Summary

AI-generated · Aug 23, 2025

Repair cracks and spalls on concrete walls, beams, columns, roof, floor slab, and eaves; install concrete jackets along column gridlines and roof beams; restore the integrity of steel members deteriorated by corrosion; apply Fiber Reinforced Polymer (FRP) to canopy beams and slabs; remove and reinstall electrical and other fixtures as needed to access work areas; repaint repaired areas to restore original appearance; abate and dispose of asbestos-containing material (ACM) and lead-based paint (LBP); demolish and dispose of waste material as appropriate. Sustainability requirements will be integrated into design and construction per UFC 1-200-02. Construction may begin after Environmental Protection Plan (EPP) approval and work clearance (AF Form 103), with on-site safety coordinated through the 718th Civil Engineer Squadron (718 CES).

Amendments note changes to evaluation and submission requirements: past performance now requires five years (up from three), with no other terms changed. Additional changes include extending the proposal due date and proposal validity, removing the need to submit financial statements with the proposal and removing Past Performance Questionnaires, replacing them with CPAR information for recent and relevant projects, and removing the requirement for a concise proposal summary, master table of contents, and bid guarantee (FAR 52.228-1). No further changes; refer to Sections L and M for submission details.

Repair cracks and spalls on concrete walls, beams, columns, roof, floor slab, and eaves. Repair to install concrete jackets along column gridlines and roof beams. Repair to restore integrity of steel members that deteriorated due to corrosion. Apply Fiber Reinforced Polymer (FRP) to canopy beams and slabs. Remove and reinstall electrical and other fixes to facilitate repair works as needed. Paint areas that are subjected to repair work and restore original appearance. Abate and dispose Asbestos Containing Material (ACM) and Lead-Based Paint (LBP). Demolish and dispose waste material as appropriate. Sustainable principles, to include life cycle cost-effective practices, will be integrated into the design, development, and construction of the project in accordance with UFC 1-200-02. Construction activities may commence after the approval of the Environmental Protection Plan (EPP) and AF Form 103 (work clearance). The Contractor shall coordinate on-site safety requirements through the 718th Civil Engineer Squadron (718 CES).

From Solicitation posted on Jun 18, 2025

Amendment 0001: The purpose of this amendment is to change Section M, from a minimum of three (3) years to five (5) years of past performance. No other terms or conditions have been altered to the solicitation. For questions regarding this amendment, contact Emily Rubino at 315-634-1833 / emily.rubino@us.af.mil.Original Post: Repair cracks and spalls on concrete walls, beams, columns, roof, floor slab, and eaves. Repair to install concrete jackets along column gridlines and roof beams. Repair to restore integrity of steel members that deteriorated due to corrosion. Apply Fiber Reinforced Polymer (FRP) to canopy beams and slabs. Remove and reinstall electrical and other fixes to facilitate repair works as needed. Paint areas that are subjected to repair work and restore original appearance. Abate and dispose Asbestos Containing Material (ACM) and Lead-Based Paint (LBP). Demolish and dispose waste material as appropriate. Sustainable principles, to include life cycle cost-effective practices, will be integrated into the design, development, and construction of the project in accordance with UFC 1-200-02. Construction activities may commence after the approval of the Environmental Protection Plan (EPP) and AF Form 103 (work clearance). The Contractor shall coordinate on-site safety requirements through the 718th Civil Engineer Squadron (718 CES).

From Solicitation posted on Jul 09, 2025

Amendment 0002: The purpose of this amendment is as follows:A) Extend the proposal due date to July 23, 2025, at 2:00 PM (JST). This aligns with the date posted on the Government Point of Entry.B) Revise the proposal validity period to 69 calendar days. Block 13d is hereby changed to reflect this.C) Amend Section L regarding financial statements. The requirement to submit financial statements with the proposal is removed. Financial statements may be requested later to determine responsibility per FAR 9.104-1.D) Amend Sections L and M regarding past performance. The requirement for Past Performance Questionnaires is removed. Offerors will now submit CPAR information for recent and relevant projects. The PPQ attachment has been removed to reflect this change.E) Amend Sections L and M regarding proposal summary and table of contents. The requirement for a concise summary and master table of contents is removed.F) A Bid Guarantee is no longer required and reflected in block 13bG) Removal of clause FAR 52.228-1 Bid Guarantee.H) No other changes at this time.NOTE: Refer to Sections L and M for further details on proposal submission changes.Amendment 0001: The purpose of this amendment is to change Section M, from a minimum of three (3) years to five (5) years of past performance. No other terms or conditions have been altered to the solicitation. For questions regarding this amendment, contact Emily Rubino at 315-634-1833 / emily.rubino@us.af.mil.Original Post: Repair cracks and spalls on concrete walls, beams, columns, roof, floor slab, and eaves. Repair to install concrete jackets along column gridlines and roof beams. Repair to restore integrity of steel members that deteriorated due to corrosion. Apply Fiber Reinforced Polymer (FRP) to canopy beams and slabs. Remove and reinstall electrical and other fixes to facilitate repair works as needed. Paint areas that are subjected to repair work and restore original appearance. Abate and dispose Asbestos Containing Material (ACM) and Lead-Based Paint (LBP). Demolish and dispose waste material as appropriate. Sustainable principles, to include life cycle cost-effective practices, will be integrated into the design, development, and construction of the project in accordance with UFC 1-200-02. Construction activities may commence after the approval of the Environmental Protection Plan (EPP) and AF Form 103 (work clearance). The Contractor shall coordinate on-site safety requirements through the 718th Civil Engineer Squadron (718 CES).Proposals must be submitted no later than 23 July 2025, 1400 (2:00pm) JST.

From Solicitation posted on Jul 11, 2025

Notice history

3
  1. Solicitation Posted Jun 18, 2025
  2. Solicitation Posted Jul 09, 2025
    • Description: Description was updated
  3. Solicitation LATEST Posted Jul 11, 2025
    • Description: Description was updated

Details

Solicitation number FA527025R0020
Notice ID d709c65275e94a7d85e1ddc0b3d4f09c
Notice type Solicitation
Product / Service (PSC) Z2JZ
NAICS 238110
Set-aside No Set aside used
Archive date Jun 18, 2026

Award Information

Not yet awarded

Documents

No files available

View on SAM.gov

Contacts

primary
Christopher Nicolas

Email

Phone

secondary
Emily Rubino

Email

Phone

Agency

DEPT OF DEFENSE
DEPT OF THE AIR FORCE
PACIFIC AIR FORCES
FA5270 18 CONS PK

Dates

Posted Jun 18, 2025 1 year ago
Last Updated Aug 06, 2026 1 day ago
Due Jul 21, 2025 1 year ago