost effective practices shall be integrated into the design, development, and construction of the project(s) in accordance with the latest version of UFC 1-200-02, High Performance and Sustainable

From Solicitation posted on Jun 25, 2025

This project shall accomplish a design-build repair of B43131. Repair cracks and spalls on concrete walls, beams, columns, roof, floor slab, and eaves. Install concrete jackets to repair columns along gridlines. Repair to restore integrity of steel members that deteriorated due to corrosion and replace steel members where material loss exceeds 10% of the original thickness. Apply aromatic polyamide (ARAMID) or Fiber Reinforced Polymer (FRP) to canopy beams. Demolish existing ceiling tiles and install new tiles. Remove and reinstall electrical and other fixtures to facilitate repair works as needed. Paint areas that are subjected to repair work and restore original appearance. Demolish and dispose of waste material as appropriate. Abate and dispose of Asbestos Containing Material (ACM) and Lead- Based Paint (LBP). Work for the project is described in more detail in Section 8 of this Statement of Work (SOW). Sustainable principles, to include life cycle cost effective practices shall be integrated into the design, development, and construction of the project(s) in accordance with the latest version of UFC 1-200-02, High Performance and Sustainable

From Solicitation posted on Jul 02, 2025

This project shall accomplish a design-build repair of B43131. Repair cracks and spalls on concrete walls, beams, columns, roof, floor slab, and eaves. Install concrete jackets to repair columns along gridlines. Repair to restore integrity of steel members that deteriorated due to corrosion and replace steel members where material loss exceeds 10% of the original thickness. Apply aromatic polyamide (ARAMID) or Fiber Reinforced Polymer (FRP) to canopy beams. Demolish existing ceiling tiles and install new tiles. Remove and reinstall electrical and other fixtures to facilitate repair works as needed. Paint areas that are subjected to repair work and restore original appearance. Demolish and dispose of waste material as appropriate. Abate and dispose of Asbestos Containing Material (ACM) and Lead- Based Paint (LBP). Work for the project is described in more detail in Section 8 of this Statement of Work (SOW). Sustainable principles, to include life cycle cost effective practices shall be integrated into the design, development, and construction of the project(s) in accordance with the latest version of UFC 1-200-02, High Performance and Sustainable

From Solicitation posted on Jul 03, 2025

This project shall accomplish a design-build repair of B43131. Repair cracks and spalls on concrete walls, beams, columns, roof, floor slab, and eaves. Install concrete jackets to repair columns along gridlines. Repair to restore integrity of steel members that deteriorated due to corrosion and replace steel members where material loss exceeds 10% of the original thickness. Apply aromatic polyamide (ARAMID) or Fiber Reinforced Polymer (FRP) to canopy beams. Demolish existing ceiling tiles and install new tiles. Remove and reinstall electrical and other fixtures to facilitate repair works as needed. Paint areas that are subjected to repair work and restore original appearance. Demolish and dispose of waste material as appropriate. Abate and dispose of Asbestos Containing Material (ACM) and Lead- Based Paint (LBP). Work for the project is described in more detail in Section 8 of this Statement of Work (SOW). Sustainable principles, to include life cycle cost effective practices shall be integrated into the design, development, and construction of the project(s) in accordance with the latest version of UFC 1-200-02, High Performance and Sustainable

From Solicitation posted on Jul 11, 2025

Notice history

5
  1. Presolicitation Posted Jun 17, 2025
  2. Solicitation Posted Jun 25, 2025
    • Title: REPAIR CRACKS AND SPALLS B43131LXFB241032 REPAIR CRACKS AND SPALLS B43131
    • Description: Description was updated
    • Notice Type: PresolicitationSolicitation
    • Response Deadline: Apr 15, 2025Jul 21, 2025
    • Set-Aside: Local Area Set-Aside (FAR 26.2)None
  3. Solicitation Posted Jul 02, 2025
    No changes from previous notice
  4. Solicitation Posted Jul 03, 2025
    No changes from previous notice
  5. Solicitation LATEST Posted Jul 11, 2025
    No changes from previous notice

Details

Solicitation number FA527025R0011
Notice ID f0fb16649ce24b38932020c73186899d
Notice type Presolicitation
Product / Service (PSC) Z2EA
NAICS 236220
Set-aside Local Area Set-Aside (FAR 26.2)
Place of performance JPN
Archive date Dec 31, 2025

Award Information

Not yet awarded

Documents

1
View on SAM.gov

Contacts

primary
Victor T. Cannon Jr.

Email

Phone

secondary
DANIEL RAKOWSKI

Email

Phone

Agency

DEPT OF DEFENSE
DEPT OF THE AIR FORCE
PACIFIC AIR FORCES
FA5270 18 CONS PK

Place of Performance

96368
JPN

Dates

Posted Jun 17, 2025 1 year ago
Last Updated Aug 06, 2026 2 days ago
Due Apr 15, 2025 1 year ago