Contacts, documents and full notice history are available with a subscription.
Presolicitation SBA Expired 3 notices 9 documents

Repair Arctic Utilidor D (FTQW 20-0502) & Utilidor H (FTQW 23-1001) 20-0502_23-1001

Solicitation 20-0502_23-1001 Copied Notice ID 0aaaebb63d2e450083da7b0eeddf1179 Copied DEPT OF DEFENSE — FA5004 354 CONS PK
SAM.gov
Posted
Jul 14, 2025
Deadline
Jul 22, 2025
Set-aside
SBA
NAICS
541330
PSC
C219

Summary

AI-generated · Aug 24, 2025

Design firm teams are being sought to develop the full-length replacement design for all utility systems in Arctic Utilidors D and H. Both facilities, built in the 1950s, are past their useful life with patched pipes and rusted supports, and aging waterproofing/joint sealing is allowing infiltration and inflow that threaten the wastewater treatment plant’s permitted capacity during spring breakup. A hazmat survey will identify asbestos-containing materials and other hazardous substances, with the sites located in contaminated soils. For Utilidor D, design must cover replacement of sewer, water, steam, and condensate piping in the main utilidor and replacement of all lateral lines servicing Butler Buildings 3435–3442 and 3426, while keeping the service to Building 3425 connected to the new network. For Utilidor H, design must replace all utility systems and all lateral lines servicing the associated buildings, and include three additional manholes to achieve a maximum 300-foot spacing between drip legs and traps. The deliverable is 100% design documents due in 216 calendar days, and the submission package should include Instructions to Offers, SF-330, and a Past Performance Questionnaire.

No changes are indicated across the notices; all three records reiterate the same requirement. Submit the stated qualification materials (Instructions to Offers, SF-330, PPQ) for consideration.

The 354th Eielson Contracting Quadron is seeking qualification packages for A&E services for the project below: The Arctic Utilidor D & Arctic Utilidor H were constructed and installed in the 1950's and have exceeded their useful life. Many of the pipes have patches and splices to keep them operational and pipe supports have rusted. In addition, it is suspected there is significant infiltration and inflow (I&I) entering the system through the utilidor infrastructure due to aging waterproofing and concrete joint sealing systems. This is causing the wastewater treatment plant to encroach on its permitted treatment volume during spring break up. Based on previous utilidor projects, it is suspected there will be asbestos-containing material (ACM), but a hazmat survey shall be conducted for both utilities to determine what hazardous materials are present. Both utilidors fall within contaminated soils areas. Utilidor D will need the Design of the full-length replacement of all utility systems, this includes sewer, water, steam, and condensate utility piping in the main utilidor. All lateral lines servicing the Butler Buildings 3435-3442 and Building 3426 shall also be replaced. The existing service to Building 3425 shall remain in place and be connected to the new utility lines. Utilidor H will also need the full-length design of the replacement of all utility systems, all lateral lines servicing the buildings shall be replaced. Also design three additional manholes for Utilidor H to provide a maximum of 300-feet spacing between drip legs and traps. The contract schedule set forth in the statement of work requires a delivery of 100% design documents in 216 calendar days. If this is something your firm is interested in and can accomplish, please submit a combined Instructions to Offers (Evaluation Factors Document), SF330 (Architect-Engineer Qualification-Standard Form 330), and a PPQ (Past Performance Questionnaire).

From Presolicitation posted on Jun 12, 2025

The 354th Eielson Contracting Quadron is seeking qualification packages for A&E services for the project below: The Arctic Utilidor D & Arctic Utilidor H were constructed and installed in the 1950's and have exceeded their useful life. Many of the pipes have patches and splices to keep them operational and pipe supports have rusted. In addition, it is suspected there is significant infiltration and inflow (I&I) entering the system through the utilidor infrastructure due to aging waterproofing and concrete joint sealing systems. This is causing the wastewater treatment plant to encroach on its permitted treatment volume during spring break up. Based on previous utilidor projects, it is suspected there will be asbestos-containing material (ACM), but a hazmat survey shall be conducted for both utilities to determine what hazardous materials are present. Both utilidors fall within contaminated soils areas. Utilidor D will need the Design of the full-length replacement of all utility systems, this includes sewer, water, steam, and condensate utility piping in the main utilidor. All lateral lines servicing the Butler Buildings 3435-3442 and Building 3426 shall also be replaced. The existing service to Building 3425 shall remain in place and be connected to the new utility lines. Utilidor H will also need the full-length design of the replacement of all utility systems, all lateral lines servicing the buildings shall be replaced. Also design three additional manholes for Utilidor H to provide a maximum of 300-feet spacing between drip legs and traps. The contract schedule set forth in the statement of work requires a delivery of 100% design documents in 216 calendar days. If this is something your firm is interested in and can accomplish, please submit a combined Instructions to Offers (Evaluation Factors Document), SF330 (Architect-Engineer Qualification-Standard Form 330), and a PPQ (Past Performance Questionnaire).

From Presolicitation posted on Jul 01, 2025

The 354th Eielson Contracting Quadron is seeking qualification packages for A&E services for the project below: The Arctic Utilidor D & Arctic Utilidor H were constructed and installed in the 1950's and have exceeded their useful life. Many of the pipes have patches and splices to keep them operational and pipe supports have rusted. In addition, it is suspected there is significant infiltration and inflow (I&I) entering the system through the utilidor infrastructure due to aging waterproofing and concrete joint sealing systems. This is causing the wastewater treatment plant to encroach on its permitted treatment volume during spring break up. Based on previous utilidor projects, it is suspected there will be asbestos-containing material (ACM), but a hazmat survey shall be conducted for both utilities to determine what hazardous materials are present. Both utilidors fall within contaminated soils areas. Utilidor D will need the Design of the full-length replacement of all utility systems, this includes sewer, water, steam, and condensate utility piping in the main utilidor. All lateral lines servicing the Butler Buildings 3435-3442 and Building 3426 shall also be replaced. The existing service to Building 3425 shall remain in place and be connected to the new utility lines. Utilidor H will also need the full-length design of the replacement of all utility systems, all lateral lines servicing the buildings shall be replaced. Also design three additional manholes for Utilidor H to provide a maximum of 300-feet spacing between drip legs and traps. The contract schedule set forth in the statement of work requires a delivery of 100% design documents in 216 calendar days. If this is something your firm is interested in and can accomplish, please submit a combined Instructions to Offers (Evaluation Factors Document), SF330 (Architect-Engineer Qualification-Standard Form 330), and a PPQ (Past Performance Questionnaire).

From Presolicitation posted on Jul 14, 2025

Notice history

3
  1. Presolicitation Posted Jun 12, 2025 View
  2. Presolicitation Posted Jul 01, 2025
    No changes from previous notice
  3. Presolicitation LATEST Posted Jul 14, 2025
    • Response Deadline: Jul 14, 2025Jul 22, 2025

Details

Solicitation number 20-0502_23-1001
Notice ID 0aaaebb63d2e450083da7b0eeddf1179
Notice type Presolicitation
Product / Service (PSC) C219
NAICS 541330
Place of performance Eielson AFB, Alaska
Archive date Aug 23, 2025

Award Information

Not yet awarded

Contacts

primary
354 CONS PKA Designs

Email

secondary
Ryan Smith

Email

Phone

Agency

DEPT OF DEFENSE
DEPT OF THE AIR FORCE
PACIFIC AIR FORCES
FA5004 354 CONS PK

Place of Performance

Eielson AFB, Alaska 99702
USA

Dates

Posted Jul 14, 2025 1 year ago
Last Updated Aug 06, 2026 1 day ago
Due Jul 22, 2025 1 year ago