AI-generated · Aug 23, 2025Phase I design-build repairs to Building 110, the Big Gun Shop at Watervliet Arsenal, NY, will be undertaken under a firm-fixed-price contract using a two-phase Best Value Trade Off procurement. The work spans substructure (patching and leveling the concrete slab, trench repair), shell (exterior brick repair, replacement of exterior doors and hardware, roofing repairs), interiors in the main bay area (excluding offices/labs) including interior window refurbishment, interior brick repair, signage replacement, and painting, plus services repairs and upgrades (compressed air, domestic water, steam distribution, standpipe and fire suppression systems, and electrical work supporting system upgrades). Demolition to support repairs, hazardous material abatement, and sustainability requirements are also included.
Unique requirements include a two-phase Best Value Trade Off evaluation under FAR 15.101-1, with an unrestricted competition that provides HubZone price preference. This procurement will involve a Project Labor Agreement (PLA); the applicable PLA compliance must be submitted and reviewed before award, using FAR clause 52.222-33 Alternate I. The project is estimated in the $25M–$100M range.
SOLICITATION DOCUMENT IS PUBLISHED UNDER NOTICE NUMBER W912DS25RA013 Background This project will be the Phase I Repairs to Building 110, Big Gun Shop. Building 110 is a 213,799 square foot industrial and manufacturing building, hosting numerous manufacturing processes in a partial 2?story, red brick, modified rectangular plan. Ceilings in production areas are open to the underside of roof structure with top of roofs ranging from 35 to 117 feet high. This Phase I will be a design build contract. Work will consist of, but not limited too, that following: Substructure (Patch and Level Existing Concrete Slab, Trench Repair); Shell (Exterior Brick Repair, Replacement of Exterior Doors and Door Hardware, Roofing Repairs); Interiors (Main Bay Area Excluding Offices/Labs) (Interior Window Refurbishment, Repair Interior Brick, Replacement of Signage, Painting Interior Walls/Partitions/Ceilings); Services (Compressed Air System Repairs and Upgrades, Domestic Water Repairs, Steam Distribution System Repairs, Standpipe Systems Repairs, Fire Suppression Systems Repairs, Electrical Repairs in Support of System Upgrades/Repairs); Special Construction and Demolition (Demolition to Support Repair Work, Abatement of Hazardous Materials to Support Repair Work, Sustainability Requirements in Support of Phase 1 Repairs) Acquisition Strategy This is a Design-Build (DB) firm-fixed- price contract resulting for a two-phase "Best Value Trade Off" Selection Procedure in accordance with Federal Acquisition Regulation (FAR) 15.101-1 for the Repair Building 110, Big Gun Shop Phase I located at Watervliet Arsenal, NY. The Government will evaluate the proposals in accordance with the Source Selection Criteria, and award a firm fixed price contract to the responsible firm, whose proposal conforms to all the terms and conditions of the solicitation and is fair and reasonable and offers the best overall value to the Government. The NAICS Code is 236220 (Commercial and Institutional Building Construction) Magnitude: $25M-$100M This project is a Unrestricted Full and Open Competition with Hubzone Price Preference NOTE: THIS ACQUISITION WILL INVOLVE A PROJECT LABOR AGREEMENT (PLA). PLEASE REFERENCE THE FEDERAL ACQUISITION REGULATION (FAR) SUBPART 22.503 - POLICY FOR FURTHER INFORMATION ABOUT PLAS. FAR CLAUSE 52.222-33 ALTERNATE I IS USED (ONLY THE APPARENT SUCCESSFUL SUBMITS ITS PLA, PRIOR TO AWARD). THE SUBMISSION WILL BE REVIEWED FOR COMPLIANCE WITH ALL STATUTES, REGULATIONS, E.O.S, AND AGENCY REQUIREMENTS. AWARD SHALL NOT BE MADE UNTIL THE PLA IS FULLY COMPLIANT WITH THE CONTRACT REQUIREMENTS.
From Presolicitation posted on Jun 23, 2025Notice history
1Details
Award Information
Not yet awarded
Contacts
Phone
Phone
Agency
Place of Performance
USA